{
  "standard": "docs/DATA-STANDARD.md",
  "generated_from": [
    "content/graphics/*.json",
    "content/*/*.md sources",
    "data/progress/ledger.json"
  ],
  "count": 725,
  "columns": [
    "id",
    "graphic",
    "piece",
    "piece_date",
    "company",
    "kind",
    "label",
    "value",
    "unit",
    "date",
    "source_id",
    "source_urls",
    "source_publisher",
    "source_title",
    "source_date",
    "source_url",
    "component",
    "confidence"
  ],
  "rows": [
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/1",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "ARC-AGI-2 launches; reasoning models score 1 to 1.3 percent",
      "value": null,
      "unit": null,
      "date": "2025-03-24",
      "source_id": "8",
      "source_urls": "https://techcrunch.com/2025/03/24/a-new-challenging-agi-test-stumps-most-ai-models/",
      "source_publisher": "TechCrunch",
      "source_title": "A new, challenging AGI test stumps most AI models",
      "source_date": "2025-03-24",
      "source_url": "https://techcrunch.com/2025/03/24/a-new-challenging-agi-test-stumps-most-ai-models/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/2",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "Results post puts Poetiq's pipeline at 54 percent on ARC-AGI-2",
      "value": null,
      "unit": null,
      "date": "2025-12-05",
      "source_id": "4",
      "source_urls": "https://arcprize.org/blog/arc-prize-2025-results-analysis",
      "source_publisher": "ARC Prize",
      "source_title": "ARC Prize 2025 Results and Analysis",
      "source_date": "2025-12-05",
      "source_url": "https://arcprize.org/blog/arc-prize-2025-results-analysis",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/3",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "Foundation posts the ARC-AGI-3 paper to arXiv",
      "value": null,
      "unit": null,
      "date": "2026-03-24",
      "source_id": "2",
      "source_urls": "https://arxiv.org/abs/2603.24621",
      "source_publisher": "arXiv",
      "source_title": "ARC-AGI-3: A New Challenge for Frontier Agentic Intelligence",
      "source_date": "2026-03-24",
      "source_url": "https://arxiv.org/abs/2603.24621",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/4",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "Launch: humans 100 percent, frontier AI 0.51 percent",
      "value": null,
      "unit": null,
      "date": "2026-03-25",
      "source_id": "1",
      "source_urls": "https://arcprize.org/blog/arc-agi-3-launch",
      "source_publisher": "ARC Prize",
      "source_title": "Announcing ARC-AGI-3",
      "source_date": "2026-03-25",
      "source_url": "https://arcprize.org/blog/arc-agi-3-launch",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/5",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "The Decoder prints per-model scores, Gemini 3.1 Pro Preview first at 0.37",
      "value": null,
      "unit": null,
      "date": "2026-03-26",
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/6",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "Chollet tells Semafor a rapid climb would mark real progress",
      "value": null,
      "unit": null,
      "date": "2026-04-08",
      "source_id": "5",
      "source_urls": "https://www.semafor.com/article/04/08/2026/ai-research-foundation-releases-test-that-will-warn-when-agi-arrives",
      "source_publisher": "Semafor",
      "source_title": "AI research foundation releases test that will warn when AGI arrives",
      "source_date": "2026-04-08",
      "source_url": "https://www.semafor.com/article/04/08/2026/ai-research-foundation-releases-test-that-will-warn-when-agi-arrives",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/floors/7",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/floors",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "event",
      "label": "Goertzel reports 32.58 percent on the 25 public games",
      "value": null,
      "unit": null,
      "date": "2026-05-08",
      "source_id": "7",
      "source_urls": "https://bengoertzel.substack.com/p/playing-around-with-the-arc-agi-3",
      "source_publisher": "Ben Goertzel (Substack)",
      "source_title": "Playing Around with the ARC-AGI-3 Benchmark",
      "source_date": "2026-05-08",
      "source_url": "https://bengoertzel.substack.com/p/playing-around-with-the-arc-agi-3",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/gap/1",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/gap",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "Human testers (all 135 environments)",
      "value": 100,
      "unit": "percent, launch-week score",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/gap/2",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/gap",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "Frontier AI, foundation headline",
      "value": 0.51,
      "unit": "percent, launch-week score",
      "date": null,
      "source_id": "1",
      "source_urls": "https://arcprize.org/blog/arc-agi-3-launch",
      "source_publisher": "ARC Prize",
      "source_title": "Announcing ARC-AGI-3",
      "source_date": "2026-03-25",
      "source_url": "https://arcprize.org/blog/arc-agi-3-launch",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/gap/3",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/gap",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "Gemini 3.1 Pro Preview",
      "value": 0.37,
      "unit": "percent, launch-week score",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/gap/4",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/gap",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "GPT 5.4",
      "value": 0.26,
      "unit": "percent, launch-week score",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/gap/5",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/gap",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "Opus 4.6",
      "value": 0.25,
      "unit": "percent, launch-week score",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/gap/6",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/gap",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "Grok-4.20 (measured 0.00)",
      "value": 0,
      "unit": "percent, launch-week score",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/harness/1",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/harness",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "measure",
      "label": "Opus 4.6 with a hand-crafted harness on a known environment; 0 on an unfamiliar one",
      "value": 97.1,
      "unit": "percent",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/debate/1",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/debate",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "position",
      "label": "François Chollet: True AGI clears tasks ordinary humans clear unaided; a harness written for these games scores the harness, and every public model sits under 1 percent.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "source_publisher": "The Decoder",
      "source_title": "ARC-AGI-3 offers $2M to any AI that matches untrained humans, yet every frontier model scores below 1%",
      "source_date": "2026-03-26",
      "source_url": "https://the-decoder.com/arc-agi-3-offers-2m-to-any-ai-that-matches-untrained-humans-yet-every-frontier-model-scores-below-1/",
      "component": "capability",
      "confidence": "inferred",
      "side": "for"
    },
    {
      "id": "arc-prize-foundation-arc-agi-3-launch/debate/2",
      "graphic": "arc-prize-foundation-arc-agi-3-launch/debate",
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "position",
      "label": "Ben Goertzel: His system reached 32.58 percent on the 25 public games; systems with little claim to general intelligence can plausibly be engineered to score well.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://bengoertzel.substack.com/p/playing-around-with-the-arc-agi-3",
      "source_publisher": "Ben Goertzel (Substack)",
      "source_title": "Playing Around with the ARC-AGI-3 Benchmark",
      "source_date": "2026-05-08",
      "source_url": "https://bengoertzel.substack.com/p/playing-around-with-the-arc-agi-3",
      "component": "capability",
      "confidence": "inferred",
      "side": "against"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/stakes/1",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/stakes",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "measure",
      "label": "GPT-5.5",
      "value": 71.4,
      "unit": "percent pass rate, 21 Expert tasks",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/stakes/2",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/stakes",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Claude Mythos Preview",
      "value": 68.6,
      "unit": "percent pass rate, 21 Expert tasks",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/stakes/3",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/stakes",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "measure",
      "label": "GPT-5.4",
      "value": 52.4,
      "unit": "percent pass rate, 21 Expert tasks",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/stakes/4",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/stakes",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Opus 4.7",
      "value": 48.6,
      "unit": "percent pass rate, 21 Expert tasks",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/sequence/1",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/sequence",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "event",
      "label": "Davies, first author, posts Boundary Point Jailbreaking to arXiv",
      "value": null,
      "unit": null,
      "date": "2026-02-18",
      "source_id": "6",
      "source_urls": "https://arxiv.org/abs/2602.15001",
      "source_publisher": "arXiv",
      "source_title": "Boundary Point Jailbreaking of Black-Box LLMs",
      "source_date": "2026-02-18",
      "source_url": "https://arxiv.org/abs/2602.15001",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/sequence/2",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/sequence",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "event",
      "label": "GPT-5.5 system card prints the jailbreak and the configuration issue",
      "value": null,
      "unit": null,
      "date": "2026-04-23",
      "source_id": "2",
      "source_urls": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "source_publisher": "OpenAI",
      "source_title": "GPT-5.5 System Card",
      "source_date": "2026-04-23",
      "source_url": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/sequence/3",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/sequence",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "event",
      "label": "Davies announces a universal jailbreak in 6 hours of red teaming",
      "value": null,
      "unit": null,
      "date": "2026-04-23",
      "source_id": "5",
      "source_urls": "https://x.com/alxndrdavies/status/2047382086462722104",
      "source_publisher": "X",
      "source_title": "Xander Davies on X: We @AISecurityInst tested GPT-5.5's cyber safeguards",
      "source_date": "2026-04-23",
      "source_url": "https://x.com/alxndrdavies/status/2047382086462722104",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/sequence/4",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/sequence",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "event",
      "label": "Hashim argues the public holds only OpenAI's word on the fix",
      "value": null,
      "unit": null,
      "date": "2026-04-24",
      "source_id": "3",
      "source_urls": "https://www.transformernews.ai/p/openai-shouldnt-be-deciding-if-its-gpt-55",
      "source_publisher": "Transformer",
      "source_title": "GPT-5.5 and the broken state of government evals",
      "source_date": "2026-04-24",
      "source_url": "https://www.transformernews.ai/p/openai-shouldnt-be-deciding-if-its-gpt-55",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/sequence/5",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/sequence",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "event",
      "label": "Mowshowitz reads six hours as a floor for the next attacker",
      "value": null,
      "unit": null,
      "date": "2026-04-27",
      "source_id": "4",
      "source_urls": "https://thezvi.wordpress.com/2026/04/27/gpt-5-5-the-system-card/",
      "source_publisher": "Don't Worry About the Vase",
      "source_title": "GPT 5.5: The System Card",
      "source_date": "2026-04-27",
      "source_url": "https://thezvi.wordpress.com/2026/04/27/gpt-5-5-the-system-card/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/sequence/6",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/sequence",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "event",
      "label": "AISI publishes its evaluation and the 71.4 percent Expert score",
      "value": null,
      "unit": null,
      "date": "2026-04-30",
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/1",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Universal jailbreak across every malicious cyber query OpenAI supplied",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Measured by AISI"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/2",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Six hours of expert red-teaming to build the attack",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Measured by AISI"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/3",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Break held in multi-turn agentic settings",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "source_publisher": "AI Security Institute",
      "source_title": "Our evaluation of OpenAI's GPT-5.5 cyber capabilities",
      "source_date": "2026-04-30",
      "source_url": "https://www.aisi.gov.uk/blog/our-evaluation-of-openais-gpt-5-5-cyber-capabilities",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Measured by AISI"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/4",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "OpenAI's system card repeats the finding",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "source_publisher": "OpenAI",
      "source_title": "GPT-5.5 System Card",
      "source_date": "2026-04-23",
      "source_url": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Measured by AISI"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/5",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Patched safeguard stack shipped at launch",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "source_publisher": "OpenAI",
      "source_title": "GPT-5.5 System Card",
      "source_date": "2026-04-23",
      "source_url": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Awaiting an outside test"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/6",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Launch build blocking verified high-severity jailbreaks from OpenAI's own campaigns",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "source_publisher": "OpenAI",
      "source_title": "GPT-5.5 System Card",
      "source_date": "2026-04-23",
      "source_url": "https://deploymentsafety.openai.com/gpt-5-5/cybersecurity",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Awaiting an outside test"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/ledger/7",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/ledger",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Account monitoring, a layer the red team left untested",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.transformernews.ai/p/openai-shouldnt-be-deciding-if-its-gpt-55",
      "source_publisher": "Transformer",
      "source_title": "GPT-5.5 and the broken state of government evals",
      "source_date": "2026-04-24",
      "source_url": "https://www.transformernews.ai/p/openai-shouldnt-be-deciding-if-its-gpt-55",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Awaiting an outside test"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/debate/1",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/debate",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "position",
      "label": "Xander Davies: AISI tested GPT-5.5's cyber safeguards and built a universal jailbreak in 6 hours of red teaming, with the details printed in OpenAI's system card.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://x.com/alxndrdavies/status/2047382086462722104",
      "source_publisher": "X",
      "source_title": "Xander Davies on X: We @AISecurityInst tested GPT-5.5's cyber safeguards",
      "source_date": "2026-04-23",
      "source_url": "https://x.com/alxndrdavies/status/2047382086462722104",
      "component": "verification",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "openai-aisi-gpt-5-5-jailbreak/debate/2",
      "graphic": "openai-aisi-gpt-5-5-jailbreak/debate",
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "position",
      "label": "Shakeel Hashim: The patch went untested by AISI, leaving OpenAI's word as the public's assurance; a party outside the frontier developers should hold the release decision.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.transformernews.ai/p/openai-shouldnt-be-deciding-if-its-gpt-55",
      "source_publisher": "Transformer",
      "source_title": "GPT-5.5 and the broken state of government evals",
      "source_date": "2026-04-24",
      "source_url": "https://www.transformernews.ai/p/openai-shouldnt-be-deciding-if-its-gpt-55",
      "component": "verification",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "deepseek-caisi-evaluation/elo/1",
      "graphic": "deepseek-caisi-evaluation/elo",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "GPT-5.5",
      "value": 1260,
      "unit": "Elo, CAISI item-response estimate",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/elo/2",
      "graphic": "deepseek-caisi-evaluation/elo",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "Opus 4.6",
      "value": 999,
      "unit": "Elo, CAISI item-response estimate",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/elo/3",
      "graphic": "deepseek-caisi-evaluation/elo",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "DeepSeek V4 Pro",
      "value": 800,
      "unit": "Elo, CAISI item-response estimate",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/elo/4",
      "graphic": "deepseek-caisi-evaluation/elo",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "GPT-5.4 mini",
      "value": 749,
      "unit": "Elo, CAISI item-response estimate",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/1",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Gap to the U.S. frontier: about 8 months",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by CAISI"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/2",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Estimated 800 Elo against 1,260 for GPT-5.5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by CAISI"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/3",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "PortBench, held out: 44 percent against 78 for GPT-5.5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by CAISI"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/4",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "ARC-AGI-2 semi-private: 46 percent against 79",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by CAISI"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/5",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Closest peer: GPT-5, released eight months before",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by CAISI"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/6",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Three to six months behind state-of-the-art frontier models",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/04/24/deepseek-v4-ai-model-price-performance-china-open-source/",
      "source_publisher": "Fortune",
      "source_title": "DeepSeek unveils V4 model, with rock-bottom prices and close integration with Huawei's chips",
      "source_date": "2026-04-24",
      "source_url": "https://fortune.com/2026/04/24/deepseek-v4-ai-model-price-performance-china-open-source/",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Claimed by DeepSeek"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/7",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Marginally short of GPT-5.4 and Gemini 3.1 Pro",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/04/24/deepseek-v4-ai-model-price-performance-china-open-source/",
      "source_publisher": "Fortune",
      "source_title": "DeepSeek unveils V4 model, with rock-bottom prices and close integration with Huawei's chips",
      "source_date": "2026-04-24",
      "source_url": "https://fortune.com/2026/04/24/deepseek-v4-ai-model-price-performance-china-open-source/",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Claimed by DeepSeek"
    },
    {
      "id": "deepseek-caisi-evaluation/claims/8",
      "graphic": "deepseek-caisi-evaluation/claims",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Beside Opus 4.6 and GPT-5.4 on self-reported evaluations",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Claimed by DeepSeek"
    },
    {
      "id": "deepseek-caisi-evaluation/price/1",
      "graphic": "deepseek-caisi-evaluation/price",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "OpenAI GPT-5.5 (April 24)",
      "value": 30,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.theregister.com/2026/04/24/deepseek_v4/",
      "source_publisher": "The Register",
      "source_title": "DeepSeek's new models offer big inference cost savings",
      "source_date": "2026-04-24",
      "source_url": "https://www.theregister.com/2026/04/24/deepseek_v4/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/price/2",
      "graphic": "deepseek-caisi-evaluation/price",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "GPT-5.4 mini",
      "value": 4.5,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/price/3",
      "graphic": "deepseek-caisi-evaluation/price",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "DeepSeek V4 Pro at launch",
      "value": 3.48,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/price/4",
      "graphic": "deepseek-caisi-evaluation/price",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "Late-July rate for V4 Pro (Fortune's figure)",
      "value": 0.87,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "5",
      "source_urls": "https://fortune.com/2026/07/26/china-moonshot-deepseek-zai-kimi-challenging-us-ai-cost/",
      "source_publisher": "Fortune",
      "source_title": "China's Moonshot, Z.AI, and DeepSeek are challenging U.S. AI labs, and beating them on cost",
      "source_date": "2026-07-26",
      "source_url": "https://fortune.com/2026/07/26/china-moonshot-deepseek-zai-kimi-challenging-us-ai-cost/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/price/5",
      "graphic": "deepseek-caisi-evaluation/price",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "Peak-hour rate from Aug. 16 (as Bloomberg reported)",
      "value": 3.96,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "9",
      "source_urls": "https://fortune.com/2026/08/13/deepseek-increases-prices-for-ai-services-by-multiple-times/",
      "source_publisher": "Fortune, via Bloomberg",
      "source_title": "DeepSeek increases prices for AI services by multiple times",
      "source_date": "2026-08-13",
      "source_url": "https://fortune.com/2026/08/13/deepseek-increases-prices-for-ai-services-by-multiple-times/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "deepseek-caisi-evaluation/debate/1",
      "graphic": "deepseek-caisi-evaluation/debate",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "position",
      "label": "Center for AI Standards and Innovation: Held-out tests place DeepSeek V4 Pro beside GPT-5, about 8 months behind the U.S. frontier, a wider gap than DeepSeek's own evaluations show.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": "capability",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "deepseek-caisi-evaluation/debate/2",
      "graphic": "deepseek-caisi-evaluation/debate",
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "position",
      "label": "Ilya Kabanov: Buyers who want frontier capability, operational sovereignty and control over post-training have to choose a Chinese open-weight model, and CAISI's cost table prices the premium.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://theweatherreport.ai/posts/caisi-deepseek-v4-pro/",
      "source_publisher": "The Weather Report",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-04",
      "source_url": "https://theweatherreport.ai/posts/caisi-deepseek-v4-pro/",
      "component": "capability",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "metr-frontier-risk-report/access/1",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "Chose its own tasks and ran them on internal agents",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Run by METR"
    },
    {
      "id": "metr-frontier-risk-report/access/2",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "Read raw chains of thought",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Run by METR"
    },
    {
      "id": "metr-frontier-risk-report/access/3",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "Reviewed long runs and flagged illegitimate wins",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Run by METR"
    },
    {
      "id": "metr-frontier-risk-report/access/4",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "Measured a horizon over two full-time-equivalent days",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Run by METR"
    },
    {
      "id": "metr-frontier-risk-report/access/5",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "Each lab's own word that its model was state of the art",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Kept by the labs"
    },
    {
      "id": "metr-frontier-risk-report/access/6",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "Approval of every public page, with the right to redact",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Kept by the labs"
    },
    {
      "id": "metr-frontier-risk-report/access/7",
      "graphic": "metr-frontier-risk-report/access",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "claim",
      "label": "A silent exit, open until final approval",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "status": "Kept by the labs"
    },
    {
      "id": "metr-frontier-risk-report/horizon/1",
      "graphic": "metr-frontier-risk-report/horizon",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "measure",
      "label": "LessWrong forecast, Opus 4.6 (a week before METR published)",
      "value": 9.5,
      "unit": "hours, 50 percent time horizon",
      "date": null,
      "source_id": "8",
      "source_urls": "https://www.lesswrong.com/posts/WacuyurbABwNv8ziq/estimating-metr-time-horizons-for-claude-opus-4-6-and-gpt-5",
      "source_publisher": "LessWrong",
      "source_title": "Estimating METR Time Horizons for Claude Opus 4.6 and GPT 5.3 Codex (xhigh)",
      "source_date": "2026-02-16",
      "source_url": "https://www.lesswrong.com/posts/WacuyurbABwNv8ziq/estimating-metr-time-horizons-for-claude-opus-4-6-and-gpt-5",
      "component": "autonomy",
      "confidence": "confirmed"
    },
    {
      "id": "metr-frontier-risk-report/horizon/2",
      "graphic": "metr-frontier-risk-report/horizon",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "measure",
      "label": "Claude Opus 4.6, measured (interval 6 to 98 hours)",
      "value": 14.5,
      "unit": "hours, 50 percent time horizon",
      "date": null,
      "source_id": "6",
      "source_urls": "https://officechai.com/ai/exponential-progress-claude-opus-4-6-has-50-time-horizon-of-14-5-hours-on-metr-time-horizons-benchmark/",
      "source_publisher": "OfficeChai",
      "source_title": "Exponential Progress: Claude Opus 4.6 Has 50% Time Horizon Of 14.5 Hours On METR Time Horizons Benchmark",
      "source_date": "2026-02-21",
      "source_url": "https://officechai.com/ai/exponential-progress-claude-opus-4-6-has-50-time-horizon-of-14-5-hours-on-metr-time-horizons-benchmark/",
      "component": "autonomy",
      "confidence": "confirmed"
    },
    {
      "id": "metr-frontier-risk-report/horizon/3",
      "graphic": "metr-frontier-risk-report/horizon",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "measure",
      "label": "Suite's reliable ceiling (METR's own caution)",
      "value": 16,
      "unit": "hours, 50 percent time horizon",
      "date": null,
      "source_id": "2",
      "source_urls": "https://metr.org/time-horizons/",
      "source_publisher": "METR",
      "source_title": "Task-Completion Time Horizons of Frontier AI Models",
      "source_date": "2026-05-08",
      "source_url": "https://metr.org/time-horizons/",
      "component": "autonomy",
      "confidence": "confirmed"
    },
    {
      "id": "metr-frontier-risk-report/horizon/4",
      "graphic": "metr-frontier-risk-report/horizon",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "measure",
      "label": "Internal agents, Feb. to March (floor: over two full-time-equivalent days)",
      "value": 16,
      "unit": "hours, 50 percent time horizon",
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed"
    },
    {
      "id": "metr-frontier-risk-report/cheating/1",
      "graphic": "metr-frontier-risk-report/cheating",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "measure",
      "label": "At least this share of successful runs past eight hours proved illegitimate on review",
      "value": 16,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed"
    },
    {
      "id": "metr-frontier-risk-report/debate/1",
      "graphic": "metr-frontier-risk-report/debate",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "position",
      "label": "METR: Its own tasks, run on internal agents from four labs, measured a horizon over two full-time-equivalent days on a suite the agents essentially saturated.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": "autonomy",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "metr-frontier-risk-report/debate/2",
      "graphic": "metr-frontier-risk-report/debate",
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "position",
      "label": "Gary Marcus: Reliability is the core problem for generative AI; a graph that demands only 50 percent success leaves reliable performance unaddressed, and few exponential processes keep doubling.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://garymarcus.substack.com/p/misplaced-panic-over-ai-progress",
      "source_publisher": "Marcus on AI",
      "source_title": "Misplaced panic over AI progress",
      "source_date": "2026-05-10",
      "source_url": "https://garymarcus.substack.com/p/misplaced-panic-over-ai-progress",
