The index
The sum of every move each component has taken since March 11, 2026. Components with zero moves on the record are left off the chart.
Eight questions the reading is built from.
Superintelligence, as si-infra defines it, needs compute, power, a network that makes many sites act as one machine, capability on clean tests, long unsupervised work, outside verification, closed financing, and rules that allow it. Every analysis moves one of these. Some have moved; some are still waiting for evidence.
Net movement by component
ComparedThe data8 rows · sources
| Item | Value | Source |
|---|---|---|
| Compute 15 moves | 5.1 | |
| Energy 8 moves | -0.7 | |
| Fabric 1 move | 0.4 | |
| Capability 17 moves | 5 | |
| Autonomy 6 moves | 2.2 | |
| Verification 10 moves | -4.5 | |
| Capital 12 moves | 2.4 | |
| Governance 15 moves | -1.3 |
| Component | Weight | Moves | Net | Last move |
|---|---|---|---|---|
| Compute Is frontier training and inference compute being built, energized and used at the scale the definition requires? | 0.20 | 15 | +5.1 | Moonshot AI, Nov. 19, 2026 |
| Energy Is the power to run it contracted, interconnected and generating? | 0.15 | 8 | −0.7 | International Energy Agency, Nov. 19, 2026 |
| Fabric Do the networks and interconnects let compute act as one machine across sites? | 0.10 | 1 | +0.4 | Meta, Oct. 19, 2026 |
| Capability Do public systems clear the definition's capability thresholds on tests that stay uncontaminated? | 0.20 | 17 | +5.0 | Google, Nov. 18, 2026 |
| Autonomy Do systems run long, unsupervised, economically useful work with measured reliability? | 0.15 | 6 | +2.2 | METR, Nov. 20, 2026 |
| Verification Can an outsider check what ran, on what, with what result? | 0.10 | 10 | −4.5 | OpenAI, Oct. 22, 2026 |
| Capital Is committed, closed financing paying for the above, or only announced? | 0.05 | 12 | +2.4 | Oracle, Nov. 20, 2026 |
| Governance Do the rules and institutions allow deployment at the scale the definition requires? | 0.05 | 15 | −1.3 | U.S. Senate, Nov. 19, 2026 |
Weights size a move inside its evidence band; they are set in method.json and explained on the method page.