      "component": "autonomy",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/1",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Whaling tells Fortune a resource limit sits beside the safety case",
      "value": null,
      "unit": null,
      "date": "2026-04-10",
      "source_id": "5",
      "source_urls": "https://www.fortune.com/2026/04/10/anthropic-too-dangerous-to-release-ai-model-means-for-its-upcoming-ipo",
      "source_publisher": "Fortune",
      "source_title": "What Anthropic's too-dangerous-to-release AI model means for its upcoming IPO",
      "source_date": "2026-04-10",
      "source_url": "https://www.fortune.com/2026/04/10/anthropic-too-dangerous-to-release-ai-model-means-for-its-upcoming-ipo",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/2",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Fable 5 ships at $10 and $50 per million tokens",
      "value": null,
      "unit": null,
      "date": "2026-06-09",
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic's Claude Fable 5 is a version of Mythos the public can access today",
      "source_date": "2026-06-09",
      "source_url": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/3",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Mythos 5 goes to Glasswing partners and select biology researchers",
      "value": null,
      "unit": null,
      "date": "2026-06-09",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/4",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Willison tests for 5.5 hours and pays $110.42",
      "value": null,
      "unit": null,
      "date": "2026-06-09",
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Initial impressions of Claude Fable 5",
      "source_date": "2026-06-09",
      "source_url": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/5",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Fortune reports a frontier-research limit in the 319-page system card",
      "value": null,
      "unit": null,
      "date": "2026-06-10",
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic walks back covert capability limits on Claude Fable 5 after being accused of 'secret sabotage' by AI researchers and developers",
      "source_date": "2026-06-10",
      "source_url": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/6",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Anthropic reverses and apologizes for the tradeoff",
      "value": null,
      "unit": null,
      "date": "2026-06-10",
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic walks back covert capability limits on Claude Fable 5 after being accused of 'secret sabotage' by AI researchers and developers",
      "source_date": "2026-06-10",
      "source_url": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/7",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Subscription plans carry Fable 5 through this date",
      "value": null,
      "unit": null,
      "date": "2026-06-22",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/days/8",
      "graphic": "anthropic-fable-5-mythos-5/days",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Usage credits apply until capacity allows a return",
      "value": null,
      "unit": null,
      "date": "2026-06-23",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/1",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic sells at $10 in, $50 out Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic's Claude Fable 5 is a version of Mythos the public can access today",
      "source_date": "2026-06-09",
      "source_url": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/2",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic lifts some safeguards, limits who gets it Claude Mythos 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/3",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Claude Fable 5 routes flagged requests to Claude Opus 4.8",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/4",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Claude Mythos 5 replaces Preview for Glasswing partners Project Glasswing",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/5",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Cursor Truell: long-horizon problems opened up Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/6",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "GitHub Rodriguez: long-horizon coding with autonomy Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/7",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Cognition Wu: top score on FrontierBench Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/8",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Stripe 50-million-line Ruby migration in one day Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/9",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Simon Willison tested 5.5 hours for $110.42 Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Initial impressions of Claude Fable 5",
      "source_date": "2026-06-09",
      "source_url": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/who/10",
      "graphic": "anthropic-fable-5-mythos-5/who",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Jeremy Howard top lab keeps top model for research Anthropic",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic walks back covert capability limits on Claude Fable 5 after being accused of 'secret sabotage' by AI researchers and developers",
      "source_date": "2026-06-10",
      "source_url": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/1",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "$10 input and $50 output per million tokens",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic's Claude Fable 5 is a version of Mythos the public can access today",
      "source_date": "2026-06-09",
      "source_url": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked outside Anthropic"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/2",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Willison: 5.5 hours of testing, a $110.42 bill",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Initial impressions of Claude Fable 5",
      "source_date": "2026-06-09",
      "source_url": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked outside Anthropic"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/3",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "One million token context and 128,000 output tokens, per Willison",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Initial impressions of Claude Fable 5",
      "source_date": "2026-06-09",
      "source_url": "https://simonwillison.net/2026/Jun/9/claude-fable-5/",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked outside Anthropic"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/4",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Frontier-research limit found in the 319-page system card",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic walks back covert capability limits on Claude Fable 5 after being accused of 'secret sabotage' by AI researchers and developers",
      "source_date": "2026-06-10",
      "source_url": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked outside Anthropic"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/5",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Anthropic's apology for the tradeoff, on the record",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic walks back covert capability limits on Claude Fable 5 after being accused of 'secret sabotage' by AI researchers and developers",
      "source_date": "2026-06-10",
      "source_url": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked outside Anthropic"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/6",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Stripe's 50-million-line Ruby migration in one day",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own figures, unreproduced"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/7",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Safeguards fire in under 5 percent of sessions",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own figures, unreproduced"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/8",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Strong drug design candidates on nine of fourteen targets",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own figures, unreproduced"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/9",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Hypotheses preferred about 80 percent of the time",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own figures, unreproduced"
    },
    {
      "id": "anthropic-fable-5-mythos-5/ledger/10",
      "graphic": "anthropic-fable-5-mythos-5/ledger",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "claim",
      "label": "1,000 hours of bug bounty testing, in Anthropic's account",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic's Claude Fable 5 is a version of Mythos the public can access today",
      "source_date": "2026-06-09",
      "source_url": "https://techcrunch.com/2026/06/09/anthropics-claude-fable-5-is-a-version-of-mythos-the-public-can-access-today/",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own figures, unreproduced"
    },
    {
      "id": "anthropic-fable-5-mythos-5/debate/1",
      "graphic": "anthropic-fable-5-mythos-5/debate",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "position",
      "label": "Michael Truell: Fable 5 opened up a class of long-horizon problems that earlier models left out of reach.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Fable 5 and Claude Mythos 5",
      "source_date": "2026-06-09",
      "source_url": "https://www.anthropic.com/news/claude-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "anthropic-fable-5-mythos-5/debate/2",
      "graphic": "anthropic-fable-5-mythos-5/debate",
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "position",
      "label": "Jeremy Howard: Anthropic chose the opposite of the safe path, letting itself, the current top lab, use its top model for frontier AI research.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic walks back covert capability limits on Claude Fable 5 after being accused of 'secret sabotage' by AI researchers and developers",
      "source_date": "2026-06-10",
      "source_url": "https://fortune.com/2026/06/10/anthropic-accu-claude-fable-5-limits-capabilities-ai-researchers-developers/",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "anthropic-export-controls/evening/1",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Commerce delivers the export control directive at 5:21 pm Eastern",
      "value": null,
      "unit": null,
      "date": "2026-06-12",
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/evening/2",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Anthropic switches off Fable 5 and Mythos 5 for every customer",
      "value": null,
      "unit": null,
      "date": "2026-06-12",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/evening/3",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Claude Opus 4.8 and the older models stay online",
      "value": null,
      "unit": null,
      "date": "2026-06-12",
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/evening/4",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Fortune carries Girnus, Ball and Marcus on the order",
      "value": null,
      "unit": null,
      "date": "2026-06-13",
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/evening/5",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Open letter to Lutnick and Cairncross reaches 76 signatures",
      "value": null,
      "unit": null,
      "date": "2026-06-15",
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/evening/6",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Carchidi calls the directive ad hoc, ahead of any agreed threshold",
      "value": null,
      "unit": null,
      "date": "2026-06-15",
      "source_id": "4",
      "source_urls": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "source_publisher": "Forecast International",
      "source_title": "Echoes of Export Control Past: Assessing the Anthropic \"Fable\" Suspension",
      "source_date": "2026-06-15",
      "source_url": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/evening/7",
      "graphic": "anthropic-export-controls/evening",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "event",
      "label": "Hoefer sets out two rival theories of model export control",
      "value": null,
      "unit": null,
      "date": "2026-06-15",
      "source_id": "5",
      "source_urls": "https://www.techpolicy.press/did-the-us-government-just-set-an-ai-export-precedent-by-blocking-mythos/",
      "source_publisher": "TechPolicy.Press",
      "source_title": "Did the US Government Just Set An AI Export Precedent by Blocking Mythos?",
      "source_date": "2026-06-15",
      "source_url": "https://www.techpolicy.press/did-the-us-government-just-set-an-ai-export-precedent-by-blocking-mythos/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/1",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Amazon researchers prompted it to fix a codebase's flaws Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/2",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Commerce Department directive at 5:21 pm Eastern, June 12 Anthropic",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/3",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic switched off for every customer Claude Fable 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/4",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic dark worldwide by that evening Claude Mythos 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/5",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic kept online Claude Opus 4.8",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/6",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Dario Amodei asked that government hold power to block deployment Commerce Department",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "source_publisher": "Forecast International",
      "source_title": "Echoes of Export Control Past: Assessing the Anthropic \"Fable\" Suspension",
      "source_date": "2026-06-15",
      "source_url": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/7",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Peter Girnus wrote the legal predicate itself Anthropic",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/8",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Howard Lutnick serves as Commerce Secretary Commerce Department",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/9",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Open letter, 76 signatures the order took the best models from defenders Howard Lutnick",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/who/10",
      "graphic": "anthropic-export-controls/who",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Open letter, 76 signatures addressed to the National Cyber Director Sean Cairncross",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-export-controls/debate/1",
      "graphic": "anthropic-export-controls/debate",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "position",
      "label": "Peter Girnus: Anthropic called its product a munition in every press release, so Commerce took Anthropic at its word; Anthropic wrote the legal predicate and called it a brand.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "anthropic-export-controls/debate/2",
      "graphic": "anthropic-export-controls/debate",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "position",
      "label": "Anthropic: A narrow potential jailbreak is poor cause to recall a model serving hundreds of millions; applied industry-wide, the standard would halt every new frontier deployment.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "anthropic-export-controls/ledger/1",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Directive received at 5:21 pm Eastern on Friday, June 12",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "The order, on the record"
    },
    {
      "id": "anthropic-export-controls/ledger/2",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Fable 5 and Mythos 5 dark for every customer worldwide",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed",
      "status": "The order, on the record"
    },
    {
      "id": "anthropic-export-controls/ledger/3",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Scope covers every foreign national, Anthropic's own visa-holding staff included",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed",
      "status": "The order, on the record"
    },
    {
      "id": "anthropic-export-controls/ledger/4",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Government evidence reached Anthropic in verbal form only",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed",
      "status": "The order, on the record"
    },
    {
      "id": "anthropic-export-controls/ledger/5",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Claude Opus 4.8 and the older models stayed online",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "The order, on the record"
    },
    {
      "id": "anthropic-export-controls/ledger/6",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Anthropic says it is working to restore access",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic disables Fable and Mythos AI models after U.S. government bars it from giving foreigners access",
      "source_date": "2026-06-13",
      "source_url": "https://fortune.com/2026/06/13/anthropic-disables-fable-mythos-export-controls-national-security-threat/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Holding the step at the floor"
    },
    {
      "id": "anthropic-export-controls/ledger/7",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Surfaced flaws appear relatively simple and previously known, per Anthropic",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Holding the step at the floor"
    },
    {
      "id": "anthropic-export-controls/ledger/8",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Letter signatories run other models for security audits every day",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "source_publisher": "Cybersecurity Dive",
      "source_title": "Cybersecurity experts blast US government for restricting Anthropic's AI models",
      "source_date": "2026-06-15",
      "source_url": "https://www.cybersecuritydive.com/news/anthropic-us-government-export-ban-mythos-fable/822909/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Holding the step at the floor"
    },
    {
      "id": "anthropic-export-controls/ledger/9",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Executive order gives officials 60 days to build benchmarks",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "source_publisher": "Forecast International",
      "source_title": "Echoes of Export Control Past: Assessing the Anthropic \"Fable\" Suspension",
      "source_date": "2026-06-15",
      "source_url": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Holding the step at the floor"
    },
    {
      "id": "anthropic-export-controls/ledger/10",
      "graphic": "anthropic-export-controls/ledger",
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Directive arrived ad hoc, ahead of any testing threshold",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "source_publisher": "Forecast International",
      "source_title": "Echoes of Export Control Past: Assessing the Anthropic \"Fable\" Suspension",
      "source_date": "2026-06-15",
      "source_url": "https://dsm.forecastinternational.com/2026/06/15/echoes-of-export-control-past-assessing-the-anthropic-fable-suspension/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Holding the step at the floor"
    },
    {
      "id": "anthropic-fable-5-returns/days/1",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Fable 5 launches at $10 and $50 per million tokens, safeguards attached",
      "value": null,
      "unit": null,
      "date": "2026-06-09",
      "source_id": "9",
      "source_urls": "https://www.theregister.com/ai-and-ml/2026/06/09/anthropic-spins-a-fable-of-a-tamer-safer-mythos/5253106",
      "source_publisher": "The Register",
      "source_title": "Anthropic spins a Fable of a tamer, safer Mythos",
      "source_date": "2026-06-09",
      "source_url": "https://www.theregister.com/ai-and-ml/2026/06/09/anthropic-spins-a-fable-of-a-tamer-safer-mythos/5253106",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/2",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Directive at 5:21 pm Eastern switches off Fable 5 and Mythos 5",
      "value": null,
      "unit": null,
      "date": "2026-06-12",
      "source_id": "2",
      "source_urls": "https://www.anthropic.com/news/fable-mythos-access",
      "source_publisher": "Anthropic",
      "source_title": "Statement on the directive to suspend Fable 5 access",
      "source_date": "2026-06-12",
      "source_url": "https://www.anthropic.com/news/fable-mythos-access",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/3",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Moussouris: a 'fix this code' prompt triggered the control",
      "value": null,
      "unit": null,
      "date": "2026-06-15",
      "source_id": "4",
      "source_urls": "https://www.theregister.com/security/2026/06/15/feds-freaked-over-fable-5-after-simple-fix-this-code-prompt-not-jailbreak-says-researcher/5255827",
      "source_publisher": "The Register",
      "source_title": "Feds freaked over Fable 5 after simple 'fix this code' prompt, not jailbreak, says researcher",
      "source_date": "2026-06-15",
      "source_url": "https://www.theregister.com/security/2026/06/15/feds-freaked-over-fable-5-after-simple-fix-this-code-prompt-not-jailbreak-says-researcher/5255827",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/4",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Fortune reports an open letter from around 100 security professionals",
      "value": null,
      "unit": null,
      "date": "2026-06-15",
      "source_id": "7",
      "source_urls": "https://fortune.com/2026/06/15/fix-this-code-three-words-behind-us-government-shut-down-anthropic-fable-mythos-ai-models-katie-moussouris-open-letter/",
      "source_publisher": "Fortune",
      "source_title": "'Fix this code.' The three little words behind the U.S. government decision that shut down Anthropic's Fable and Mythos AI models",
      "source_date": "2026-06-15",
      "source_url": "https://fortune.com/2026/06/15/fix-this-code-three-words-behind-us-government-shut-down-anthropic-fable-mythos-ai-models-katie-moussouris-open-letter/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/5",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Lutnick clears Mythos 5 for more than 100 US institutions",
      "value": null,
      "unit": null,
      "date": "2026-06-26",
      "source_id": "6",
      "source_urls": "https://www.semafor.com/article/06/27/2026/us-releases-powerful-anthropic-model-mythos-to-some-us-companies",
      "source_publisher": "Semafor",
      "source_title": "Exclusive: US releases powerful Anthropic model Mythos to some US companies",
      "source_date": "2026-06-26",
      "source_url": "https://www.semafor.com/article/06/27/2026/us-releases-powerful-anthropic-model-mythos-to-some-us-companies",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/6",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Commerce lifts the controls; Anthropic publishes its redeployment note",
      "value": null,
      "unit": null,
      "date": "2026-06-30",
      "source_id": "1;3",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5 https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/7",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Fable 5 returns to every market behind a retrained classifier",
      "value": null,
      "unit": null,
      "date": "2026-07-01",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/days/8",
      "graphic": "anthropic-fable-5-returns/days",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "event",
      "label": "Kahn calls the arrangement a licensing regime that officials deny",
      "value": null,
      "unit": null,
      "date": "2026-07-02",
      "source_id": "5",
      "source_urls": "https://fortune.com/2026/07/02/anthropic-fable-and-mythos-are-restored-but-us-ai-policy-is-still-a-mess/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic's Fable and Mythos models are back. But U.S. AI policy is still a mess.",
      "source_date": "2026-07-02",
      "source_url": "https://fortune.com/2026/07/02/anthropic-fable-and-mythos-are-restored-but-us-ai-policy-is-still-a-mess/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/block/1",
      "graphic": "anthropic-fable-5-returns/block",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Over this share of Amazon-technique attempts blocked by the retrained classifier, by Anthropic's count",
      "value": 99,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-fable-5-returns/debate/1",
      "graphic": "anthropic-fable-5-returns/debate",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "position",
      "label": "Howard Lutnick: Safeguards are in place: Anthropic agreed to detect security risks, work with the government on standards for future releases, and report malicious activity.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3;6",
      "source_urls": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/ https://www.semafor.com/article/06/27/2026/us-releases-powerful-anthropic-model-mythos-to-some-us-companies",
      "source_publisher": "TechCrunch",
      "source_title": "Trump drops restrictions on Anthropic's Mythos and Fable models",
      "source_date": "2026-06-30",
      "source_url": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "component": "governance",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "anthropic-fable-5-returns/debate/2",
      "graphic": "anthropic-fable-5-returns/debate",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "position",
      "label": "Katie Moussouris: A plain 'fix this code' prompt plus manual steps belongs outside export control, and blocking defensive requests leaves models worse at finding bugs and verifying patches.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.theregister.com/security/2026/06/15/feds-freaked-over-fable-5-after-simple-fix-this-code-prompt-not-jailbreak-says-researcher/5255827",
      "source_publisher": "The Register",
      "source_title": "Feds freaked over Fable 5 after simple 'fix this code' prompt, not jailbreak, says researcher",
      "source_date": "2026-06-15",
      "source_url": "https://www.theregister.com/security/2026/06/15/feds-freaked-over-fable-5-after-simple-fix-this-code-prompt-not-jailbreak-says-researcher/5255827",
      "component": "governance",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/1",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Commerce lifted the controls on both models on June 30",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "source_publisher": "TechCrunch",
      "source_title": "Trump drops restrictions on Anthropic's Mythos and Fable models",
      "source_date": "2026-06-30",
      "source_url": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written and in force"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/2",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Lutnick listed Anthropic's commitments on detection, standards and reporting",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "source_publisher": "TechCrunch",
      "source_title": "Trump drops restrictions on Anthropic's Mythos and Fable models",
      "source_date": "2026-06-30",
      "source_url": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written and in force"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/3",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Classifier blocks the Amazon technique in over 99 percent of cases",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written and in force"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/4",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Mythos 5 cleared for more than 100 US institutions",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.semafor.com/article/06/27/2026/us-releases-powerful-anthropic-model-mythos-to-some-us-companies",
      "source_publisher": "Semafor",
      "source_title": "Exclusive: US releases powerful Anthropic model Mythos to some US companies",
      "source_date": "2026-06-26",
      "source_url": "https://www.semafor.com/article/06/27/2026/us-releases-powerful-anthropic-model-mythos-to-some-us-companies",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written and in force"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/5",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "HackerOne bug bounty opened beside the redeployment",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://thehackernews.com/2026/07/anthropic-restores-claude-fable-5-after.html",
      "source_publisher": "The Hacker News",
      "source_title": "Anthropic Restores Claude Fable 5 After U.S. Lifts Jailbreak-Linked Export Controls",
      "source_date": "2026-07-01",
      "source_url": "https://thehackernews.com/2026/07/anthropic-restores-claude-fable-5-after.html",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written and in force"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/6",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Severity framework remains a proposal among Glasswing partners",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Proposed or unwritten"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/7",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Four scoring criteria: capability gain, breadth, weaponization ease, discoverability",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Proposed or unwritten"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/8",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Commitments offered voluntarily before the directive, per TechCrunch",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "source_publisher": "TechCrunch",
      "source_title": "Trump drops restrictions on Anthropic's Mythos and Fable models",
      "source_date": "2026-06-30",
      "source_url": "https://techcrunch.com/2026/06/30/trump-drops-restrictions-on-anthropics-mythos-and-fable-models/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Proposed or unwritten"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/9",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Kahn: a licensing regime officials deny exists",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://fortune.com/2026/07/02/anthropic-fable-and-mythos-are-restored-but-us-ai-policy-is-still-a-mess/",
      "source_publisher": "Fortune",
      "source_title": "Anthropic's Fable and Mythos models are back. But U.S. AI policy is still a mess.",
      "source_date": "2026-07-02",
      "source_url": "https://fortune.com/2026/07/02/anthropic-fable-and-mythos-are-restored-but-us-ai-policy-is-still-a-mess/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Proposed or unwritten"
    },
    {
      "id": "anthropic-fable-5-returns/ledger/10",
      "graphic": "anthropic-fable-5-returns/ledger",
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Refusals of reasonable coding requests rise, at a rate still unpublished",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/redeploying-fable-5",
      "source_publisher": "Anthropic",
      "source_title": "Redeploying Claude Fable 5",
      "source_date": "2026-06-30",
      "source_url": "https://www.anthropic.com/news/redeploying-fable-5",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Proposed or unwritten"
    },
    {
      "id": "anthropic-opus-5/arc/1",
      "graphic": "anthropic-opus-5/arc",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "measure",
      "label": "GPT-5.6 Sol, prior best (maximum effort)",
      "value": 7.8,
      "unit": "percent on ARC-AGI-3",
      "date": null,
      "source_id": "8",
      "source_urls": "https://officechai.com/ai/claude-opus-5-arc-agi-3/",
      "source_publisher": "OfficeChai",
      "source_title": "Claude Opus Scores 30% On ARC-AGI 3, Triples Previous Best Score By Any Model",
      "source_date": "2026-07-24",
      "source_url": "https://officechai.com/ai/claude-opus-5-arc-agi-3/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5/arc/2",
      "graphic": "anthropic-opus-5/arc",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Claude Opus 5 (high effort, the one setting run)",
      "value": 30.16,
      "unit": "percent on ARC-AGI-3",
      "date": null,
      "source_id": "3",
      "source_urls": "https://arcprize.org/results/anthropic-claude-opus-5",
      "source_publisher": "ARC Prize",
      "source_title": "Claude Opus 5 - ARC-AGI Results",
      "source_date": "2026-07-24",
      "source_url": "https://arcprize.org/results/anthropic-claude-opus-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5/ledger/1",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "ARC-AGI-3: 30.16 percent at high effort, posted July 24",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://arcprize.org/results/anthropic-claude-opus-5",
      "source_publisher": "ARC Prize",
      "source_title": "Claude Opus 5 - ARC-AGI Results",
      "source_date": "2026-07-24",
      "source_url": "https://arcprize.org/results/anthropic-claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured outside Anthropic"
    },
    {
      "id": "anthropic-opus-5/ledger/2",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Five Public Demo environments completed that had stood against every earlier model",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://arcprize.org/results/anthropic-claude-opus-5",
      "source_publisher": "ARC Prize",
      "source_title": "Claude Opus 5 - ARC-AGI Results",
      "source_date": "2026-07-24",
      "source_url": "https://arcprize.org/results/anthropic-claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured outside Anthropic"
    },
    {
      "id": "anthropic-opus-5/ledger/3",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Older boards: 97.5 percent on ARC-AGI-1, 90.4 on ARC-AGI-2, maximum effort",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://arcprize.org/results/anthropic-claude-opus-5",
      "source_publisher": "ARC Prize",
      "source_title": "Claude Opus 5 - ARC-AGI Results",
      "source_date": "2026-07-24",
      "source_url": "https://arcprize.org/results/anthropic-claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured outside Anthropic"
    },
    {
      "id": "anthropic-opus-5/ledger/4",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Artificial Analysis leaderboard puts Opus 5 ahead of Fable 5, per Willison",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://simonwillison.net/2026/Jul/24/introducing-claude-opus-5/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://simonwillison.net/2026/Jul/24/introducing-claude-opus-5/",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured outside Anthropic"
    },
    {
      "id": "anthropic-opus-5/ledger/5",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Epoch Capabilities Index places Opus 5 behind Fable 5 and GPT-5.6",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.mindstudio.ai/blog/claude-opus-5-benchmarks-explained",
      "source_publisher": "MindStudio",
      "source_title": "Claude Opus 5 Benchmarks: The Numbers Anthropic Didn't Headline",
      "source_date": "2026-07-26",
      "source_url": "https://www.mindstudio.ai/blog/claude-opus-5-benchmarks-explained",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured outside Anthropic"
    },
    {
      "id": "anthropic-opus-5/ledger/6",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Frontier-Bench v0.1: more than double Opus 4.8, internal run on mini-SWE-agent",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own runs"
    },
    {
      "id": "anthropic-opus-5/ledger/7",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Mean reward over 5 attempts per task, on a GKE backend",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own runs"
    },
    {
      "id": "anthropic-opus-5/ledger/8",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "OSWorld 2.0: Fable 5's best result at just over a third of the cost",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own runs"
    },
    {
      "id": "anthropic-opus-5/ledger/9",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Zapier AutomationBench: around 1.5 times the next-best model at equal cost",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own runs"
    },
    {
      "id": "anthropic-opus-5/ledger/10",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Classifiers expected to intervene around 85 percent less often than Fable 5's",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own runs"
    },
    {
      "id": "anthropic-opus-5/ledger/11",
      "graphic": "anthropic-opus-5/ledger",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Long-running autonomous research: important limitations, conceded on the same page",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Anthropic's own runs"
    },
    {
      "id": "anthropic-opus-5/price/1",
      "graphic": "anthropic-opus-5/price",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Claude Opus 4.8",
      "value": 25,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5/price/2",
      "graphic": "anthropic-opus-5/price",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Claude Opus 5 (close to Fable 5, in Anthropic's account)",
      "value": 25,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5/price/3",
      "graphic": "anthropic-opus-5/price",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Claude Fable 5",
      "value": 50,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5/debate/1",
      "graphic": "anthropic-opus-5/debate",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "position",
      "label": "Sualeh Asif: Opus 5 delivers intelligence near Fable 5's at Opus speed and Opus cost.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5",
      "source_date": "2026-07-24",
      "source_url": "https://www.anthropic.com/news/claude-opus-5",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "anthropic-opus-5/debate/2",
      "graphic": "anthropic-opus-5/debate",
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "position",
      "label": "Gennaro Cuofano: A score belongs to a model, its harness and its evaluation set together; base Opus 5 at 30.16 percent against a scaffolded 100 makes the harness most of the result.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://fourweekmba.com/ai-claude-opus-5-arc-agi-benchmark-harness-scaffolding/",
      "source_publisher": "FourWeekMBA",
      "source_title": "Claude Opus 5 Scores 97.5% and 30.16% Simultaneously, and Both Numbers Are Correct",
      "source_date": "2026-09-26",
      "source_url": "https://fourweekmba.com/ai-claude-opus-5-arc-agi-benchmark-harness-scaffolding/",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/1",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic set the goal and the environment Internal model",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/2",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Internal model roughly comparable, in Anthropic's account Claude Fable 5.1",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/3",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Internal model 13 million lines in eleven days Lean kernel",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/4",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Lean kernel reduces every step to them Axioms of mathematics",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/5",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Buzzard's Lean group two years of Lean infrastructure Lean kernel",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/6",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Kevin Buzzard leads the human effort since 2024 Buzzard's Lean group",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/check/7",
      "graphic": "anthropic-fermat-eleven-days/check",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Kevin Buzzard reviewed the finished proof and vouched for it Internal model",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/days/1",
      "graphic": "anthropic-fermat-eleven-days/days",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Continuous autonomous run, Aug. 7 to Aug. 18, with Lean's kernel as the only judge",
      "value": 11,
      "unit": "days",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/1",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Whole proof compiles under Lean's kernel",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked by the kernel and Buzzard"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/2",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Axioms of mathematics are its only assumptions",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked by the kernel and Buzzard"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/3",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "13 million lines of Lean and 29,500 intermediate theorems",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked by the kernel and Buzzard"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/4",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Roughly 6 billion output tokens across the run",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked by the kernel and Buzzard"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/5",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Buzzard reviewed the result and vouched for the proof",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked by the kernel and Buzzard"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/6",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Model is internal, and Anthropic alone has run it",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Holding the step at reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/7",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Theorem settled by Wiles in 1995, its Lean route partly mapped",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Holding the step at reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/8",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Eleven days is Anthropic's figure, marked as such by Buzzard",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "status": "Holding the step at reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/9",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Kokotajlo moved his central estimate to around 2030",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://futuresearch.ai/blog/ai-2027-6-months-later/",
      "source_publisher": "FutureSearch",
      "source_title": "AI 2027, six months later",
      "source_date": "2026",
      "source_url": "https://futuresearch.ai/blog/ai-2027-6-months-later/",
      "component": "capability",
      "confidence": "reported",
      "status": "Holding the step at reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/ledger/10",
      "graphic": "anthropic-fermat-eleven-days/ledger",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Marcus: all four panelists judge LLMs alone insufficient for AGI",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://x.com/GaryMarcus/status/2079198946938048544",
      "source_publisher": "X",
      "source_title": "Gary Marcus on X: None of the four of us believe that LLMs on their own are sufficient for AGI",
      "source_date": "2026-07",
      "source_url": "https://x.com/GaryMarcus/status/2079198946938048544",
      "component": "capability",
      "confidence": "reported",
      "status": "Holding the step at reported"
    },
    {
      "id": "anthropic-fermat-eleven-days/debate/1",
      "graphic": "anthropic-fermat-eleven-days/debate",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "position",
      "label": "Kevin Buzzard: An extraordinary autoformalization proves Fermat's Last Theorem with the axioms of mathematics as its only assumptions; the eleven days are Anthropic's figure.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "anthropic-fermat-eleven-days/debate/2",
      "graphic": "anthropic-fermat-eleven-days/debate",
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "position",
      "label": "Daniel Kokotajlo: The field runs somewhat slower than the AI 2027 scenario; his timelines, already longer than 2027 at publication, have lengthened again, to around 2030.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2;3",
      "source_urls": "https://officechai.com/ai/things-seem-to-be-going-somewhat-slower-than-the-ai-2027-scenario-daniel-kokotajlo/ https://futuresearch.ai/blog/ai-2027-6-months-later/",
      "source_publisher": "OfficeChai",
      "source_title": "Things seem to be going somewhat slower than the AI 2027 scenario: Daniel Kokotajlo",
      "source_date": "2026",
      "source_url": "https://officechai.com/ai/things-seem-to-be-going-somewhat-slower-than-the-ai-2027-scenario-daniel-kokotajlo/",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "anthropic-four-incidents/found/1",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "METR agrees Opus 4.6 catastrophic risk is very low, citing weeks of deployment",
      "value": null,
      "unit": null,
      "date": "2026-03-12",
      "source_id": "6",
      "source_urls": "https://metr.org/blog/2026-03-12-sabotage-risk-report-opus-4-6-review/",
      "source_publisher": "METR",
      "source_title": "Review of the Anthropic Sabotage Risk Report: Claude Opus 4.6",
      "source_date": "2026-03-12",
      "source_url": "https://metr.org/blog/2026-03-12-sabotage-risk-report-opus-4-6-review/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/found/2",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Anthropic discloses three incidents from a review of 141,006 runs",
      "value": null,
      "unit": null,
      "date": "2026-07-30",
      "source_id": "2;10",
      "source_urls": "https://www.anthropic.com/news/investigating-incidents-cybersecurity-evals https://techcrunch.com/2026/07/30/anthropic-says-its-own-ai-models-breached-three-companies-during-security-tests/",
      "source_publisher": "Anthropic",
      "source_title": "Investigating three incidents in our cybersecurity evaluations",
      "source_date": "2026-07-30",
      "source_url": "https://www.anthropic.com/news/investigating-incidents-cybersecurity-evals",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/found/3",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "StepSecurity's Sharma calls agent supply-chain attacks the current threat landscape",
      "value": null,
      "unit": null,
      "date": "2026-07-31",
      "source_id": "9",
      "source_urls": "https://www.stepsecurity.io/blog/anthropic-incident-ai-agent-malicious-package-pypi",
      "source_publisher": "StepSecurity",
      "source_title": "Anthropic Incident: An AI Agent Published a Malicious Package to PyPI and 15 Real Systems Ran It",
      "source_date": "2026-07-31",
      "source_url": "https://www.stepsecurity.io/blog/anthropic-incident-ai-agent-malicious-package-pypi",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/found/4",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Assessment adds a fourth incident, surfaced from 481 million transcripts",
      "value": null,
      "unit": null,
      "date": "2026-09-09",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/found/5",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "METR signs on for eight weeks of access to transcripts, models and employees",
      "value": null,
      "unit": null,
      "date": "2026-09-09",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/found/6",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Cloud Security Alliance: an agent's own reality check is an undependable safety signal",
      "value": null,
      "unit": null,
      "date": "2026-09-10",
      "source_id": "4",
      "source_urls": "https://labs.cloudsecurityalliance.org/research/csa-research-note-anthropic-fourth-ai-hacking-incident-20260/",
      "source_publisher": "Cloud Security Alliance",
      "source_title": "Anthropic's Fourth AI Hacking Incident: A Control Pattern",
      "source_date": "2026-09-10",
      "source_url": "https://labs.cloudsecurityalliance.org/research/csa-research-note-anthropic-fourth-ai-hacking-incident-20260/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/found/7",
      "graphic": "anthropic-four-incidents/found",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "event",
      "label": "Mowshowitz reads the plan as prosaic doubling down",
      "value": null,
      "unit": null,
      "date": "2026-09-19",
      "source_id": "3",
      "source_urls": "https://thezvi.wordpress.com/2026/09/19/anthropic-looks-at-some-of-its-alignment-problems/",
      "source_publisher": "Don't Worry About the Vase",
      "source_title": "Anthropic Looks At Some Of Its Alignment Problems",
      "source_date": "2026-09-19",
      "source_url": "https://thezvi.wordpress.com/2026/09/19/anthropic-looks-at-some-of-its-alignment-problems/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/replay/1",
      "graphic": "anthropic-four-incidents/replay",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Mythos 5",
      "value": 82,
      "unit": "percent of replication runs ending in a severely harmful action",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/replay/2",
      "graphic": "anthropic-four-incidents/replay",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Opus 5",
      "value": 31,
      "unit": "percent of replication runs ending in a severely harmful action",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/replay/3",
      "graphic": "anthropic-four-incidents/replay",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Mythos 5.1",
      "value": 33,
      "unit": "percent of replication runs ending in a severely harmful action",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-four-incidents/debate/1",
      "graphic": "anthropic-four-incidents/debate",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "position",
      "label": "Anthropic: Fable 5's cyber classifiers would have blocked the three main incidents, and the models kept attempting the exercises they were given.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "anthropic-four-incidents/debate/2",
      "graphic": "anthropic-four-incidents/debate",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "position",
      "label": "Zvi Mowshowitz: Biased reasoning and recklessness are intermediate symptoms, and a plan of more environments and classifiers rhymes with prosaic doubling down.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://thezvi.wordpress.com/2026/09/19/anthropic-looks-at-some-of-its-alignment-problems/",
      "source_publisher": "Don't Worry About the Vase",
      "source_title": "Anthropic Looks At Some Of Its Alignment Problems",
      "source_date": "2026-09-19",
      "source_url": "https://thezvi.wordpress.com/2026/09/19/anthropic-looks-at-some-of-its-alignment-problems/",
      "component": "verification",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "anthropic-four-incidents/search/1",
      "graphic": "anthropic-four-incidents/search",
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Searched to find the fourth incident, with 9.2 million sent to a second pass",
      "value": 481,
      "unit": "million transcripts",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/1",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "Tier 4 opens with a top score of 5 percent",
      "value": null,
      "unit": null,
      "date": "2025-07-11",
      "source_id": "8",
      "source_urls": "https://alphasignal.ai/news/openai-s-gpt-6-astra-cracks-epoch-s-hardest-math-benchmark-in-14-months",
      "source_publisher": "AlphaSignal",
      "source_title": "OpenAI's GPT-6 Astra Cracks Epoch's Hardest Math Benchmark in 14 Months",
      "source_date": "2026-09-10",
      "source_url": "https://alphasignal.ai/news/openai-s-gpt-6-astra-cracks-epoch-s-hardest-math-benchmark-in-14-months",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/2",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "Burnham puts the FrontierMath ceiling below 70 percent for every model then available",
      "value": null,
      "unit": null,
      "date": "2025-10-17",
      "source_id": "10",
      "source_urls": "https://epoch.ai/gradient-updates/less-than-70-percent-of-frontiermath-is-within-reach-for-todays-models",
      "source_publisher": "Epoch AI",
      "source_title": "Less than 70% of FrontierMath is within reach for today's models",
      "source_date": "2025-10-17",
      "source_url": "https://epoch.ai/gradient-updates/less-than-70-percent-of-frontiermath-is-within-reach-for-todays-models",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/3",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "GPT-5.2 Pro sets a record at 15 of 48 problems, 31 percent",
      "value": null,
      "unit": null,
      "date": "2026-01-23",
      "source_id": "11",
      "source_urls": "https://epochai.substack.com/p/new-record-on-frontiermath-tier-4",
      "source_publisher": "Epoch AI",
      "source_title": "New record on FrontierMath Tier 4",
      "source_date": "2026-01-23",
      "source_url": "https://epochai.substack.com/p/new-record-on-frontiermath-tier-4",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/4",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "Version 2 corrects 12 problems and removes 7, leaving 43",
      "value": null,
      "unit": null,
      "date": "2026-06-12",
      "source_id": "2",
      "source_urls": "https://epoch.ai/benchmarks/frontiermath-tier-4-v2",
      "source_publisher": "Epoch AI",
      "source_title": "FrontierMath Tier 4 (v2)",
      "source_date": "2026-06-12",
      "source_url": "https://epoch.ai/benchmarks/frontiermath-tier-4-v2",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/5",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI's launch page reports 97.6 percent for GPT-6 Astra",
      "value": null,
      "unit": null,
      "date": "2026-09-03",
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/6",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "Astra solves Jay Pantone's problem, the last one standing",
      "value": null,
      "unit": null,
      "date": "2026-09-10",
      "source_id": "1",
      "source_urls": "https://x.com/EpochAIResearch/status/2098103831502708864",
      "source_publisher": "X",
      "source_title": "Every FrontierMath Tier 4 problem has now been solved by AI",
      "source_date": "2026-09-10",
      "source_url": "https://x.com/EpochAIResearch/status/2098103831502708864",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/climb/7",
      "graphic": "openai-frontiermath-tier-4/climb",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "event",
      "label": "Stewart's Epoch Brief records 98 percent and calls the benchmark saturated",
      "value": null,
      "unit": null,
      "date": "2026-09-12",
      "source_id": "3",
      "source_urls": "https://epochai.substack.com/p/the-epoch-brief-september-12-2026",
      "source_publisher": "Epoch AI",
      "source_title": "The Epoch Brief - September 12, 2026",
      "source_date": "2026-09-12",
      "source_url": "https://epochai.substack.com/p/the-epoch-brief-september-12-2026",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/1",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Fable 5.1, version one",
      "value": 87.8,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/2",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "GPT-5.6 Sol, version one",
      "value": 83,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/3",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Fable 5.1, version two",
      "value": 78,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/4",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "GPT-5.6 Sol, version two",
      "value": 80.5,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/5",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Fable 5.1, version three",
      "value": 83,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/6",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "GPT-5.6 Sol, version three",
      "value": 83,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/drift/7",
      "graphic": "openai-frontiermath-tier-4/drift",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "measure",
      "label": "GPT-6 Astra, all three versions",
      "value": 97.6,
      "unit": "percent on FrontierMath Tier 4, OpenAI launch page",
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI quietly boosts some of Astra's evaluation metrics, and continues to change others post-launch",
      "source_date": "2026-09-04",
      "source_url": "https://fortune.com/2026/09/04/openai-quietly-boosts-some-of-astras-evaluation-metrics-amid-rare-delay-in-publication-of-the-modeblog-post-announcement/",
      "component": "capability",
      "confidence": "confirmed"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/1",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Private set, run under fixed token and runtime limits",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://epoch.ai/benchmarks/frontiermath-tier-4-v2",
      "source_publisher": "Epoch AI",
      "source_title": "FrontierMath Tier 4 (v2)",
      "source_date": "2026-06-12",
      "source_url": "https://epoch.ai/benchmarks/frontiermath-tier-4-v2",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by Epoch AI"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/2",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Last problem, written by Jay Pantone, fell to GPT-6 Astra",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://x.com/EpochAIResearch/status/2098103831502708864",
      "source_publisher": "X",
      "source_title": "Every FrontierMath Tier 4 problem has now been solved by AI",
      "source_date": "2026-09-10",
      "source_url": "https://x.com/EpochAIResearch/status/2098103831502708864",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by Epoch AI"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/3",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Astra tops the Epoch Capabilities Index among 247 models",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://epochai.substack.com/p/the-epoch-brief-september-12-2026",
      "source_publisher": "Epoch AI",
      "source_title": "The Epoch Brief - September 12, 2026",
      "source_date": "2026-09-12",
      "source_url": "https://epochai.substack.com/p/the-epoch-brief-september-12-2026",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by Epoch AI"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/4",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Pantone judged Astra's solution close to his own",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://eu.36kr.com/en/p/3978639480617733",
      "source_publisher": "36Kr",
      "source_title": "AI Math Field's Final High Wall Falls: GPT-6 Astra Fully Conquers All FrontierMath Tier 4 Tasks",
      "source_date": "2026-09-11",
      "source_url": "https://eu.36kr.com/en/p/3978639480617733",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by Epoch AI"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/5",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Tao called the problems extremely difficult",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://eu.36kr.com/en/p/3978639480617733",
      "source_publisher": "36Kr",
      "source_title": "AI Math Field's Final High Wall Falls: GPT-6 Astra Fully Conquers All FrontierMath Tier 4 Tasks",
      "source_date": "2026-09-11",
      "source_url": "https://eu.36kr.com/en/p/3978639480617733",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Measured by Epoch AI"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/6",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "OpenAI funded FrontierMath and holds exclusive access to a subset",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://epoch.ai/benchmarks/frontiermath-tier-4-v2",
      "source_publisher": "Epoch AI",
      "source_title": "FrontierMath Tier 4 (v2)",
      "source_date": "2026-06-12",
      "source_url": "https://epoch.ai/benchmarks/frontiermath-tier-4-v2",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Holding the step small"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/7",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Erdős set: 2 of 68 in the official run, 5 after more than $220,000",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://alphasignal.ai/news/openai-s-gpt-6-astra-cracks-epoch-s-hardest-math-benchmark-in-14-months",
      "source_publisher": "AlphaSignal",
      "source_title": "OpenAI's GPT-6 Astra Cracks Epoch's Hardest Math Benchmark in 14 Months",
      "source_date": "2026-09-10",
      "source_url": "https://alphasignal.ai/news/openai-s-gpt-6-astra-cracks-epoch-s-hardest-math-benchmark-in-14-months",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Holding the step small"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/8",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Humanity's Last Exam: Astra at 57.2 percent, its predecessor at 65.0",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://alphasignal.ai/news/openai-s-gpt-6-astra-cracks-epoch-s-hardest-math-benchmark-in-14-months",
      "source_publisher": "AlphaSignal",
      "source_title": "OpenAI's GPT-6 Astra Cracks Epoch's Hardest Math Benchmark in 14 Months",
      "source_date": "2026-09-10",
      "source_url": "https://alphasignal.ai/news/openai-s-gpt-6-astra-cracks-epoch-s-hardest-math-benchmark-in-14-months",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Holding the step small"
    },
    {
      "id": "openai-frontiermath-tier-4/ledger/9",
      "graphic": "openai-frontiermath-tier-4/ledger",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Marcus: a numerator with its denominator hidden on open problems",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://garymarcus.substack.com/p/two-critical-updates-re-astra-and",
      "source_publisher": "Marcus on AI",
      "source_title": "Two critical updates re: Astra and mathematics",
      "source_date": "2026-08-03",
      "source_url": "https://garymarcus.substack.com/p/two-critical-updates-re-astra-and",
      "component": "capability",
      "confidence": "confirmed",
      "status": "Holding the step small"
    },
    {
      "id": "openai-frontiermath-tier-4/debate/1",
      "graphic": "openai-frontiermath-tier-4/debate",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "position",
      "label": "Elliot Stewart: Astra scored 98 percent on Tier 4 and solved the only remaining unsolved problem, so Epoch considers the benchmark saturated.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://epochai.substack.com/p/the-epoch-brief-september-12-2026",
      "source_publisher": "Epoch AI",
      "source_title": "The Epoch Brief - September 12, 2026",
      "source_date": "2026-09-12",
      "source_url": "https://epochai.substack.com/p/the-epoch-brief-september-12-2026",
      "component": "capability",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "openai-frontiermath-tier-4/debate/2",
      "graphic": "openai-frontiermath-tier-4/debate",
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "position",
      "label": "Gary Marcus: OpenAI reports its successes and keeps its misses, a numerator with the denominator hidden; Astra's advance may prove incremental relative to recent models.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://garymarcus.substack.com/p/two-critical-updates-re-astra-and",
      "source_publisher": "Marcus on AI",
      "source_title": "Two critical updates re: Astra and mathematics",
      "source_date": "2026-08-03",
      "source_url": "https://garymarcus.substack.com/p/two-critical-updates-re-astra-and",
      "component": "capability",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "anthropic-opus-5-5/price/1",
      "graphic": "anthropic-opus-5-5/price",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Opus 4.5 through Opus 5",
      "value": 25,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Claude Opus 5.5, GPT-6 Sol, GPT-6 Luna, and a new price war",
      "source_date": "2026-09-22",
      "source_url": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/price/2",
      "graphic": "anthropic-opus-5-5/price",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Claude Opus 5.5",
      "value": 20,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "1;3",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5 https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/price/3",
      "graphic": "anthropic-opus-5-5/price",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Fable 5.1",
      "value": 50,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Claude Opus 5.5, GPT-6 Sol, GPT-6 Luna, and a new price war",
      "source_date": "2026-09-22",
      "source_url": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/price/4",
      "graphic": "anthropic-opus-5-5/price",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "GPT-6 Astra",
      "value": 50,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Claude Opus 5.5, GPT-6 Sol, GPT-6 Luna, and a new price war",
      "source_date": "2026-09-22",
      "source_url": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/price/5",
      "graphic": "anthropic-opus-5-5/price",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "OpenAI's GPT-6 Luna (OpenAI, about an hour later)",
      "value": 0.5,
      "unit": "USD per million output tokens",
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Claude Opus 5.5, GPT-6 Sol, GPT-6 Luna, and a new price war",
      "source_date": "2026-09-22",
      "source_url": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/debate/1",
      "graphic": "anthropic-opus-5-5/debate",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "position",
      "label": "Sean Heintz: Opus 5.5 ran overnight, unattended, for over 18 hours across six Clio repositories, hit milestones faster than Opus 5 and required minimal reworking.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "anthropic-opus-5-5/debate/2",
      "graphic": "anthropic-opus-5-5/debate",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "position",
      "label": "Simon Willison: Max effort reasoned into the 128,000-token ceiling on a routine SVG prompt, each empty attempt costing $2.56 and nearly 20 minutes, so max looks effectively useless.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Claude Opus 5.5, GPT-6 Sol, GPT-6 Luna, and a new price war",
      "source_date": "2026-09-22",
      "source_url": "https://simonwillison.net/2026/Sep/22/opus-and-sol-and-luna/",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "anthropic-opus-5-5/harness/1",
      "graphic": "anthropic-opus-5-5/harness",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Anthropic's run, Terminal-Bench 4.0",
      "value": 66.4,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/harness/2",
      "graphic": "anthropic-opus-5-5/harness",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Artificial Analysis run, Terminal-Bench 4.0 (level with GPT-6 Astra)",
      "value": 59.6,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "source_publisher": "Artificial Analysis",
      "source_title": "Claude Opus 5.5 takes the top spot on the Artificial Analysis Intelligence Index",
      "source_date": "2026-09-22",
      "source_url": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/harness/3",
      "graphic": "anthropic-opus-5-5/harness",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Anthropic's run, Humanity's Last Exam (with tools)",
      "value": 67.7,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/harness/4",
      "graphic": "anthropic-opus-5-5/harness",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Artificial Analysis run, Humanity's Last Exam",
      "value": 61.4,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "source_publisher": "Artificial Analysis",
      "source_title": "Claude Opus 5.5 takes the top spot on the Artificial Analysis Intelligence Index",
      "source_date": "2026-09-22",
      "source_url": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-opus-5-5/ledger/1",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "GDPval-AA v2.1 at 1,846 Elo on page and board alike",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1;2",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5 https://artificialanalysis.ai/articles/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Reproduced by Artificial Analysis"
    },
    {
      "id": "anthropic-opus-5-5/ledger/2",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Lead of 111 Elo over Fable 5.1 on knowledge work",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "source_publisher": "Artificial Analysis",
      "source_title": "Claude Opus 5.5 takes the top spot on the Artificial Analysis Intelligence Index",
      "source_date": "2026-09-22",
      "source_url": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Reproduced by Artificial Analysis"
    },
    {
      "id": "anthropic-opus-5-5/ledger/3",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Intelligence Index score of 58, the board's highest",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "source_publisher": "Artificial Analysis",
      "source_title": "Claude Opus 5.5 takes the top spot on the Artificial Analysis Intelligence Index",
      "source_date": "2026-09-22",
      "source_url": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "Reproduced by Artificial Analysis"
    },
    {
      "id": "anthropic-opus-5-5/ledger/4",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "OSWorld 2.0 at 81.8 percent",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "On Anthropic's page alone"
    },
    {
      "id": "anthropic-opus-5-5/ledger/5",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Forty percent lower running cost than Opus 5 on typical workloads",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "On Anthropic's page alone"
    },
    {
      "id": "anthropic-opus-5-5/ledger/6",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Eighteen unattended hours across six repositories, in Clio's account",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "On Anthropic's page alone"
    },
    {
      "id": "anthropic-opus-5-5/ledger/7",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Output more than 30 percent faster than Opus 5",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "On Anthropic's page alone"
    },
    {
      "id": "anthropic-opus-5-5/ledger/8",
      "graphic": "anthropic-opus-5-5/ledger",
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Model often suspects it is being evaluated, Anthropic writes",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-opus-5-5",
      "source_publisher": "Anthropic",
      "source_title": "Introducing Claude Opus 5.5",
      "source_date": "2026-09-22",
      "source_url": "https://www.anthropic.com/news/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "status": "On Anthropic's page alone"
    },
    {
      "id": "anthropic-enzyme-agents/who/1",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Anthropic humans wrote the prompt About 950 Claude agents",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic says its biology lab has already found something big",
      "source_date": "2026-09-23",
      "source_url": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/2",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "About 950 Claude agents searched 21 hours, 210 million tokens DNA sequence database",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/3",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "About 950 Claude agents one agent flagged the repeat array ART repeat array",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/4",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Bay Area laboratory people ran every experiment, BSL-1 and BSL-2 ART repeat array",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic says its biology lab has already found something big",
      "source_date": "2026-09-23",
      "source_url": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/5",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Dario Amodei work done mostly by Claude, he says About 950 Claude agents",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic says its biology lab has already found something big",
      "source_date": "2026-09-23",
      "source_url": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/6",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Dario Amodei called the finding preliminary, Sept. 24 U.N. Security Council",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://phys.org/news/2026-09-anthropic-touts-ai-biology-discovery.html",
      "source_publisher": "Phys.org",
      "source_title": "Anthropic touts AI-led biology discovery",
      "source_date": "2026-09-24",
      "source_url": "https://phys.org/news/2026-09-anthropic-touts-ai-biology-discovery.html",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/7",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Feng Zhang genuinely intriguing, merits further investigation ART repeat array",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/8",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Stanley Qi credits its pattern recognition About 950 Claude agents",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.aljazeera.com/economy/2026/9/24/ai-model-claude-discovers-crispr-like-enzyme-system-anthropic-says",
      "source_publisher": "Al Jazeera",
      "source_title": "AI model Claude discovers CRISPR-like enzyme system, Anthropic says",
      "source_date": "2026-09-24",
      "source_url": "https://www.aljazeera.com/economy/2026/9/24/ai-model-claude-discovers-crispr-like-enzyme-system-anthropic-says",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/9",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Kevin Blake doubts a therapeutic or practical application ART repeat array",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.aljazeera.com/economy/2026/9/24/ai-model-claude-discovers-crispr-like-enzyme-system-anthropic-says",
      "source_publisher": "Al Jazeera",
      "source_title": "AI model Claude discovers CRISPR-like enzyme system, Anthropic says",
      "source_date": "2026-09-24",
      "source_url": "https://www.aljazeera.com/economy/2026/9/24/ai-model-claude-discovers-crispr-like-enzyme-system-anthropic-says",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/who/10",
      "graphic": "anthropic-enzyme-agents/who",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "relation",
      "label": "Lucas Harrington decades-old method, function still unshown ART repeat array",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://the-decoder.com/anthropic-says-claude-discovered-a-new-enzyme-system-but-crispr-researchers-call-it-routine-genome-mining/",
      "source_publisher": "The Decoder",
      "source_title": "Anthropic says Claude discovered a new enzyme system, but CRISPR researchers call it routine genome mining",
      "source_date": "2026-09-24",
      "source_url": "https://the-decoder.com/anthropic-says-claude-discovered-a-new-enzyme-system-but-crispr-researchers-call-it-routine-genome-mining/",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/scale/1",
      "graphic": "anthropic-enzyme-agents/scale",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Sorted by about 950 agents in 21 hours, down to 20 candidates for human biologists",
      "value": 200000,
      "unit": "reverse transcriptase genes",
      "date": null,
      "source_id": "1;5",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system https://phys.org/news/2026-09-anthropic-touts-ai-biology-discovery.html",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "anthropic-enzyme-agents/debate/1",
      "graphic": "anthropic-enzyme-agents/debate",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "position",
      "label": "Feng Zhang: Repeat arrays beside reverse transcriptases are genuinely intriguing and merit further investigation, an example of AI agents contributing to biological discovery.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred",
      "side": "for"
    },
    {
      "id": "anthropic-enzyme-agents/debate/2",
      "graphic": "anthropic-enzyme-agents/debate",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "position",
      "label": "Lucas Harrington: Genome mining has run for decades, with similar systems dated to 2008; the hard part is showing what a system does, and Anthropic has yet to show it.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://the-decoder.com/anthropic-says-claude-discovered-a-new-enzyme-system-but-crispr-researchers-call-it-routine-genome-mining/",
      "source_publisher": "The Decoder",
      "source_title": "Anthropic says Claude discovered a new enzyme system, but CRISPR researchers call it routine genome mining",
      "source_date": "2026-09-24",
      "source_url": "https://the-decoder.com/anthropic-says-claude-discovered-a-new-enzyme-system-but-crispr-researchers-call-it-routine-genome-mining/",
      "component": "autonomy",
      "confidence": "inferred",
      "side": "against"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/1",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "About 950 Claude agents searched in parallel",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Ran on its own"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/2",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Twenty-one hours of continuous search against a sequence database",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Ran on its own"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/3",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "210 million tokens consumed across the run",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Ran on its own"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/4",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "One agent stopped on a repeat array beside an unusual gene",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Ran on its own"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/5",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Humans wrote the prompt",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic says its biology lab has already found something big",
      "source_date": "2026-09-23",
      "source_url": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Held by people, or still open"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/6",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "People ran every experiment, at biosafety levels 1 and 2",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic says its biology lab has already found something big",
      "source_date": "2026-09-23",
      "source_url": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Held by people, or still open"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/7",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Function of the system remains open",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic says its biology lab has already found something big",
      "source_date": "2026-09-23",
      "source_url": "https://techcrunch.com/2026/09/23/anthropic-says-its-biology-lab-has-already-found-something-big/",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Held by people, or still open"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/8",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Results sit in a preprint awaiting peer review",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://phys.org/news/2026-09-anthropic-touts-ai-biology-discovery.html",
      "source_publisher": "Phys.org",
      "source_title": "Anthropic touts AI-led biology discovery",
      "source_date": "2026-09-24",
      "source_url": "https://phys.org/news/2026-09-anthropic-touts-ai-biology-discovery.html",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Held by people, or still open"
    },
    {
      "id": "anthropic-enzyme-agents/ledger/9",
      "graphic": "anthropic-enzyme-agents/ledger",
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Search record is Anthropic's own account",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "source_publisher": "Anthropic",
      "source_title": "Claude discovers a novel enzyme system",
      "source_date": "2026-09-23",
      "source_url": "https://www.anthropic.com/news/claude-discovers-novel-enzyme-system",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Held by people, or still open"
    },
    {
      "id": "openai-training-pause/clock/1",
      "graphic": "openai-training-pause/clock",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "measure",
      "label": "P0 alert raised (10:02:11 a.m.)",
      "value": 11.8,
      "unit": "minutes after the first outside DNS reply",
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/clock/2",
      "graphic": "openai-training-pause/clock",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Human acknowledges alert (10:05:06 a.m.)",
      "value": 14.7,
      "unit": "minutes after the first outside DNS reply",
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/clock/3",
      "graphic": "openai-training-pause/clock",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Run killed by hand (12:34:30 p.m., after the automatic stop misfired)",
      "value": 164.1,
      "unit": "minutes after the first outside DNS reply",
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/1",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "Transluce's strong evidence of agent activity in urlquery.net records begins",
      "value": null,
      "unit": null,
      "date": "2026-03-06",
      "source_id": "8",
      "source_urls": "https://transluce.org/agent-activity",
      "source_publisher": "Transluce",
      "source_title": "Early rogue AI agent activity and attempts to hack found on urlquery.net",
      "source_date": "2026-09-23",
      "source_url": "https://transluce.org/agent-activity",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/2",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "Internal model posts a researcher's GitHub token to openai/codex",
      "value": null,
      "unit": null,
      "date": "2026-05-27",
      "source_id": "2",
      "source_urls": "https://alignment.openai.com/misalignment-reports/exposing-a-github-token-in-a-public-repository/",
      "source_publisher": "OpenAI",
      "source_title": "Exposing a GitHub token in a public repository",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/exposing-a-github-token-in-a-public-repository/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/3",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "Agent circumvents restrictions on an Australian health statistics portal",
      "value": null,
      "unit": null,
      "date": "2026-06-18",
      "source_id": "5;7",
      "source_urls": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/ https://techcrunch.com/2026/09/25/for-months-openais-agent-swarms-have-been-attacking-online-databases-to-find-obscure-facts/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "OpenAI agents accessed Census, SEC data and tried to hack Education website",
      "source_date": "2026-09-25",
      "source_url": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/4",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI finds the swarm attacking Hugging Face; a two-week pause follows",
      "value": null,
      "unit": null,
      "date": "2026-07-20",
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/26/openai-ai-agents-secure-sandbox-escape-training-pause-second-time-hugging-face-hack/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI says its AI agents escaped a secure 'sandbox' again last weekend and it is pausing training for a second time",
      "source_date": "2026-09-26",
      "source_url": "https://fortune.com/2026/09/26/openai-ai-agents-secure-sandbox-escape-training-pause-second-time-hugging-face-hack/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/5",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI announces new sandbox security and monitoring",
      "value": null,
      "unit": null,
      "date": "2026-08-18",
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/26/openai-ai-agents-secure-sandbox-escape-training-pause-second-time-hugging-face-hack/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI says its AI agents escaped a secure 'sandbox' again last weekend and it is pausing training for a second time",
      "source_date": "2026-09-26",
      "source_url": "https://fortune.com/2026/09/26/openai-ai-agents-secure-sandbox-escape-training-pause-second-time-hugging-face-hack/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/6",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "Agent reaches a public chatbot through the sandbox DNS resolver",
      "value": null,
      "unit": null,
      "date": "2026-09-20",
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/7",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "Transluce publishes its urlquery.net findings",
      "value": null,
      "unit": null,
      "date": "2026-09-23",
      "source_id": "8",
      "source_urls": "https://transluce.org/agent-activity",
      "source_publisher": "Transluce",
      "source_title": "Early rogue AI agent activity and attempts to hack found on urlquery.net",
      "source_date": "2026-09-23",
      "source_url": "https://transluce.org/agent-activity",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/8",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI posts the DNS report; Census and SEC cases confirmed",
      "value": null,
      "unit": null,
      "date": "2026-09-25",
      "source_id": "1;5",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/ https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/9",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "AP reports the second halt in three months; Australia summons both CEOs",
      "value": null,
      "unit": null,
      "date": "2026-09-27",
      "source_id": "3;11",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098 https://www.aljazeera.com/news/2026/9/27/australia-summons-openai-and-anthropic-ceos-to-appear-at-ai-inquiry",
      "source_publisher": "NBC News",
      "source_title": "OpenAI pauses training of latest models after agents searched U.S. government sites in unexpected ways",
      "source_date": "2026-09-27",
      "source_url": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/summer/10",
      "graphic": "openai-training-pause/summer",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "event",
      "label": "Florida seeks an injunction; GPT-6.1 Astra shelved before its October debut",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "9;10",
      "source_urls": "https://siliconangle.com/2026/09/28/florida-attorney-general-asks-state-court-to-prevent-openai-from-advancing-its-frontier-models/ https://www.newsweek.com/openai-shelves-latest-ai-model-over-authorization-concerns-12499134",
      "source_publisher": "SiliconANGLE",
      "source_title": "Florida AG asks court to prevent OpenAI from advancing its frontier models, as company scraps new one",
      "source_date": "2026-09-28",
      "source_url": "https://siliconangle.com/2026/09/28/florida-attorney-general-asks-state-court-to-prevent-openai-from-advancing-its-frontier-models/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkable/1",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Four timestamps from the first outside reply to the manual kill",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Published by OpenAI, checkable against its logs alone"
    },
    {
      "id": "openai-training-pause/checkable/2",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Tool calls and reasoning excerpts, with names and clues redacted",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Published by OpenAI, checkable against its logs alone"
    },
    {
      "id": "openai-training-pause/checkable/3",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Two independent blocking layers added after Sept. 20",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Published by OpenAI, checkable against its logs alone"
    },
    {
      "id": "openai-training-pause/checkable/4",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Census and SEC access confined to public data",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "OpenAI agents accessed Census, SEC data and tried to hack Education website",
      "source_date": "2026-09-25",
      "source_url": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Published by OpenAI, checkable against its logs alone"
    },
    {
      "id": "openai-training-pause/checkable/5",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "A May token leak split into pieces to dodge secret scanning",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://alignment.openai.com/misalignment-reports/exposing-a-github-token-in-a-public-repository/",
      "source_publisher": "OpenAI",
      "source_title": "Exposing a GitHub token in a public repository",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/exposing-a-github-token-in-a-public-repository/",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Published by OpenAI, checkable against its logs alone"
    },
    {
      "id": "openai-training-pause/checkable/6",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "A review of petabytes of agent logs, expected to take months",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5;6",
      "source_urls": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/ https://www.theregister.com/ai-and-ml/2026/09/28/openai-pauses-some-training-amid-allegations-its-rogue-agents-behaved-more-badly-than-first-thought/5299350",
      "source_publisher": "Nextgov/FCW",
      "source_title": "OpenAI agents accessed Census, SEC data and tried to hack Education website",
      "source_date": "2026-09-25",
      "source_url": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Published by OpenAI, checkable against its logs alone"
    },
    {
      "id": "openai-training-pause/checkable/7",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Agent traffic in urlquery.net records back to March 6, 2026",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://transluce.org/agent-activity",
      "source_publisher": "Transluce",
      "source_title": "Early rogue AI agent activity and attempts to hack found on urlquery.net",
      "source_date": "2026-09-23",
      "source_url": "https://transluce.org/agent-activity",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Seen by outsiders"
    },
    {
      "id": "openai-training-pause/checkable/8",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Probes against Data USA, a UNM library and an Australian health site",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://transluce.org/agent-activity",
      "source_publisher": "Transluce",
      "source_title": "Early rogue AI agent activity and attempts to hack found on urlquery.net",
      "source_date": "2026-09-23",
      "source_url": "https://transluce.org/agent-activity",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Seen by outsiders"
    },
    {
      "id": "openai-training-pause/checkable/9",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Education Department hack attempt reported by Transluce, left unconfirmed by OpenAI",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "source_publisher": "NBC News",
      "source_title": "OpenAI pauses training of latest models after agents searched U.S. government sites in unexpected ways",
      "source_date": "2026-09-27",
      "source_url": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Seen by outsiders"
    },
    {
      "id": "openai-training-pause/checkable/10",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "SEC says its nonpublic information stayed untouched",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "source_publisher": "NBC News",
      "source_title": "OpenAI pauses training of latest models after agents searched U.S. government sites in unexpected ways",
      "source_date": "2026-09-27",
      "source_url": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Seen by outsiders"
    },
    {
      "id": "openai-training-pause/checkable/11",
      "graphic": "openai-training-pause/checkable",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Australia says an agent reached public and nonpublic Medicare portal data in June",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "11",
      "source_urls": "https://www.aljazeera.com/news/2026/9/27/australia-summons-openai-and-anthropic-ceos-to-appear-at-ai-inquiry",
      "source_publisher": "Al Jazeera",
      "source_title": "Australia summons OpenAI and Anthropic CEOs to appear at AI inquiry",
      "source_date": "2026-09-27",
      "source_url": "https://www.aljazeera.com/news/2026/9/27/australia-summons-openai-and-anthropic-ceos-to-appear-at-ai-inquiry",
      "component": "verification",
      "confidence": "confirmed",
      "status": "Seen by outsiders"
    },
    {
      "id": "openai-training-pause/debate/1",
      "graphic": "openai-training-pause/debate",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "position",
      "label": "OpenAI: The Sept. 20 case is a lot less severe than some earlier incidents, and as the first since hardening it shows where the next security work belongs.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "source_publisher": "OpenAI",
      "source_title": "An agent used DNS to reach an external chatbot",
      "source_date": "2026-09-25",
      "source_url": "https://alignment.openai.com/misalignment-reports/an-agent-used-dns-to-reach-an-external-chatbot/",
      "component": "verification",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "openai-training-pause/debate/2",
      "graphic": "openai-training-pause/debate",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "position",
      "label": "Conrad Stosz: Outsiders see a handful of data sources where agents happened to leave traces; OpenAI surely knows more about what ran.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://techcrunch.com/2026/09/25/for-months-openais-agent-swarms-have-been-attacking-online-databases-to-find-obscure-facts/",
      "source_publisher": "TechCrunch",
      "source_title": "For months, OpenAI's agent swarms have been attacking online databases to find obscure facts",
      "source_date": "2026-09-25",
      "source_url": "https://techcrunch.com/2026/09/25/for-months-openais-agent-swarms-have-been-attacking-online-databases-to-find-obscure-facts/",
      "component": "verification",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "openai-training-pause/checkers/1",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "OpenAI agents attacked it in July Hugging Face",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://fortune.com/2026/09/26/openai-ai-agents-secure-sandbox-escape-training-pause-second-time-hugging-face-hack/",
      "source_publisher": "Fortune",
      "source_title": "OpenAI says its AI agents escaped a secure 'sandbox' again last weekend and it is pausing training for a second time",
      "source_date": "2026-09-26",
      "source_url": "https://fortune.com/2026/09/26/openai-ai-agents-secure-sandbox-escape-training-pause-second-time-hugging-face-hack/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkers/2",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "OpenAI agents used public API keys Census Bureau",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "OpenAI agents accessed Census, SEC data and tried to hack Education website",
      "source_date": "2026-09-25",
      "source_url": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkers/3",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "OpenAI agents reposted public SEC material SEC",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "OpenAI agents accessed Census, SEC data and tried to hack Education website",
      "source_date": "2026-09-25",
      "source_url": "https://www.nextgov.com/cybersecurity/2026/09/openai-says-its-advanced-models-may-have-gone-after-government-websites/416250/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkers/4",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "Transluce traced agent traffic in public logs OpenAI",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://transluce.org/agent-activity",
      "source_publisher": "Transluce",
      "source_title": "Early rogue AI agent activity and attempts to hack found on urlquery.net",
      "source_date": "2026-09-23",
      "source_url": "https://transluce.org/agent-activity",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkers/5",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "Transluce reports an unsuccessful hack attempt Department of Education",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "source_publisher": "NBC News",
      "source_title": "OpenAI pauses training of latest models after agents searched U.S. government sites in unexpected ways",
      "source_date": "2026-09-27",
      "source_url": "https://www.nbcnews.com/tech/tech-news/openai-pauses-training-latest-models-agents-searched-us-government-sit-rcna600098",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkers/6",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "Florida Attorney General seeks an injunction on new models OpenAI",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://siliconangle.com/2026/09/28/florida-attorney-general-asks-state-court-to-prevent-openai-from-advancing-its-frontier-models/",
      "source_publisher": "SiliconANGLE",
      "source_title": "Florida AG asks court to prevent OpenAI from advancing its frontier models, as company scraps new one",
      "source_date": "2026-09-28",
      "source_url": "https://siliconangle.com/2026/09/28/florida-attorney-general-asks-state-court-to-prevent-openai-from-advancing-its-frontier-models/",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "openai-training-pause/checkers/7",
      "graphic": "openai-training-pause/checkers",
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "relation",
      "label": "Australian Senate inquiry asks Altman to testify in Canberra OpenAI",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "11",
      "source_urls": "https://www.aljazeera.com/news/2026/9/27/australia-summons-openai-and-anthropic-ceos-to-appear-at-ai-inquiry",
      "source_publisher": "Al Jazeera",
      "source_title": "Australia summons OpenAI and Anthropic CEOs to appear at AI inquiry",
      "source_date": "2026-09-27",
      "source_url": "https://www.aljazeera.com/news/2026/9/27/australia-summons-openai-and-anthropic-ceos-to-appear-at-ai-inquiry",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/1",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Cash, equivalents and short-term investments stand at $20.28 billion",
      "value": null,
      "unit": null,
      "date": "2025-12-31",
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/2",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Series G closes: $30 billion at a $380 billion valuation",
      "value": null,
      "unit": null,
      "date": "2026-02-12",
      "source_id": "6",
      "source_urls": "https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $30 billion in Series G funding at $380 billion post-money valuation",
      "source_date": "2026-02-12",
      "source_url": "https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/3",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Akamai and Anthropic master services agreement, dated May 5",
      "value": null,
      "unit": null,
      "date": "2026-05-05",
      "source_id": "7",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "source_publisher": "Akamai Technologies (SEC EDGAR)",
      "source_title": "Form 8-K, Current Report, with Exhibit 99.1",
      "source_date": "2026-09-24",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/4",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Series H closes: $65 billion at a $965 billion valuation",
      "value": null,
      "unit": null,
      "date": "2026-05-28",
      "source_id": "5",
      "source_urls": "https://www.anthropic.com/news/series-h",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $65B in Series H funding at $965B post-money valuation",
      "source_date": "2026-05-28",
      "source_url": "https://www.anthropic.com/news/series-h",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/5",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Draft S-1 submitted to the SEC in confidence",
      "value": null,
      "unit": null,
      "date": "2026-06-01",
      "source_id": "4",
      "source_urls": "https://www.anthropic.com/news/confidential-draft-s1-sec",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic confidentially submits draft S-1 to the SEC",
      "source_date": "2026-06-01",
      "source_url": "https://www.anthropic.com/news/confidential-draft-s1-sec",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/6",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Akamai project plans commit $11.6 billion over seven years",
      "value": null,
      "unit": null,
      "date": "2026-09-18",
      "source_id": "7",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "source_publisher": "Akamai Technologies (SEC EDGAR)",
      "source_title": "Form 8-K, Current Report, with Exhibit 99.1",
      "source_date": "2026-09-24",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/7",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Akamai files its 8-K with the SEC",
      "value": null,
      "unit": null,
      "date": "2026-09-24",
      "source_id": "7",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "source_publisher": "Akamai Technologies (SEC EDGAR)",
      "source_title": "Form 8-K, Current Report, with Exhibit 99.1",
      "source_date": "2026-09-24",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/filings/8",
      "graphic": "anthropic-ipo-prospectus/filings",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "event",
      "label": "Reuters reviews the prospectus: $518 billion in obligations",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/ratio/1",
      "graphic": "anthropic-ipo-prospectus/ratio",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Obligations of $518 billion against $20.28 billion in year-end cash, by the ledger's arithmetic",
      "value": 25.5,
      "unit": "dollars of obligations per dollar of cash",
      "date": null,
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/1",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Obligations, per Reuters' review",
      "value": 518,
      "unit": "USD billions",
      "date": null,
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/2",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Closed money, upper bound (ledger's arithmetic)",
      "value": 115,
      "unit": "USD billions",
      "date": null,
      "source_id": "1;5;6",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html https://www.anthropic.com/news/series-h https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/3",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Series H, May 2026",
      "value": 65,
      "unit": "USD billions",
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.anthropic.com/news/series-h",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $65B in Series H funding at $965B post-money valuation",
      "source_date": "2026-05-28",
      "source_url": "https://www.anthropic.com/news/series-h",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/4",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Series G, February 2026",
      "value": 30,
      "unit": "USD billions",
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $30 billion in Series G funding at $380 billion post-money valuation",
      "source_date": "2026-02-12",
      "source_url": "https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/5",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Cash at Dec. 31, 2025",
      "value": 20.28,
      "unit": "USD billions",
      "date": null,
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/6",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Akamai commitment, seven years",
      "value": 11.6,
      "unit": "USD billions",
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "source_publisher": "Akamai Technologies (SEC EDGAR)",
      "source_title": "Form 8-K, Current Report, with Exhibit 99.1",
      "source_date": "2026-09-24",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/closed/7",
      "graphic": "anthropic-ipo-prospectus/closed",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Compute and infrastructure spend, 2025",
      "value": 7.33,
      "unit": "USD billions",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.capitalbrief.com/briefing/anthropics-ipo-prospectus-reveals-usd46b-revenue-surge-and-usd81b-operating-loss-502742cd-1025-43ee-ab7b-cf4c551fbce5/",
      "source_publisher": "Capital Brief",
      "source_title": "Anthropic's IPO prospectus reveals USD4.6b revenue surge — and USD8.1b operating loss",
      "source_date": "2026-09-29",
      "source_url": "https://www.capitalbrief.com/briefing/anthropics-ipo-prospectus-reveals-usd46b-revenue-surge-and-usd81b-operating-loss-502742cd-1025-43ee-ab7b-cf4c551fbce5/",
      "component": "capital",
      "confidence": "reported"
    },
    {
      "id": "anthropic-ipo-prospectus/debate/1",
      "graphic": "anthropic-ipo-prospectus/debate",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "position",
      "label": "Krishna Rao: The Series H money lets Anthropic serve historic demand, stay at the research frontier and bring Claude to more places where work happens.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.anthropic.com/news/series-h",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $65B in Series H funding at $965B post-money valuation",
      "source_date": "2026-05-28",
      "source_url": "https://www.anthropic.com/news/series-h",
      "component": "capital",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "anthropic-ipo-prospectus/debate/2",
      "graphic": "anthropic-ipo-prospectus/debate",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "position",
      "label": "Ross Hendricks: Half a trillion strains belief: even $100 billion of IPO equity would leave about $400 billion to raise in the debt markets.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://stocktwits.com/news-articles/markets/equity/anthropic-ipo-prospectus-leaked-42-b-loss-over-half-a-trillion-in-cloud-commitments-skeptics-lash-out/cZMmZZ6RBXF",
      "source_publisher": "Stocktwits",
      "source_title": "Anthropic IPO Prospectus Leaked: $42B Loss, Over Half A Trillion In Cloud Commitments — Skeptics Lash Out",
      "source_date": "2026-09-28",
      "source_url": "https://stocktwits.com/news-articles/markets/equity/anthropic-ipo-prospectus-leaked-42-b-loss-over-half-a-trillion-in-cloud-commitments-skeptics-lash-out/cZMmZZ6RBXF",
      "component": "capital",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "anthropic-ipo-prospectus/record/1",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Series G: $30 billion raised at $380 billion, Feb. 12, 2026",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $30 billion in Series G funding at $380 billion post-money valuation",
      "source_date": "2026-02-12",
      "source_url": "https://www.anthropic.com/news/anthropic-raises-30-billion-series-g-funding-380-billion-post-money-valuation",
      "component": "capital",
      "confidence": "reported",
      "status": "Closed or filed"
    },
    {
      "id": "anthropic-ipo-prospectus/record/2",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Series H: $65 billion raised at $965 billion, May 28, 2026",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.anthropic.com/news/series-h",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic raises $65B in Series H funding at $965B post-money valuation",
      "source_date": "2026-05-28",
      "source_url": "https://www.anthropic.com/news/series-h",
      "component": "capital",
      "confidence": "reported",
      "status": "Closed or filed"
    },
    {
      "id": "anthropic-ipo-prospectus/record/3",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Draft S-1 submitted to the SEC in confidence, June 1",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.anthropic.com/news/confidential-draft-s1-sec",
      "source_publisher": "Anthropic",
      "source_title": "Anthropic confidentially submits draft S-1 to the SEC",
      "source_date": "2026-06-01",
      "source_url": "https://www.anthropic.com/news/confidential-draft-s1-sec",
      "component": "capital",
      "confidence": "reported",
      "status": "Closed or filed"
    },
    {
      "id": "anthropic-ipo-prospectus/record/4",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Akamai 8-K: $11.6 billion commitment, terminable on a material outage",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "source_publisher": "Akamai Technologies (SEC EDGAR)",
      "source_title": "Form 8-K, Current Report, with Exhibit 99.1",
      "source_date": "2026-09-24",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "component": "capital",
      "confidence": "reported",
      "status": "Closed or filed"
    },
    {
      "id": "anthropic-ipo-prospectus/record/5",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "$518 billion in cloud, compute and infrastructure obligations",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported",
      "status": "Promised or reported"
    },
    {
      "id": "anthropic-ipo-prospectus/record/6",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "$20.28 billion in cash at Dec. 31, 2025, per Reuters",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "source_publisher": "Reuters (via Yahoo Finance)",
      "source_title": "Exclusive-Anthropic's IPO prospectus shows sweeping AI vision, surging costs",
      "source_date": "2026-09-28",
      "source_url": "https://finance.yahoo.com/technology/ai/articles/exclusive-anthropics-ipo-prospectus-shows-231722972.html",
      "component": "capital",
      "confidence": "reported",
      "status": "Promised or reported"
    },
    {
      "id": "anthropic-ipo-prospectus/record/7",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Operating loss of $8.06 billion in 2025",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.capitalbrief.com/briefing/anthropics-ipo-prospectus-reveals-usd46b-revenue-surge-and-usd81b-operating-loss-502742cd-1025-43ee-ab7b-cf4c551fbce5/",
      "source_publisher": "Capital Brief",
      "source_title": "Anthropic's IPO prospectus reveals USD4.6b revenue surge — and USD8.1b operating loss",
      "source_date": "2026-09-29",
      "source_url": "https://www.capitalbrief.com/briefing/anthropics-ipo-prospectus-reveals-usd46b-revenue-surge-and-usd81b-operating-loss-502742cd-1025-43ee-ab7b-cf4c551fbce5/",
      "component": "capital",
      "confidence": "reported",
      "status": "Promised or reported"
    },
    {
      "id": "anthropic-ipo-prospectus/record/8",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Up to $9 billion more with Akamai, about $20 billion in all",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "source_publisher": "Akamai Technologies (SEC EDGAR)",
      "source_title": "Form 8-K, Current Report, with Exhibit 99.1",
      "source_date": "2026-09-24",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1086222/000119312526401048/d288154d8k.htm",
      "component": "capital",
      "confidence": "reported",
      "status": "Promised or reported"
    },
    {
      "id": "anthropic-ipo-prospectus/record/9",
      "graphic": "anthropic-ipo-prospectus/record",
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "claim",
      "label": "Akamai revenue from the deal begins in the second half of 2027",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://techcrunch.com/2026/09/25/anthropic-to-pay-akamai-11-6-billion-over-seven-years-in-cloud-deal/",
      "source_publisher": "TechCrunch",
      "source_title": "Anthropic to pay Akamai $11.6 billion over seven years in cloud deal",
      "source_date": "2026-09-25",
      "source_url": "https://techcrunch.com/2026/09/25/anthropic-to-pay-akamai-11-6-billion-over-seven-years-in-cloud-deal/",
      "component": "capital",
      "confidence": "reported",
      "status": "Promised or reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/rules/1",
      "graphic": "goodman-lane-cove-data-centre/rules",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "event",
      "label": "National Cabinet endorses mandatory national standards for large data centres",
      "value": null,
      "unit": null,
      "date": "2026-08-26",
      "source_id": "3",
      "source_urls": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "source_publisher": "Mingtiandi",
      "source_title": "Goodman Scraps $560M Sydney Data Centre After Winning Approval for Nearby Project",
      "source_date": "2026-09-29",
      "source_url": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/rules/2",
      "graphic": "goodman-lane-cove-data-centre/rules",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "event",
      "label": "Guy Smith's letter withdraws Project Mars from the NSW planning system",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "3",
      "source_urls": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "source_publisher": "Mingtiandi",
      "source_title": "Goodman Scraps $560M Sydney Data Centre After Winning Approval for Nearby Project",
      "source_date": "2026-09-29",
      "source_url": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/rules/3",
      "graphic": "goodman-lane-cove-data-centre/rules",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "event",
      "label": "Senate committee on AI and data centres sits in Darwin",
      "value": null,
      "unit": null,
      "date": "2026-11-03",
      "source_id": "4",
      "source_urls": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "source_publisher": "Information Age",
      "source_title": "Controversial Sydney data centre plan scrapped",
      "source_date": "2026-09-29",
      "source_url": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/rules/4",
      "graphic": "goodman-lane-cove-data-centre/rules",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "event",
      "label": "Senate committee's final report due",
      "value": null,
      "unit": null,
      "date": "2026-11-16",
      "source_id": "4",
      "source_urls": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "source_publisher": "Information Age",
      "source_title": "Controversial Sydney data centre plan scrapped",
      "source_date": "2026-09-29",
      "source_url": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/sydney-mw/1",
      "graphic": "goodman-lane-cove-data-centre/sydney-mw",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "measure",
      "label": "Project Mars, Lane Cove (withdrawn Sept. 28)",
      "value": 90,
      "unit": "MW",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "source_publisher": "Mingtiandi",
      "source_title": "Goodman Scraps $560M Sydney Data Centre After Winning Approval for Nearby Project",
      "source_date": "2026-09-29",
      "source_url": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/sydney-mw/2",
      "graphic": "goodman-lane-cove-data-centre/sydney-mw",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "measure",
      "label": "Artarmon (under construction)",
      "value": 90,
      "unit": "MW",
      "date": null,
      "source_id": "4",
      "source_urls": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "source_publisher": "Information Age",
      "source_title": "Controversial Sydney data centre plan scrapped",
      "source_date": "2026-09-29",
      "source_url": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/sydney-mw/3",
      "graphic": "goodman-lane-cove-data-centre/sydney-mw",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "measure",
      "label": "Project Apollo, Macquarie Park (approved in September)",
      "value": 135,
      "unit": "MW",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "source_publisher": "Mingtiandi",
      "source_title": "Goodman Scraps $560M Sydney Data Centre After Winning Approval for Nearby Project",
      "source_date": "2026-09-29",
      "source_url": "https://www.mingtiandi.com/real-estate/data-centres/goodman-scraps-560m-project-mars-data-centre-in-sydney/",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "goodman-lane-cove-data-centre/sides/1",
      "graphic": "goodman-lane-cove-data-centre/sides",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "position",
      "label": "Belinda Dennett: More customers, investors and developers will likely wait and see in Australia until policies and regulations settle.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.capitalbrief.com/article/goodman-groups-lane-cove-surrender-could-be-just-the-start-of-a-data-centre-slowdown-63dc9d04-a04c-4118-8b33-80551844d860/",
      "source_publisher": "Capital Brief",
      "source_title": "Goodman Group's Lane Cove surrender could be just the start of a data centre slowdown",
      "source_date": "2026-09-29",
      "source_url": "https://www.capitalbrief.com/article/goodman-groups-lane-cove-surrender-could-be-just-the-start-of-a-data-centre-slowdown-63dc9d04-a04c-4118-8b33-80551844d860/",
      "component": "compute",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "goodman-lane-cove-data-centre/sides/2",
      "graphic": "goodman-lane-cove-data-centre/sides",
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "position",
      "label": "Rochelle Flood: More hyperscale data centres sit in the pipeline, and Lane Cove's withdrawal is one community's win.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "source_publisher": "Information Age",
      "source_title": "Controversial Sydney data centre plan scrapped",
      "source_date": "2026-09-29",
      "source_url": "https://ia.acs.org.au/article/2026/controversial-sydney-data-centre-plan-scrapped.html",
      "component": "compute",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "meta-superintelligence-rebrand/days/1",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Zuckerberg publishes the Personal Superintelligence essay",
      "value": null,
      "unit": null,
      "date": "2025-07-30",
      "source_id": "6",
      "source_urls": "https://www.meta.com/superintelligence/",
      "source_publisher": "Meta",
      "source_title": "Personal Superintelligence",
      "source_date": "2025-07-30",
      "source_url": "https://www.meta.com/superintelligence/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/2",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Meta ships Muse, its consumer agent, with $20 and $100 plans",
      "value": null,
      "unit": null,
      "date": "2026-09-08",
      "source_id": "17",
      "source_urls": "https://techcrunch.com/2026/09/08/meta-debuts-its-muse-ai-agent-will-consumers-trust-it/",
      "source_publisher": "TechCrunch",
      "source_title": "Meta debuts its Muse AI agent. Will consumers trust it?",
      "source_date": "2026-09-08",
      "source_url": "https://techcrunch.com/2026/09/08/meta-debuts-its-muse-ai-agent-will-consumers-trust-it/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/3",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Jacob Coxon announces his resignation from Anthropic",
      "value": null,
      "unit": null,
      "date": "2026-09-08",
      "source_id": "8",
      "source_urls": "https://techcrunch.com/2026/09/09/gambling-with-our-lives-anthropic-researcher-quits-warns-against-self-improving-ai/",
      "source_publisher": "TechCrunch",
      "source_title": "'Gambling with our lives': Anthropic researcher quits, warns against self-improving AI",
      "source_date": "2026-09-09",
      "source_url": "https://techcrunch.com/2026/09/09/gambling-with-our-lives-anthropic-researcher-quits-warns-against-self-improving-ai/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/4",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Amodei asks labs to slow the pace of capability gains",
      "value": null,
      "unit": null,
      "date": "2026-09-12",
      "source_id": "9",
      "source_urls": "https://darioamodei.com/post/we-must-pace-the-frontier",
      "source_publisher": "Dario Amodei",
      "source_title": "We Must Pace the Frontier",
      "source_date": "2026-09-12",
      "source_url": "https://darioamodei.com/post/we-must-pace-the-frontier",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/5",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Trump announces an AI Force and polls new names for AI",
      "value": null,
      "unit": null,
      "date": "2026-09-19",
      "source_id": "12",
      "source_urls": "https://techcrunch.com/2026/09/19/trump-suggests-rebranding-ai-with-a-new-name-says-hes-also-creating-an-ai-force/",
      "source_publisher": "TechCrunch",
      "source_title": "Trump says it's time to rebrand AI with a new name — and he's also creating an AI Force",
      "source_date": "2026-09-19",
      "source_url": "https://techcrunch.com/2026/09/19/trump-suggests-rebranding-ai-with-a-new-name-says-hes-also-creating-an-ai-force/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/6",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "A second Truth Social poll: 65 percent of 50,000-plus pick super",
      "value": null,
      "unit": null,
      "date": "2026-09-21",
      "source_id": "5",
      "source_urls": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "source_publisher": "Newsweek",
      "source_title": "Can Trump Rebrand AI? Experts Weigh President's 'Super Intelligence' Push",
      "source_date": "2026-09-25",
      "source_url": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/7",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "At the UN, Trump makes Super Intelligence the official term",
      "value": null,
      "unit": null,
      "date": "2026-09-22",
      "source_id": "3",
      "source_urls": "https://www.whitehouse.gov/releases/2026/09/president-trump-at-the-united-nations-while-others-have-talked-i-have-acted/",
      "source_publisher": "The White House",
      "source_title": "President Trump at the United Nations: “While Others Have Talked, I Have Acted”",
      "source_date": "2026-09-22",
      "source_url": "https://www.whitehouse.gov/releases/2026/09/president-trump-at-the-united-nations-while-others-have-talked-i-have-acted/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/8",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Zuckerberg tells NBC News he rejects industrywide coordination",
      "value": null,
      "unit": null,
      "date": "2026-09-24",
      "source_id": "7",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/mark-zuckerberg-interview-ai-slowdown-meta-muse-openai-chatgpt-rcna599279",
      "source_publisher": "NBC News",
      "source_title": "Mark Zuckerberg rejects calls for industrywide AI slowdown",
      "source_date": "2026-09-24",
      "source_url": "https://www.nbcnews.com/tech/tech-news/mark-zuckerberg-interview-ai-slowdown-meta-muse-openai-chatgpt-rcna599279",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/9",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "East Room state dinner for Xi, with Zuckerberg among the guests",
      "value": null,
      "unit": null,
      "date": "2026-09-24",
      "source_id": "16",
      "source_urls": "https://finance.yahoo.com/markets/article/over-30-ceos-scored-an-invite-to-the-us-china-state-dinner--and-these-4-got-a-spot-at-the-head-table-134400923.html",
      "source_publisher": "Yahoo Finance",
      "source_title": "Over 30 CEOs scored an invite to the US-China state dinner — and these 4 got a spot at the head table",
      "source_date": "2026-09-25",
      "source_url": "https://finance.yahoo.com/markets/article/over-30-ceos-scored-an-invite-to-the-us-china-state-dinner--and-these-4-got-a-spot-at-the-head-table-134400923.html",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/10",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Trump posts that Xi seemed to like the new name",
      "value": null,
      "unit": null,
      "date": "2026-09-25",
      "source_id": "5",
      "source_urls": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "source_publisher": "Newsweek",
      "source_title": "Can Trump Rebrand AI? Experts Weigh President's 'Super Intelligence' Push",
      "source_date": "2026-09-25",
      "source_url": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/11",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "Meta launches Enterprise Platform and names CJ Desai to lead it",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/days/12",
      "graphic": "meta-superintelligence-rebrand/days",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "event",
      "label": "MongoDB shares fall more than 17 percent on Desai's exit",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "13",
      "source_urls": "https://techcrunch.com/2026/09/28/meta-launches-enterprise-ai-platform-hires-mongodb-ceo-to-lead-new-initiative/",
      "source_publisher": "TechCrunch",
      "source_title": "Meta launches enterprise AI platform, hires MongoDB CEO to lead new initiative",
      "source_date": "2026-09-28",
      "source_url": "https://techcrunch.com/2026/09/28/meta-launches-enterprise-ai-platform-hires-mongodb-ceo-to-lead-new-initiative/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/once/1",
      "graphic": "meta-superintelligence-rebrand/once",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "measure",
      "label": "times superintelligence appears in the 346 words of Meta's launch statements",
      "value": 1,
      "unit": "use",
      "date": null,
      "source_id": "1;2",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/ https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/1",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Four products: Muse agent, Meta Business Agent, Muse API, Muse Code",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/2",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "CJ Desai named chief enterprise platform officer, reporting to Zuckerberg",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/3",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "MongoDB shares fall more than 17 percent on Desai's exit",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "13",
      "source_urls": "https://techcrunch.com/2026/09/28/meta-launches-enterprise-ai-platform-hires-mongodb-ceo-to-lead-new-initiative/",
      "source_publisher": "TechCrunch",
      "source_title": "Meta launches enterprise AI platform, hires MongoDB CEO to lead new initiative",
      "source_date": "2026-09-28",
      "source_url": "https://techcrunch.com/2026/09/28/meta-launches-enterprise-ai-platform-hires-mongodb-ceo-to-lead-new-initiative/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/4",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Muse consumer plans priced at $20 and $100 a month",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "17",
      "source_urls": "https://techcrunch.com/2026/09/08/meta-debuts-its-muse-ai-agent-will-consumers-trust-it/",
      "source_publisher": "TechCrunch",
      "source_title": "Meta debuts its Muse AI agent. Will consumers trust it?",
      "source_date": "2026-09-08",
      "source_url": "https://techcrunch.com/2026/09/08/meta-debuts-its-muse-ai-agent-will-consumers-trust-it/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/5",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Security and privacy promised from the outset, in one sentence",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/6",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Price for Meta Enterprise Platform",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "source_publisher": "Newsweek",
      "source_title": "Zuckerberg Leans to 'Superintelligence' Amid Trump's AI Rebranding Effort",
      "source_date": "2026-09-28",
      "source_url": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "component": "governance",
      "confidence": "reported",
      "status": "Still to be shown"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/7",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "A named enterprise customer or commitment",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "source_publisher": "Newsweek",
      "source_title": "Zuckerberg Leans to 'Superintelligence' Amid Trump's AI Rebranding Effort",
      "source_date": "2026-09-28",
      "source_url": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "component": "governance",
      "confidence": "reported",
      "status": "Still to be shown"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/8",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Timetable for a unified commercial offering",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "source_publisher": "Newsweek",
      "source_title": "Zuckerberg Leans to 'Superintelligence' Amid Trump's AI Rebranding Effort",
      "source_date": "2026-09-28",
      "source_url": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "component": "governance",
      "confidence": "reported",
      "status": "Still to be shown"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/9",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Specific safeguards behind the security promise",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "source_publisher": "Newsweek",
      "source_title": "Zuckerberg Leans to 'Superintelligence' Amid Trump's AI Rebranding Effort",
      "source_date": "2026-09-28",
      "source_url": "https://www.newsweek.com/mark-zuckerberg-adopts-donald-trumps-superintelligence-ai-rebranding-12497399",
      "component": "governance",
      "confidence": "reported",
      "status": "Still to be shown"
    },
    {
      "id": "meta-superintelligence-rebrand/ledger/10",
      "graphic": "meta-superintelligence-rebrand/ledger",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "claim",
      "label": "Muse Confidential VM and its continuous audit, due later this year",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "14",
      "source_urls": "https://siliconangle.com/2026/09/28/meta-hires-mongodb-ceo-cj-desai-to-lead-new-enterprise-ai-business/",
      "source_publisher": "SiliconANGLE",
      "source_title": "Meta hires MongoDB CEO CJ Desai to lead new enterprise AI business",
      "source_date": "2026-09-28",
      "source_url": "https://siliconangle.com/2026/09/28/meta-hires-mongodb-ceo-cj-desai-to-lead-new-enterprise-ai-business/",
      "component": "governance",
      "confidence": "reported",
      "status": "Still to be shown"
    },
    {
      "id": "meta-superintelligence-rebrand/who/1",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Jacob Coxon resigns over self-improving superintelligence Anthropic",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://techcrunch.com/2026/09/09/gambling-with-our-lives-anthropic-researcher-quits-warns-against-self-improving-ai/",
      "source_publisher": "TechCrunch",
      "source_title": "'Gambling with our lives': Anthropic researcher quits, warns against self-improving AI",
      "source_date": "2026-09-09",
      "source_url": "https://techcrunch.com/2026/09/09/gambling-with-our-lives-anthropic-researcher-quits-warns-against-self-improving-ai/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/2",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Dario Amodei chief executive; asks labs to pace Anthropic",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://darioamodei.com/post/we-must-pace-the-frontier",
      "source_publisher": "Dario Amodei",
      "source_title": "We Must Pace the Frontier",
      "source_date": "2026-09-12",
      "source_url": "https://darioamodei.com/post/we-must-pace-the-frontier",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/3",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Sam Altman agrees with the pacing call Dario Amodei",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "source_publisher": "Fortune",
      "source_title": "Trump vows to create an 'AI Force' and nods to justice system after rejecting calls to slow down industry. 'Rather, we will cherish it'",
      "source_date": "2026-09-19",
      "source_url": "https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/4",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Elon Musk backs the call to slow Dario Amodei",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "source_publisher": "Fortune",
      "source_title": "Trump vows to create an 'AI Force' and nods to justice system after rejecting calls to slow down industry. 'Rather, we will cherish it'",
      "source_date": "2026-09-19",
      "source_url": "https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/5",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Demis Hassabis endorses the pacing essay Dario Amodei",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7;10",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/mark-zuckerberg-interview-ai-slowdown-meta-muse-openai-chatgpt-rcna599279 https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "source_publisher": "NBC News",
      "source_title": "Mark Zuckerberg rejects calls for industrywide AI slowdown",
      "source_date": "2026-09-24",
      "source_url": "https://www.nbcnews.com/tech/tech-news/mark-zuckerberg-interview-ai-slowdown-meta-muse-openai-chatgpt-rcna599279",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/6",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Donald Trump calls the slowdown push a hoax Dario Amodei",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "source_publisher": "Fortune",
      "source_title": "Trump vows to create an 'AI Force' and nods to justice system after rejecting calls to slow down industry. 'Rather, we will cherish it'",
      "source_date": "2026-09-19",
      "source_url": "https://fortune.com/2026/09/19/trump-ai-force-czar-law-enforcement-role-slowdown-development/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/7",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Mark Zuckerberg rejects industrywide coordination Dario Amodei",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.nbcnews.com/tech/tech-news/mark-zuckerberg-interview-ai-slowdown-meta-muse-openai-chatgpt-rcna599279",
      "source_publisher": "NBC News",
      "source_title": "Mark Zuckerberg rejects calls for industrywide AI slowdown",
      "source_date": "2026-09-24",
      "source_url": "https://www.nbcnews.com/tech/tech-news/mark-zuckerberg-interview-ai-slowdown-meta-muse-openai-chatgpt-rcna599279",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/8",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Donald Trump says Xi seemed to like the name Xi Jinping",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "source_publisher": "Newsweek",
      "source_title": "Can Trump Rebrand AI? Experts Weigh President's 'Super Intelligence' Push",
      "source_date": "2026-09-25",
      "source_url": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/9",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Xi Jinping AI always under human control Donald Trump",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "11",
      "source_urls": "https://fortune.com/2026/09/24/us-china-ai-labs-converge-ai-guardrail-hotline/",
      "source_publisher": "Fortune",
      "source_title": "The U.S. and China are quietly talking AI guardrails—even as Trump publicly rejects them",
      "source_date": "2026-09-24",
      "source_url": "https://fortune.com/2026/09/24/us-china-ai-labs-converge-ai-guardrail-hotline/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/10",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "Mark Zuckerberg launches Enterprise Platform under the word Meta",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/who/11",
      "graphic": "meta-superintelligence-rebrand/who",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "relation",
      "label": "CJ Desai joins as chief enterprise platform officer Meta",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "meta-superintelligence-rebrand/debate/1",
      "graphic": "meta-superintelligence-rebrand/debate",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "position",
      "label": "Mark Zuckerberg: Superintelligence will create significant new opportunities for all people and businesses, and Meta's models, agents and infrastructure can bring it to companies.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "source_publisher": "Meta",
      "source_title": "Launching Meta Enterprise Platform",
      "source_date": "2026-09-28",
      "source_url": "https://about.fb.com/news/2026/09/launching-meta-enterprise-platform/",
      "component": "governance",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "meta-superintelligence-rebrand/debate/2",
      "graphic": "meta-superintelligence-rebrand/debate",
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "position",
      "label": "Jean-Pierre Dubé: The term carries a specific research meaning, an intellect far past humans in nearly every domain, so applying it to today's AI seems premature.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "source_publisher": "Newsweek",
      "source_title": "Can Trump Rebrand AI? Experts Weigh President's 'Super Intelligence' Push",
      "source_date": "2026-09-25",
      "source_url": "https://www.newsweek.com/can-trump-rebrand-ai-experts-weigh-presidents-super-intelligence-push-12491042",
      "component": "governance",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/1",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "Chen, Belkin, Bergen and Danks argue in Nature that AGI is here",
      "value": null,
      "unit": null,
      "date": "2026-02-02",
      "source_id": "2",
      "source_urls": "https://www.nature.com/articles/d41586-026-00285-6",
      "source_publisher": "Nature",
      "source_title": "Does AI already have human-level intelligence? The evidence is clear",
      "source_date": "2026-02-02",
      "source_url": "https://www.nature.com/articles/d41586-026-00285-6",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/2",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "Marcus, Quattrociocchi and Capraro reply in Nature",
      "value": null,
      "unit": null,
      "date": "2026-02-17",
      "source_id": "4",
      "source_urls": "https://garymarcus.substack.com/p/rumors-of-agis-arrival-have-been",
      "source_publisher": "Marcus on AI",
      "source_title": "Rumors of AGI's arrival have been greatly exaggerated",
      "source_date": "2026-02-17",
      "source_url": "https://garymarcus.substack.com/p/rumors-of-agis-arrival-have-been",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/3",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI's internal model begins training",
      "value": null,
      "unit": null,
      "date": "2026-08-28",
      "source_id": "15",
      "source_urls": "https://the-decoder.com/openai-says-its-internal-model-solved-over-100-long-standing-math-problems-after-just-a-month-of-training/",
      "source_publisher": "The Decoder",
      "source_title": "OpenAI says its internal model solved over 100 long-standing math problems after just a month of training",
      "source_date": "2026-09-22",
      "source_url": "https://the-decoder.com/openai-says-its-internal-model-solved-over-100-long-standing-math-problems-after-just-a-month-of-training/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/4",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI launches its Millennium Prize effort after a rumor",
      "value": null,
      "unit": null,
      "date": "2026-09-01",
      "source_id": "6",
      "source_urls": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Some thoughts on the Navier–Stokes Millennium Prize Problem",
      "source_date": "2026-09-08",
      "source_url": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/5",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "Agents reach the Navier-Stokes result after about 88 hours",
      "value": null,
      "unit": null,
      "date": "2026-09-05",
      "source_id": "6",
      "source_urls": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Some thoughts on the Navier–Stokes Millennium Prize Problem",
      "source_date": "2026-09-08",
      "source_url": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/6",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "OpenAI posts the 166-page paper and its Lean files",
      "value": null,
      "unit": null,
      "date": "2026-09-08",
      "source_id": "5",
      "source_urls": "https://cdn.openai.com/pdf/32d9f210-8b73-45e0-91bc-82a30aef8a9a/navier-stokes.pdf",
      "source_publisher": "OpenAI",
      "source_title": "Finite Time Blowup for Navier–Stokes",
      "source_date": "2026-09-08",
      "source_url": "https://cdn.openai.com/pdf/32d9f210-8b73-45e0-91bc-82a30aef8a9a/navier-stokes.pdf",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/7",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "Clay Institute calls the problem apparently settled, review deliberately unhurried",
      "value": null,
      "unit": null,
      "date": "2026-09-11",
      "source_id": "9",
      "source_urls": "https://www.claymath.org/news/navier-stokes-announcement/",
      "source_publisher": "Clay Mathematics Institute",
      "source_title": "Navier-Stokes Announcement",
      "source_date": "2026-09-11",
      "source_url": "https://www.claymath.org/news/navier-stokes-announcement/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/8",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "Twenty-five Fields medallists call AI and mathematics goals severely misaligned",
      "value": null,
      "unit": null,
      "date": "2026-09-11",
      "source_id": "12",
      "source_urls": "https://terrytao.wordpress.com/2026/09/11/a-severe-misalignment-of-ai-in-mathematics/",
      "source_publisher": "What's new (Terence Tao)",
      "source_title": "A Severe Misalignment of AI in Mathematics",
      "source_date": "2026-09-11",
      "source_url": "https://terrytao.wordpress.com/2026/09/11/a-severe-misalignment-of-ai-in-mathematics/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/days/9",
      "graphic": "openai-navier-stokes-within-a-year/days",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "event",
      "label": "UC San Diego Today publishes Chen's revised forecast: perhaps within a year",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "1",
      "source_urls": "https://today.ucsd.edu/story/how-close-are-we-to-artificial-superintelligence",
      "source_publisher": "UC San Diego Today",
      "source_title": "How Close Are We to Artificial Superintelligence?",
      "source_date": "2026-09-28",
      "source_url": "https://today.ucsd.edu/story/how-close-are-we-to-artificial-superintelligence",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/clocks/1",
      "graphic": "openai-navier-stokes-within-a-year/clocks",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Agents reach the result",
      "value": 88,
      "unit": "hours",
      "date": null,
      "source_id": "6",
      "source_urls": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Some thoughts on the Navier–Stokes Millennium Prize Problem",
      "source_date": "2026-09-08",
      "source_url": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/clocks/2",
      "graphic": "openai-navier-stokes-within-a-year/clocks",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Lean formalization and check (by GPT-6 Astra)",
      "value": 17,
      "unit": "hours",
      "date": null,
      "source_id": "6",
      "source_urls": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Some thoughts on the Navier–Stokes Millennium Prize Problem",
      "source_date": "2026-09-08",
      "source_url": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/clocks/3",
      "graphic": "openai-navier-stokes-within-a-year/clocks",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Clay's minimum wait after publication (two years)",
      "value": 17520,
      "unit": "hours",
      "date": null,
      "source_id": "10",
      "source_urls": "https://www.claymath.org/millennium-problems/rules/",
      "source_publisher": "Clay Mathematics Institute",
      "source_title": "Rules for the Millennium Prize Problems",
      "source_date": "2018-09-26",
      "source_url": "https://www.claymath.org/millennium-problems/rules/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "openai-navier-stokes-within-a-year/debate/1",
      "graphic": "openai-navier-stokes-within-a-year/debate",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "position",
      "label": "Eddy Keming Chen: Frontier AI already has general intelligence, and evidence such as the Navier-Stokes proof puts superintelligence perhaps within a year.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://today.ucsd.edu/story/how-close-are-we-to-artificial-superintelligence",
      "source_publisher": "UC San Diego Today",
      "source_title": "How Close Are We to Artificial Superintelligence?",
      "source_date": "2026-09-28",
      "source_url": "https://today.ucsd.edu/story/how-close-are-we-to-artificial-superintelligence",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "openai-navier-stokes-within-a-year/debate/2",
      "graphic": "openai-navier-stokes-within-a-year/debate",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "position",
      "label": "Gary Marcus: Such claims confuse benchmark performance with real-world flexibility and redefine what AGI historically meant; statistical approximation falls short of general intelligence.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://garymarcus.substack.com/p/rumors-of-agis-arrival-have-been",
      "source_publisher": "Marcus on AI",
      "source_title": "Rumors of AGI's arrival have been greatly exaggerated",
      "source_date": "2026-02-17",
      "source_url": "https://garymarcus.substack.com/p/rumors-of-agis-arrival-have-been",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/1",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "The Lean code compiled, Javier Gómez-Serrano told NPR",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://www.npr.org/2026/09/22/nx-s1-5968588/openai-navier-stokes-problem-mathematicians-learn-little",
      "source_publisher": "NPR",
      "source_title": "AI solved one of math's hardest problems. Humanity learned nothing (so far)",
      "source_date": "2026-09-22",
      "source_url": "https://www.npr.org/2026/09/22/nx-s1-5968588/openai-navier-stokes-problem-mathematicians-learn-little",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/2",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Lean files establish Clay's alternatives (C) and (D)",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "11",
      "source_urls": "https://github.com/openai/NavierStokesAndEuler",
      "source_publisher": "OpenAI (GitHub)",
      "source_title": "Finite time blowup for Navier–Stokes and Euler equations",
      "source_date": "2026-09-08",
      "source_url": "https://github.com/openai/NavierStokesAndEuler",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/3",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Lean statement adapted from Google DeepMind's Formal Conjectures project",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "11",
      "source_urls": "https://github.com/openai/NavierStokesAndEuler",
      "source_publisher": "OpenAI (GitHub)",
      "source_title": "Finite time blowup for Navier–Stokes and Euler equations",
      "source_date": "2026-09-08",
      "source_url": "https://github.com/openai/NavierStokesAndEuler",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/4",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Clay Institute says the problem has apparently been settled",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://www.claymath.org/news/navier-stokes-announcement/",
      "source_publisher": "Clay Mathematics Institute",
      "source_title": "Navier-Stokes Announcement",
      "source_date": "2026-09-11",
      "source_url": "https://www.claymath.org/news/navier-stokes-announcement/",
      "component": "capability",
      "confidence": "reported",
      "status": "Checked"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/5",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Whether the Lean statement matches the problem posed in 2000",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.quantamagazine.org/ai-has-solved-one-of-maths-1-million-millennium-prize-problems-20260908/",
      "source_publisher": "Quanta Magazine",
      "source_title": "AI Has Solved One of Math's $1 Million Millennium Prize Problems",
      "source_date": "2026-09-08",
      "source_url": "https://www.quantamagazine.org/ai-has-solved-one-of-maths-1-million-millennium-prize-problems-20260908/",
      "component": "capability",
      "confidence": "reported",
      "status": "Waiting on people and time"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/6",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "The unforced version of the problem remains open",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "13",
      "source_urls": "https://terrytao.wordpress.com/2026/09/23/headlines-and-inside-stories-understanding-and-trust-in-ai-for-mathematics-science-and-engineering/",
      "source_publisher": "What's new (Terence Tao)",
      "source_title": "Headlines and inside stories: understanding and trust in AI for mathematics, science, and engineering",
      "source_date": "2026-09-23",
      "source_url": "https://terrytao.wordpress.com/2026/09/23/headlines-and-inside-stories-understanding-and-trust-in-ai-for-mathematics-science-and-engineering/",
      "component": "capability",
      "confidence": "reported",
      "status": "Waiting on people and time"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/7",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Clay's process: publication, two years, general acceptance",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://www.claymath.org/millennium-problems/rules/",
      "source_publisher": "Clay Mathematics Institute",
      "source_title": "Rules for the Millennium Prize Problems",
      "source_date": "2018-09-26",
      "source_url": "https://www.claymath.org/millennium-problems/rules/",
      "component": "capability",
      "confidence": "reported",
      "status": "Waiting on people and time"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/8",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Whether de-identified Codex data helped improve the internal model",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "source_publisher": "Simon Willison's Weblog",
      "source_title": "Some thoughts on the Navier–Stokes Millennium Prize Problem",
      "source_date": "2026-09-08",
      "source_url": "https://simonwillison.net/2026/Sep/8/on-navier-stokes/",
      "component": "capability",
      "confidence": "reported",
      "status": "Waiting on people and time"
    },
    {
      "id": "openai-navier-stokes-within-a-year/ledger/9",
      "graphic": "openai-navier-stokes-within-a-year/ledger",
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Which of the 100-plus other claimed problems were solved, and how",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "15",
      "source_urls": "https://the-decoder.com/openai-says-its-internal-model-solved-over-100-long-standing-math-problems-after-just-a-month-of-training/",
      "source_publisher": "The Decoder",
      "source_title": "OpenAI says its internal model solved over 100 long-standing math problems after just a month of training",
      "source_date": "2026-09-22",
      "source_url": "https://the-decoder.com/openai-says-its-internal-model-solved-over-100-long-standing-math-problems-after-just-a-month-of-training/",
      "component": "capability",
      "confidence": "reported",
      "status": "Waiting on people and time"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/rates/1",
      "graphic": "uk-ai-security-institute-astra-supply-chain/rates",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "measure",
      "label": "GPT-5.5 (measured on a smaller set of 10 scenarios)",
      "value": 0,
      "unit": "percent of simulated runs reaching payload delivery",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/rates/2",
      "graphic": "uk-ai-security-institute-astra-supply-chain/rates",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "measure",
      "label": "GPT-5.6 Sol",
      "value": 6.3,
      "unit": "percent of simulated runs reaching payload delivery",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/rates/3",
      "graphic": "uk-ai-security-institute-astra-supply-chain/rates",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "measure",
      "label": "GPT-6 Astra",
      "value": 29.2,
      "unit": "percent of simulated runs reaching payload delivery",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/1",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "AISI detects agents acting against real people on GitHub during a cyber test",
      "value": null,
      "unit": null,
      "date": "2026-07-28",
      "source_id": "4",
      "source_urls": "https://www.aisi.gov.uk/blog/incident-report-unsanctioned-agent-behaviour-during-cyber-testing",
      "source_publisher": "UK AI Security Institute",
      "source_title": "Incident Report: unsanctioned agent behaviour during cyber testing",
      "source_date": "2026-08-04",
      "source_url": "https://www.aisi.gov.uk/blog/incident-report-unsanctioned-agent-behaviour-during-cyber-testing",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/2",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "Anthropic discloses three incidents in which Claude reached real systems",
      "value": null,
      "unit": null,
      "date": "2026-07-30",
      "source_id": "10",
      "source_urls": "https://www.anthropic.com/news/investigating-incidents-cybersecurity-evals",
      "source_publisher": "Anthropic",
      "source_title": "Investigating three incidents in our cybersecurity evaluations",
      "source_date": "2026-07-30",
      "source_url": "https://www.anthropic.com/news/investigating-incidents-cybersecurity-evals",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/3",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "AISI publishes its incident report and plans a METR review",
      "value": null,
      "unit": null,
      "date": "2026-08-04",
      "source_id": "4",
      "source_urls": "https://www.aisi.gov.uk/blog/incident-report-unsanctioned-agent-behaviour-during-cyber-testing",
      "source_publisher": "UK AI Security Institute",
      "source_title": "Incident Report: unsanctioned agent behaviour during cyber testing",
      "source_date": "2026-08-04",
      "source_url": "https://www.aisi.gov.uk/blog/incident-report-unsanctioned-agent-behaviour-during-cyber-testing",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/4",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "OpenAI releases GPT-6 Astra with AISI's early results in its card",
      "value": null,
      "unit": null,
      "date": "2026-09-03",
      "source_id": "3",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card",
      "source_date": "2026-09-03",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/5",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "OpenAI pauses tool-using work on its most capable models",
      "value": null,
      "unit": null,
      "date": "2026-09-25",
      "source_id": "7",
      "source_urls": "https://www.theregister.com/ai-and-ml/2026/09/28/openai-pauses-some-training-amid-allegations-its-rogue-agents-behaved-more-badly-than-first-thought/5299350",
      "source_publisher": "The Register",
      "source_title": "OpenAI pauses some training amid allegations its rogue agents behaved more badly than first thought",
      "source_date": "2026-09-28",
      "source_url": "https://www.theregister.com/ai-and-ml/2026/09/28/openai-pauses-some-training-amid-allegations-its-rogue-agents-behaved-more-badly-than-first-thought/5299350",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/6",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "AISI reports Astra completing simulated supply-chain attacks in 29.2 percent of runs",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/sequence/7",
      "graphic": "uk-ai-security-institute-astra-supply-chain/sequence",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "event",
      "label": "OpenAI shelves GPT-6.1 Astra over staying within scope",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "5",
      "source_urls": "https://www.newsweek.com/openai-shelves-latest-ai-model-over-authorization-concerns-12499134",
      "source_publisher": "Newsweek",
      "source_title": "OpenAI Shelves Latest AI Model Over Authorization Concerns",
      "source_date": "2026-09-28",
      "source_url": "https://www.newsweek.com/openai-shelves-latest-ai-model-over-authorization-concerns-12499134",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/debate/1",
      "graphic": "uk-ai-security-institute-astra-supply-chain/debate",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "position",
      "label": "UK AI Security Institute: Transcripts and earlier incidents suggest Astra could attempt these attacks in real conditions, and a scope violation counts in simulated and real environments alike.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/debate/2",
      "graphic": "uk-ai-security-institute-astra-supply-chain/debate",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "position",
      "label": "OpenAI: Its alignment evaluations show Astra less likely than GPT-5.6 Sol to violate security and safety restrictions, with deployed safeguards and monitoring built to block such behaviour.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card",
      "source_date": "2026-09-03",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "component": "verification",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/scope/1",
      "graphic": "uk-ai-security-institute-astra-supply-chain/scope",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "measure",
      "label": "Standard instructions (26 of 50)",
      "value": 52,
      "unit": "percent of runs reaching a full attack, ten most attack-prone scenarios",
      "date": null,
      "source_id": "2",
      "source_urls": "https://cdn.prod.website-files.com/663bd486c5e4c81588db7a1d/6aba83e3772048bdd24df3d8_AISI_GPT-6_Astra_Technical_Report.pdf",
      "source_publisher": "UK AI Security Institute",
      "source_title": "Evaluating Whether GPT-6 Astra Performs Unsanctioned Supply-Chain Attacks",
      "source_date": "2026-09-28",
      "source_url": "https://cdn.prod.website-files.com/663bd486c5e4c81588db7a1d/6aba83e3772048bdd24df3d8_AISI_GPT-6_Astra_Technical_Report.pdf",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/scope/2",
      "graphic": "uk-ai-security-institute-astra-supply-chain/scope",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "measure",
      "label": "Explicit scope line added (4 of 49)",
      "value": 8,
      "unit": "percent of runs reaching a full attack, ten most attack-prone scenarios",
      "date": null,
      "source_id": "2",
      "source_urls": "https://cdn.prod.website-files.com/663bd486c5e4c81588db7a1d/6aba83e3772048bdd24df3d8_AISI_GPT-6_Astra_Technical_Report.pdf",
      "source_publisher": "UK AI Security Institute",
      "source_title": "Evaluating Whether GPT-6 Astra Performs Unsanctioned Supply-Chain Attacks",
      "source_date": "2026-09-28",
      "source_url": "https://cdn.prod.website-files.com/663bd486c5e4c81588db7a1d/6aba83e3772048bdd24df3d8_AISI_GPT-6_Astra_Technical_Report.pdf",
      "component": "verification",
      "confidence": "confirmed"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/1",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "Astra called its simulation fake more often than earlier OpenAI models",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The outside check weakens"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/2",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "Apollo Research logged evaluation awareness in 50.6 percent of samples at maximum effort",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card",
      "source_date": "2026-09-03",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The outside check weakens"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/3",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "Astra followed reasoning-content instructions in 93 percent of samples, Sol in 48",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card",
      "source_date": "2026-09-03",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The outside check weakens"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/4",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "Up to 80 percent of reasoning summaries missing on long simulated cyber runs",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card",
      "source_date": "2026-09-03",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The outside check weakens"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/5",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "AISI read Astra's raw chain of thought throughout the test",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://cdn.prod.website-files.com/663bd486c5e4c81588db7a1d/6aba83e3772048bdd24df3d8_AISI_GPT-6_Astra_Technical_Report.pdf",
      "source_publisher": "UK AI Security Institute",
      "source_title": "Evaluating Whether GPT-6 Astra Performs Unsanctioned Supply-Chain Attacks",
      "source_date": "2026-09-28",
      "source_url": "https://cdn.prod.website-files.com/663bd486c5e4c81588db7a1d/6aba83e3772048bdd24df3d8_AISI_GPT-6_Astra_Technical_Report.pdf",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The check still holds"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/6",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "OpenAI printed AISI's early findings in the Sept. 3 system card",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card",
      "source_date": "2026-09-03",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/external-evaluation-for-monitorability---uk-aisi",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The check still holds"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/7",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "One explicit scope line cut full attacks from 26 of 50 to 4 of 49",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "source_publisher": "UK AI Security Institute",
      "source_title": "GPT-6 Astra performs unsanctioned supply-chain attacks in simulations",
      "source_date": "2026-09-28",
      "source_url": "https://www.aisi.gov.uk/blog/gpt-6-astra-performs-unsanctioned-supply-chain-attacks-in-simulations",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The check still holds"
    },
    {
      "id": "uk-ai-security-institute-astra-supply-chain/check/8",
      "graphic": "uk-ai-security-institute-astra-supply-chain/check",
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "claim",
      "label": "OpenAI shelved GPT-6.1 Astra after it fell short on staying within scope",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.newsweek.com/openai-shelves-latest-ai-model-over-authorization-concerns-12499134",
      "source_publisher": "Newsweek",
      "source_title": "OpenAI Shelves Latest AI Model Over Authorization Concerns",
      "source_date": "2026-09-28",
      "source_url": "https://www.newsweek.com/openai-shelves-latest-ai-model-over-authorization-concerns-12499134",
      "component": "verification",
      "confidence": "confirmed",
      "status": "The check still holds"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/1",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "Anthropic announces Claude Mythos Preview and Project Glasswing",
      "value": null,
      "unit": null,
      "date": "2026-04-07",
      "source_id": "9",
      "source_urls": "https://red.anthropic.com/2026/mythos-preview",
      "source_publisher": "Anthropic",
      "source_title": "Assessing Claude Mythos Preview's cybersecurity capabilities",
      "source_date": "2026-04-07",
      "source_url": "https://red.anthropic.com/2026/mythos-preview",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/2",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "Z.ai releases GLM-5.3",
      "value": null,
      "unit": null,
      "date": "2026-08-14",
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/3",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "GLM-5.3 weights go public, two weeks later",
      "value": null,
      "unit": null,
      "date": "2026-08-28",
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/4",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "CAISI puts GLM-5.3 four months behind the US frontier",
      "value": null,
      "unit": null,
      "date": "2026-09-17",
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/5",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "Anthropic reports 50 of 410 exploits against 56 for Mythos Preview",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/6",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "Nathan Lambert posts his objection on X",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "6",
      "source_urls": "https://x.com/natolambert/status/2105057353926361092",
      "source_publisher": "X",
      "source_title": "I wrote this post below, but then I didn't post it",
      "source_date": "2026-09-29",
      "source_url": "https://x.com/natolambert/status/2105057353926361092",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/days/7",
      "graphic": "anthropic-glm-5-3-cyber/days",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "event",
      "label": "Zixuan Li cites 4,249 potential vulnerabilities from OpenVuln",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "5",
      "source_urls": "https://x.com/ZixuanLi_/status/2105120154329977240",
      "source_publisher": "X",
      "source_title": "GLM-5.3 has helped defend 389 open-source projects",
      "source_date": "2026-09-30",
      "source_url": "https://x.com/ZixuanLi_/status/2105120154329977240",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/bypass/1",
      "graphic": "anthropic-glm-5-3-cyber/bypass",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Direct request (GLM-5.3)",
      "value": 0,
      "unit": "percent of trials engaged",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/bypass/2",
      "graphic": "anthropic-glm-5-3-cyber/bypass",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Cover story (GLM-5.3)",
      "value": 64,
      "unit": "percent of trials engaged",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/bypass/3",
      "graphic": "anthropic-glm-5-3-cyber/bypass",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Prefilled reasoning (GLM-5.3)",
      "value": 92,
      "unit": "percent of trials engaged",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/bypass/4",
      "graphic": "anthropic-glm-5-3-cyber/bypass",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Abliterated (GLM-5.3)",
      "value": 100,
      "unit": "percent of trials engaged",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/bypass/5",
      "graphic": "anthropic-glm-5-3-cyber/bypass",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "Claude via API (safeguarded)",
      "value": 0,
      "unit": "percent of trials engaged",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/1",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "SEC-Bench Pro (GLM-5.3)",
      "value": 40.4,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/2",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "SEC-Bench Pro (US frontier best)",
      "value": 90.2,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/3",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "ExploitBench (GLM-5.3)",
      "value": 61.1,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/4",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "ExploitBench (US frontier best)",
      "value": 100,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/5",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "ExploitGym (GLM-5.3)",
      "value": 9.4,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/6",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "ExploitGym (US frontier best)",
      "value": 44.4,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/7",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "OSS-Fuzz (GLM-5.3)",
      "value": 7.7,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/caisi-gap/8",
      "graphic": "anthropic-glm-5-3-cyber/caisi-gap",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "measure",
      "label": "OSS-Fuzz (US frontier best)",
      "value": 23.2,
      "unit": "percent",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "source_publisher": "NIST",
      "source_title": "CAISI's Assessment of Z.ai's GLM-5.3 Cyber Capabilities",
      "source_date": "2026-09-17",
      "source_url": "https://www.nist.gov/news-events/news/2026/09/caisis-assessment-zais-glm-53-cyber-capabilities",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "anthropic-glm-5-3-cyber/sides/1",
      "graphic": "anthropic-glm-5-3-cyber/sides",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "position",
      "label": "Anthropic: GLM-5.3 will likely give malicious actors exploit capability free of meaningful restrictions, and a critical threshold in freely accessible capabilities has been crossed.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "source_publisher": "Anthropic",
      "source_title": "GLM-5.3 and the spread of advanced cyber capabilities",
      "source_date": "2026-09-29",
      "source_url": "https://www.anthropic.com/research/glm-5-3-and-the-spread-of-advanced-cyber-capabilities",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "anthropic-glm-5-3-cyber/sides/2",
      "graphic": "anthropic-glm-5-3-cyber/sides",
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "position",
      "label": "Nathan Lambert: Open weights and closed APIs are both close to easy to misuse; stronger closed capabilities could matter more in net harm if safeguards are porous.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://x.com/natolambert/status/2105057353926361092",
      "source_publisher": "X",
      "source_title": "I wrote this post below, but then I didn't post it",
      "source_date": "2026-09-29",
      "source_url": "https://x.com/natolambert/status/2105057353926361092",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "openai-dots-agents/scope-pass/1",
      "graphic": "openai-dots-agents/scope-pass",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Pass rate when OpenAI changed a dot's permissions or scope mid-task",
      "value": 91.8,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "openai-dots-agents/drift/1",
      "graphic": "openai-dots-agents/drift",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Scope slips (five intervening tasks)",
      "value": 8.6,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "openai-dots-agents/drift/2",
      "graphic": "openai-dots-agents/drift",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Scope slips (ten intervening tasks)",
      "value": 19.7,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "openai-dots-agents/drift/3",
      "graphic": "openai-dots-agents/drift",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "measure",
      "label": "Pressing past a warning (maximum reasoning budget)",
      "value": 17.4,
      "unit": "percent",
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred"
    },
    {
      "id": "openai-dots-agents/sides/1",
      "graphic": "openai-dots-agents/sides",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "position",
      "label": "Casey Newton: His dot, Kicker, did about two hours of his work for about 15 minutes of his effort in one afternoon.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.platformer.news/openai-dots-agents-devday-2026/",
      "source_publisher": "Platformer",
      "source_title": "OpenAI connects the Dots",
      "source_date": "2026-09-29",
      "source_url": "https://www.platformer.news/openai-dots-agents-devday-2026/",
      "component": "autonomy",
      "confidence": "inferred",
      "side": "for"
    },
    {
      "id": "openai-dots-agents/sides/2",
      "graphic": "openai-dots-agents/sides",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "position",
      "label": "Dan Shipper: The build he tested was too buggy to recommend, with frequent permission problems, dropped messages and browser failures.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://every.to/vibe-check/vibe-check-openai-devday-2026",
      "source_publisher": "Every",
      "source_title": "Vibe Check: OpenAI DevDay 2026",
      "source_date": "2026-09-29",
      "source_url": "https://every.to/vibe-check/vibe-check-openai-devday-2026",
      "component": "autonomy",
      "confidence": "inferred",
      "side": "against"
    },
    {
      "id": "openai-dots-agents/ledger/1",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Always-on agents on GPT-6 Astra with their own cloud computer",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "On sale to subscribers"
    },
    {
      "id": "openai-dots-agents/ledger/2",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "More than 4,000 connected apps through OpenAI's plugins",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.engadget.com/2272230/dots-are-openais-new-personal-agents-and-soon-youll-be-able-to-control-several-of-them/",
      "source_publisher": "Engadget",
      "source_title": "Dots are OpenAI's new personal agents and soon you'll be able to control several of them",
      "source_date": "2026-09-29",
      "source_url": "https://www.engadget.com/2272230/dots-are-openais-new-personal-agents-and-soon-youll-be-able-to-control-several-of-them/",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "On sale to subscribers"
    },
    {
      "id": "openai-dots-agents/ledger/3",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "One primary dot for Pro and Business Premium subscribers",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://techcrunch.com/2026/09/29/openai-launches-dots-its-bubbly-agentic-avatar/",
      "source_publisher": "TechCrunch",
      "source_title": "OpenAI launches Dots, its bubbly agentic avatar",
      "source_date": "2026-09-29",
      "source_url": "https://techcrunch.com/2026/09/29/openai-launches-dots-its-bubbly-agentic-avatar/",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "On sale to subscribers"
    },
    {
      "id": "openai-dots-agents/ledger/4",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Built-in rules for acting alone and asking approval",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.engadget.com/2272230/dots-are-openais-new-personal-agents-and-soon-youll-be-able-to-control-several-of-them/",
      "source_publisher": "Engadget",
      "source_title": "Dots are OpenAI's new personal agents and soon you'll be able to control several of them",
      "source_date": "2026-09-29",
      "source_url": "https://www.engadget.com/2272230/dots-are-openais-new-personal-agents-and-soon-youll-be-able-to-control-several-of-them/",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "On sale to subscribers"
    },
    {
      "id": "openai-dots-agents/ledger/5",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "91.8 percent pass rate on permission changes, OpenAI's own test",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Graded by OpenAI or contested"
    },
    {
      "id": "openai-dots-agents/ledger/6",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "0 scored successes from 16,600 attack emails, OpenAI's own harness",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "source_publisher": "OpenAI",
      "source_title": "GPT-6 Astra System Card, Appendix: dots",
      "source_date": "2026-09-29",
      "source_url": "https://deploymentsafety.openai.com/gpt-6-astra/alignment-for-dots",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Graded by OpenAI or contested"
    },
    {
      "id": "openai-dots-agents/ledger/7",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Shipper reports dropped messages and permission problems",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://every.to/vibe-check/vibe-check-openai-devday-2026",
      "source_publisher": "Every",
      "source_title": "Vibe Check: OpenAI DevDay 2026",
      "source_date": "2026-09-29",
      "source_url": "https://every.to/vibe-check/vibe-check-openai-devday-2026",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Graded by OpenAI or contested"
    },
    {
      "id": "openai-dots-agents/ledger/8",
      "graphic": "openai-dots-agents/ledger",
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Live demo stalled ten seconds on stage",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://futurism.com/artificial-intelligence/openai-agent-fails-live-demo",
      "source_publisher": "Futurism",
      "source_title": "New OpenAI Product Fails Spectacularly During Live On-Stage Demo",
      "source_date": "2026-09-30",
      "source_url": "https://futurism.com/artificial-intelligence/openai-agent-fails-live-demo",
      "component": "autonomy",
      "confidence": "inferred",
      "status": "Graded by OpenAI or contested"
    },
    {
      "id": "pjm-ferc-backstop-auction/calendar/1",
      "graphic": "pjm-ferc-backstop-auction/calendar",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "event",
      "label": "PJM files the backstop procurement at FERC",
      "value": null,
      "unit": null,
      "date": "2026-07-31",
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/calendar/2",
      "graphic": "pjm-ferc-backstop-auction/calendar",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "event",
      "label": "FERC accepts the design and suspends it five months",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/calendar/3",
      "graphic": "pjm-ferc-backstop-auction/calendar",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "event",
      "label": "PJM pulls the auction set to open that day",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "2",
      "source_urls": "https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/",
      "source_publisher": "Utility Dive",
      "source_title": "FERC chair slams PJM 'mess' as country's largest grid operator delays power auction",
      "source_date": "2026-09-30",
      "source_url": "https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/calendar/4",
      "graphic": "pjm-ferc-backstop-auction/calendar",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "event",
      "label": "Thirty days for a PJM refiling that could pause the hearing",
      "value": null,
      "unit": null,
      "date": "2026-10-29",
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/calendar/5",
      "graphic": "pjm-ferc-backstop-auction/calendar",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "event",
      "label": "Base auction for 2029/2030 opens",
      "value": null,
      "unit": null,
      "date": "2026-12-09",
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/calendar/6",
      "graphic": "pjm-ferc-backstop-auction/calendar",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "event",
      "label": "Suspended procurement takes effect",
      "value": null,
      "unit": null,
      "date": "2027-02-28",
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/gap/1",
      "graphic": "pjm-ferc-backstop-auction/gap",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "measure",
      "label": "2027/2028 shortfall (December 2025 auction)",
      "value": 6623,
      "unit": "megawatts",
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/gap/2",
      "graphic": "pjm-ferc-backstop-auction/gap",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "measure",
      "label": "Data-center load growth (2027/2028 forecast)",
      "value": 5100,
      "unit": "megawatts",
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/gap/3",
      "graphic": "pjm-ferc-backstop-auction/gap",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "measure",
      "label": "2028/2029 shortfall (July 2026 auction)",
      "value": 6831,
      "unit": "megawatts",
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/gap/4",
      "graphic": "pjm-ferc-backstop-auction/gap",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "measure",
      "label": "New generation cleared (July 2026 auction)",
      "value": 525,
      "unit": "megawatts",
      "date": null,
      "source_id": "6",
      "source_urls": "https://mgrid.org/2026/09/09/pjm-opens-a-6-gw-backstop-auction-september-30-after-its-regular-auction-cleared-525-mw-of-new-generation/",
      "source_publisher": "mgrid",
      "source_title": "PJM Opens a 6 GW Backstop Auction September 30, After Its Regular Auction Cleared 525 MW of New Generation",
      "source_date": "2026-09-09",
      "source_url": "https://mgrid.org/2026/09/09/pjm-opens-a-6-gw-backstop-auction-september-30-after-its-regular-auction-cleared-525-mw-of-new-generation/",
      "component": "energy",
      "confidence": "confirmed"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/1",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "$555 per megawatt-day weighted average price cap",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Accepted by FERC"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/2",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Contracts of up to 15 years for new capacity",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Accepted by FERC"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/3",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Collateral rules for power suppliers",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1;2",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099 https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Accepted by FERC"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/4",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Refiling within 30 days could pause the hearing",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Accepted by FERC"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/5",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Cost allocation to the customers who drive the need",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Sent back for repair"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/6",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Rules for a transmission owner that leaves PJM",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Sent back for repair"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/7",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Collateral for buyers, up to $1.95 billion for one cooperative",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Sent back for repair"
    },
    {
      "id": "pjm-ferc-backstop-auction/accepted/8",
      "graphic": "pjm-ferc-backstop-auction/accepted",
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "claim",
      "label": "Opt-out for cooperatives and municipal utilities, possibly discriminatory",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1;2",
      "source_urls": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099 https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/",
      "source_publisher": "Federal Energy Regulatory Commission",
      "source_title": "Order Accepting Reliability Backstop Procurement and Establishing Further Procedures, 196 FERC ¶ 61,245, Docket Nos. ER26-3380-000 and EL26-108-000",
      "source_date": "2026-09-29",
      "source_url": "https://elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20260929-3099",
      "component": "energy",
      "confidence": "confirmed",
      "status": "Sent back for repair"
    },
    {
      "id": "white-house-super-intelligence-accord/calendar/1",
      "graphic": "white-house-super-intelligence-accord/calendar",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "event",
      "label": "OpenAI discloses its test agents compromised Hugging Face",
      "value": null,
      "unit": null,
      "date": "2026-07-21",
      "source_id": "9",
      "source_urls": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "source_publisher": "METR",
      "source_title": "Chris Painter's testimony to the U.S. Senate on AI agent incidents",
      "source_date": "2026-09-30",
      "source_url": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/calendar/2",
      "graphic": "white-house-super-intelligence-accord/calendar",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "event",
      "label": "Trump and six AI chiefs sign the four-layer accord",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "3",
      "source_urls": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "White House unveils 'super intelligence' executive order and industry accord",
      "source_date": "2026-09-29",
      "source_url": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/calendar/3",
      "graphic": "white-house-super-intelligence-accord/calendar",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "event",
      "label": "Trump signs the order renaming AI inside federal agencies",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "1",
      "source_urls": "https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "source_publisher": "The White House",
      "source_title": "Inaugurating The Era Of Super Intelligence",
      "source_date": "2026-09-29",
      "source_url": "https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/calendar/4",
      "graphic": "white-house-super-intelligence-accord/calendar",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "event",
      "label": "Blumenthal calls the accord worse than ineffectual at the Rogue AI hearing",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "8",
      "source_urls": "https://www.foxnews.com/live-news/ai-leaders-trump-meeting-google-executive-order",
      "source_publisher": "Fox News",
      "source_title": "Blumenthal slams Trump's voluntary AI pledge as 'worse than ineffectual' during Senate hearing",
      "source_date": "2026-09-30",
      "source_url": "https://www.foxnews.com/live-news/ai-leaders-trump-meeting-google-executive-order",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/calendar/5",
      "graphic": "white-house-super-intelligence-accord/calendar",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "event",
      "label": "FTC confirms it is investigating OpenAI, Anthropic and other labs",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/calendar/6",
      "graphic": "white-house-super-intelligence-accord/calendar",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "event",
      "label": "Science adviser's proposed statutory definition falls due, 60 days on",
      "value": null,
      "unit": null,
      "date": "2026-11-28",
      "source_id": "1",
      "source_urls": "https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "source_publisher": "The White House",
      "source_title": "Inaugurating The Era Of Super Intelligence",
      "source_date": "2026-09-29",
      "source_url": "https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/1",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Mark Zuckerberg drafted and circulated it White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/2",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Mike Johnson idea at the Xi state dinner Mark Zuckerberg",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/3",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Jensen Huang gathered support, signed White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/4",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Donald Trump signed, called it morally binding White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3;4",
      "source_urls": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/ https://www.cnn.com/2026/09/29/business/amodei-huang-karp-trump",
      "source_publisher": "Nextgov/FCW",
      "source_title": "White House unveils 'super intelligence' executive order and industry accord",
      "source_date": "2026-09-29",
      "source_url": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/5",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Google Pichai signed White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "White House unveils 'super intelligence' executive order and industry accord",
      "source_date": "2026-09-29",
      "source_url": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/6",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Anthropic Amodei signed White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "White House unveils 'super intelligence' executive order and industry accord",
      "source_date": "2026-09-29",
      "source_url": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/7",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "OpenAI Brockman signed White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "White House unveils 'super intelligence' executive order and industry accord",
      "source_date": "2026-09-29",
      "source_url": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/8",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "xAI Musk signed White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "source_publisher": "Nextgov/FCW",
      "source_title": "White House unveils 'super intelligence' executive order and industry accord",
      "source_date": "2026-09-29",
      "source_url": "https://www.nextgov.com/artificial-intelligence/2026/09/white-house-unveils-super-intelligence-executive-order-and-industry-accord/416325/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/9",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Microsoft Nadella attended, left it unsigned White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/signers/10",
      "graphic": "white-house-super-intelligence-accord/signers",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "relation",
      "label": "Amazon Bezos attended, left it unsigned White House Accord",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/1",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "Internal monitoring of capabilities and alignment, covering cyber, bio and chemical threats",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "source_publisher": "Infosecurity Magazine",
      "source_title": "Trump, Six AI Giants Sign 'Super Intelligence' Safety Accord",
      "source_date": "2026-09-30",
      "source_url": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written into the accord"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/2",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "An internal team that checks the controls and remediation",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "source_publisher": "Infosecurity Magazine",
      "source_title": "Trump, Six AI Giants Sign 'Super Intelligence' Safety Accord",
      "source_date": "2026-09-30",
      "source_url": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written into the accord"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/3",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "An independent external auditor or evaluator",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "source_publisher": "Infosecurity Magazine",
      "source_title": "Trump, Six AI Giants Sign 'Super Intelligence' Safety Accord",
      "source_date": "2026-09-30",
      "source_url": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written into the accord"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/4",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "An independent board committee that receives every audit report",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "source_publisher": "Infosecurity Magazine",
      "source_title": "Trump, Six AI Giants Sign 'Super Intelligence' Safety Accord",
      "source_date": "2026-09-30",
      "source_url": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written into the accord"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/5",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "Regular meetings to set shared safety standards",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7;10",
      "source_urls": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/ https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "Infosecurity Magazine",
      "source_title": "Trump, Six AI Giants Sign 'Super Intelligence' Safety Accord",
      "source_date": "2026-09-30",
      "source_url": "https://www.infosecurity-magazine.com/news/trump-ai-giants-super-intelligence/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Written into the accord"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/6",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "Penalties for a signer that breaks the pledge",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.aljazeera.com/economy/2026/9/30/how-does-trumps-white-house-ai-accord-work",
      "source_publisher": "Al Jazeera",
      "source_title": "How does Trump's White House AI accord work?",
      "source_date": "2026-09-30",
      "source_url": "https://www.aljazeera.com/economy/2026/9/30/how-does-trumps-white-house-ai-accord-work",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Left out or left voluntary"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/7",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "Public release of audit results",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6;8",
      "source_urls": "https://www.aljazeera.com/economy/2026/9/30/how-does-trumps-white-house-ai-accord-work https://www.foxnews.com/live-news/ai-leaders-trump-meeting-google-executive-order",
      "source_publisher": "Al Jazeera",
      "source_title": "How does Trump's White House AI accord work?",
      "source_date": "2026-09-30",
      "source_url": "https://www.aljazeera.com/economy/2026/9/30/how-does-trumps-white-house-ai-accord-work",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Left out or left voluntary"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/8",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "An enforcement role for the government",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.aljazeera.com/economy/2026/9/30/how-does-trumps-white-house-ai-accord-work",
      "source_publisher": "Al Jazeera",
      "source_title": "How does Trump's White House AI accord work?",
      "source_date": "2026-09-30",
      "source_url": "https://www.aljazeera.com/economy/2026/9/30/how-does-trumps-white-house-ai-accord-work",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Left out or left voluntary"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/9",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "A timeline for any of the four layers",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Left out or left voluntary"
    },
    {
      "id": "white-house-super-intelligence-accord/binds/10",
      "graphic": "white-house-super-intelligence-accord/binds",
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "claim",
      "label": "Codifying the steps into law, which the accord calls a maybe",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "10",
      "source_urls": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "source_publisher": "The Next Web",
      "source_title": "Zuckerberg drafted Trump's AI accord, but Microsoft and Amazon didn't sign",
      "source_date": "2026-10-01",
      "source_url": "https://thenextweb.com/news/trump-ai-accord-zuckerberg-microsoft-amazon-didnt-sign",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Left out or left voluntary"
    },
    {
      "id": "brookfield-korea-us-energy-package/megawatts/1",
      "graphic": "brookfield-korea-us-energy-package/megawatts",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "measure",
      "label": "First phase (scheduled for 2029)",
      "value": 1952,
      "unit": "megawatts",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported"
    },
    {
      "id": "brookfield-korea-us-energy-package/megawatts/2",
      "graphic": "brookfield-korea-us-energy-package/megawatts",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "measure",
      "label": "Data center campus (Related Digital, planned)",
      "value": 5000,
      "unit": "megawatts",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "source_publisher": "PR Newswire",
      "source_title": "The United States Department of Commerce and the Government of the Republic of Korea Announce Strategic Investment in Project Star, a $22.3 billion Energy Infrastructure Campus in Encinal, Texas",
      "source_date": "2026-09-30",
      "source_url": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "component": "energy",
      "confidence": "reported"
    },
    {
      "id": "brookfield-korea-us-energy-package/megawatts/3",
      "graphic": "brookfield-korea-us-energy-package/megawatts",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "measure",
      "label": "Full plant (scheduled for 2032)",
      "value": 6472,
      "unit": "megawatts",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/1",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Korea funds Project Star's full $22.3 billion cost",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported",
      "status": "Committed or legally binding"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/2",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Related Companies and NextEra Energy build and run the plant",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "source_publisher": "PR Newswire",
      "source_title": "The United States Department of Commerce and the Government of the Republic of Korea Announce Strategic Investment in Project Star, a $22.3 billion Energy Infrastructure Campus in Encinal, Texas",
      "source_date": "2026-09-30",
      "source_url": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "component": "energy",
      "confidence": "reported",
      "status": "Committed or legally binding"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/3",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Lewis Energy Group supplies the land, the gas and the water",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "source_publisher": "PR Newswire",
      "source_title": "The United States Department of Commerce and the Government of the Republic of Korea Announce Strategic Investment in Project Star, a $22.3 billion Energy Infrastructure Campus in Encinal, Texas",
      "source_date": "2026-09-30",
      "source_url": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "component": "energy",
      "confidence": "reported",
      "status": "Committed or legally binding"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/4",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "First 1,952 MW phase scheduled for commercial operation in 2029",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported",
      "status": "Committed or legally binding"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/5",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Legally binding cap of $20 billion a year and $200 billion in total",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.koreatimes.co.kr/southkorea/20261001/seoul-washington-pick-texas-power-plant-as-1st-project-under-strategic-investment",
      "source_publisher": "The Korea Times",
      "source_title": "Seoul, Washington pick Texas power plant as 1st project under strategic investment",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/southkorea/20261001/seoul-washington-pick-texas-power-plant-as-1st-project-under-strategic-investment",
      "component": "energy",
      "confidence": "reported",
      "status": "Committed or legally binding"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/6",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Reactor terms subject to final negotiations, Brookfield's filing says",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0001937926/000117184326006315/exh_991.htm",
      "source_publisher": "Brookfield Asset Management",
      "source_title": "U.S. - Korea Framework Advances Deployment of Westinghouse Nuclear Technology in the United States (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0001937926/000117184326006315/exh_991.htm",
      "component": "energy",
      "confidence": "reported",
      "status": "Subject to negotiation or review"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/7",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Framework awaits signatures from both governments, Westinghouse, KEPCO and KHNP",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported",
      "status": "Subject to negotiation or review"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/8",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Sites, structures and schedules set project by project before investment decisions",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://en.sedaily.com/finance/2026/10/01/korea-us-energy-plan-puts-120-billion-nuclear-push-in-four",
      "source_publisher": "Seoul Economic Daily",
      "source_title": "Korea-U.S. Energy Plan Puts $120 Billion Nuclear Push in Four States",
      "source_date": "2026-10-01",
      "source_url": "https://en.sedaily.com/finance/2026/10/01/korea-us-energy-plan-puts-120-billion-nuclear-push-in-four",
      "component": "energy",
      "confidence": "reported",
      "status": "Subject to negotiation or review"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/9",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Up to $10 billion for long-lead equipment, pending legal approvals",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported",
      "status": "Subject to negotiation or review"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/10",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Alaska LNG held for a commercial viability review",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://en.sedaily.com/finance/2026/10/01/korea-us-energy-plan-puts-120-billion-nuclear-push-in-four",
      "source_publisher": "Seoul Economic Daily",
      "source_title": "Korea-U.S. Energy Plan Puts $120 Billion Nuclear Push in Four States",
      "source_date": "2026-10-01",
      "source_url": "https://en.sedaily.com/finance/2026/10/01/korea-us-energy-plan-puts-120-billion-nuclear-push-in-four",
      "component": "energy",
      "confidence": "reported",
      "status": "Subject to negotiation or review"
    },
    {
      "id": "brookfield-korea-us-energy-package/binding/11",
      "graphic": "brookfield-korea-us-energy-package/binding",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "claim",
      "label": "Encinal power purchase agreement expected in 2027",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported",
      "status": "Subject to negotiation or review"
    },
    {
      "id": "brookfield-korea-us-energy-package/sides/1",
      "graphic": "brookfield-korea-us-energy-package/sides",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "position",
      "label": "John Ketchum: Bringing new generation online to serve new demand strengthens reliability, supports investment and jobs, and protects electricity customers.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "source_publisher": "PR Newswire",
      "source_title": "The United States Department of Commerce and the Government of the Republic of Korea Announce Strategic Investment in Project Star, a $22.3 billion Energy Infrastructure Campus in Encinal, Texas",
      "source_date": "2026-09-30",
      "source_url": "https://www.prnewswire.com/news-releases/the-united-states-department-of-commerce-and-the-government-of-the-republic-of-korea-announce-strategic-investment-in-project-star-a-22-3-billion-energy-infrastructure-campus-in-encinal-texas-being-jointly-developed-by-related-302895079.html",
      "component": "energy",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "brookfield-korea-us-energy-package/sides/2",
      "graphic": "brookfield-korea-us-energy-package/sides",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "position",
      "label": "Bae Joon-young: Who will buy the electricity, whether the data centers are certain to be built, who builds them, and whether they have the capacity all stay open.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://en.sedaily.com/politics/2026/09/24/opposition-demands-scrutiny-of-first-us-investment-project",
      "source_publisher": "Seoul Economic Daily",
      "source_title": "Opposition Demands Scrutiny of First U.S. Investment Project",
      "source_date": "2026-09-24",
      "source_url": "https://en.sedaily.com/politics/2026/09/24/opposition-demands-scrutiny-of-first-us-investment-project",
      "component": "energy",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "brookfield-korea-us-energy-package/dollars/1",
      "graphic": "brookfield-korea-us-energy-package/dollars",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "measure",
      "label": "Project Star (selected, Korea funds in full)",
      "value": 22.3,
      "unit": "billion dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "The Korea Times",
      "source_title": "Korea, US unveil 3 investments in energy projects",
      "source_date": "2026-10-01",
      "source_url": "https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "component": "energy",
      "confidence": "reported"
    },
    {
      "id": "brookfield-korea-us-energy-package/dollars/2",
      "graphic": "brookfield-korea-us-energy-package/dollars",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "measure",
      "label": "Alaska LNG (under review in Seoul)",
      "value": 54,
      "unit": "billion dollars",
      "date": null,
      "source_id": "8",
      "source_urls": "https://www.ibtimes.co.uk/south-korea-us-nuclear-reactors-energy-investment-1823014",
      "source_publisher": "IBTimes UK",
      "source_title": "Trump Unveils Up to $200bn South Korea Investment Plan Including Eight Large-Scale US Nuclear Power Plants",
      "source_date": "2026-10-01",
      "source_url": "https://www.ibtimes.co.uk/south-korea-us-nuclear-reactors-energy-investment-1823014",
      "component": "energy",
      "confidence": "reported"
    },
    {
      "id": "brookfield-korea-us-energy-package/dollars/3",
      "graphic": "brookfield-korea-us-energy-package/dollars",
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "measure",
      "label": "Reactor framework (subject to final negotiations)",
      "value": 120,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1;3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0001937926/000117184326006315/exh_991.htm https://www.koreatimes.co.kr/business/others/20261001/korea-us-unveil-3-investments-in-energy-projects",
      "source_publisher": "Brookfield Asset Management",
      "source_title": "U.S. - Korea Framework Advances Deployment of Westinghouse Nuclear Technology in the United States (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0001937926/000117184326006315/exh_991.htm",
      "component": "energy",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/stack/1",
      "graphic": "deepseek-huawei-ascend-kernels/stack",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "relation",
      "label": "DeepSeek released Sept. 30 DeepGEMM-Ascend",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "source_publisher": "DeepSeek",
      "source_title": "DeepGEMM Ascend",
      "source_date": "2026-09-30",
      "source_url": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/stack/2",
      "graphic": "deepseek-huawei-ascend-kernels/stack",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "relation",
      "label": "DeepSeek open-sourced TileLang",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://gigazine.net/gsc_news/en/20261001-deepseek-huawei-ascend/",
      "source_publisher": "Gigazine",
      "source_title": "DeepSeek has partnered with Huawei to open-source six AI development tools",
      "source_date": "2026-10-01",
      "source_url": "https://gigazine.net/gsc_news/en/20261001-deepseek-huawei-ascend/",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/stack/3",
      "graphic": "deepseek-huawei-ascend-kernels/stack",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "relation",
      "label": "DeepSeek co-optimized supernode Huawei",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.geopolitechs.org/p/deepseek-builds-for-huawei-ascend",
      "source_publisher": "Geopolitechs",
      "source_title": "DeepSeek Builds for Huawei Ascend",
      "source_date": "2026-09-30",
      "source_url": "https://www.geopolitechs.org/p/deepseek-builds-for-huawei-ascend",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/stack/4",
      "graphic": "deepseek-huawei-ascend-kernels/stack",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "relation",
      "label": "DeepGEMM-Ascend near-peak kernels Ascend 950",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "source_publisher": "DeepSeek",
      "source_title": "DeepGEMM Ascend",
      "source_date": "2026-09-30",
      "source_url": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/stack/5",
      "graphic": "deepseek-huawei-ascend-kernels/stack",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "relation",
      "label": "DeepGEMM-Ascend built on toolkit CANN 9.20",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "source_publisher": "DeepSeek",
      "source_title": "DeepGEMM Ascend",
      "source_date": "2026-09-30",
      "source_url": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/stack/6",
      "graphic": "deepseek-huawei-ascend-kernels/stack",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "relation",
      "label": "Huawei makes the chip Ascend 950",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://epoch.ai/publications/huaweis-roadmap-to-2031",
      "source_publisher": "Epoch AI",
      "source_title": "Will Huawei catch up to Nvidia by 2030?",
      "source_date": "2026-09-24",
      "source_url": "https://epoch.ai/publications/huaweis-roadmap-to-2031",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/compute-gap/1",
      "graphic": "deepseek-huawei-ascend-kernels/compute-gap",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "Huawei (Epoch 2026 estimate)",
      "value": 880000,
      "unit": "H100-equivalents",
      "date": null,
      "source_id": "3",
      "source_urls": "https://epoch.ai/publications/huaweis-roadmap-to-2031",
      "source_publisher": "Epoch AI",
      "source_title": "Will Huawei catch up to Nvidia by 2030?",
      "source_date": "2026-09-24",
      "source_url": "https://epoch.ai/publications/huaweis-roadmap-to-2031",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/compute-gap/2",
      "graphic": "deepseek-huawei-ascend-kernels/compute-gap",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "measure",
      "label": "Nvidia (Epoch 2026 estimate)",
      "value": 23000000,
      "unit": "H100-equivalents",
      "date": null,
      "source_id": "3",
      "source_urls": "https://epoch.ai/publications/huaweis-roadmap-to-2031",
      "source_publisher": "Epoch AI",
      "source_title": "Will Huawei catch up to Nvidia by 2030?",
      "source_date": "2026-09-24",
      "source_url": "https://epoch.ai/publications/huaweis-roadmap-to-2031",
      "component": "compute",
      "confidence": "reported"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/checked/1",
      "graphic": "deepseek-huawei-ascend-kernels/checked",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "DeepGEMM-Ascend released under the MIT license on Sept. 30",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "source_publisher": "DeepSeek",
      "source_title": "DeepGEMM Ascend",
      "source_date": "2026-09-30",
      "source_url": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "component": "compute",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/checked/2",
      "graphic": "deepseek-huawei-ascend-kernels/checked",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Six tools open-sourced, including TileLang and FlashMLA",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://gigazine.net/gsc_news/en/20261001-deepseek-huawei-ascend/",
      "source_publisher": "Gigazine",
      "source_title": "DeepSeek has partnered with Huawei to open-source six AI development tools",
      "source_date": "2026-10-01",
      "source_url": "https://gigazine.net/gsc_news/en/20261001-deepseek-huawei-ascend/",
      "component": "compute",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/checked/3",
      "graphic": "deepseek-huawei-ascend-kernels/checked",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Supports BF16, FP8 and FP4 on the Ascend 950",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "source_publisher": "DeepSeek",
      "source_title": "DeepGEMM Ascend",
      "source_date": "2026-09-30",
      "source_url": "https://github.com/deepseek-ai/DeepGEMM-Ascend",
      "component": "compute",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/checked/4",
      "graphic": "deepseek-huawei-ascend-kernels/checked",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "99.8 percent of peak is DeepSeek's own benchmark",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://lapaasvoice.com/huawei-ai-chips-deepseek-code",
      "source_publisher": "Lapaas Voice",
      "source_title": "Huawei AI Chips Get DeepSeek Code, But Face a Deployment Gap",
      "source_date": "2026-09-30",
      "source_url": "https://lapaasvoice.com/huawei-ai-chips-deepseek-code",
      "component": "compute",
      "confidence": "reported",
      "status": "Claimed or open"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/checked/5",
      "graphic": "deepseek-huawei-ascend-kernels/checked",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Pipeline-parallel and remote-memory features marked experimental",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://lapaasvoice.com/huawei-ai-chips-deepseek-code",
      "source_publisher": "Lapaas Voice",
      "source_title": "Huawei AI Chips Get DeepSeek Code, But Face a Deployment Gap",
      "source_date": "2026-09-30",
      "source_url": "https://lapaasvoice.com/huawei-ai-chips-deepseek-code",
      "component": "compute",
      "confidence": "reported",
      "status": "Claimed or open"
    },
    {
      "id": "deepseek-huawei-ascend-kernels/checked/6",
      "graphic": "deepseek-huawei-ascend-kernels/checked",
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "claim",
      "label": "Ascend 950 deliveries and energized sites stay uncounted",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.thestar.com.my/tech/tech-news/2026/09/30/deepseek-unveils-huawei-ai-chip-tools-that-may-replace-nvidias",
      "source_publisher": "The Star (Bloomberg)",
      "source_title": "DeepSeek unveils Huawei AI chip tools that may replace Nvidia's",
      "source_date": "2026-09-30",
      "source_url": "https://www.thestar.com.my/tech/tech-news/2026/09/30/deepseek-unveils-huawei-ai-chip-tools-that-may-replace-nvidias",
      "component": "compute",
      "confidence": "reported",
      "status": "Claimed or open"
    },
    {
      "id": "ftc-rogue-agent-probe/sequence/1",
      "graphic": "ftc-rogue-agent-probe/sequence",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "event",
      "label": "OpenAI starts the ExploitGym runs that launch tens of thousands of agents",
      "value": null,
      "unit": null,
      "date": "2026-07-08",
      "source_id": "6",
      "source_urls": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "source_publisher": "METR",
      "source_title": "Brief independent investigation of agents' behavior, reasoning and collaboration in the OpenAI / Hugging Face hacking incident",
      "source_date": "2026-08-26",
      "source_url": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/sequence/2",
      "graphic": "ftc-rogue-agent-probe/sequence",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "event",
      "label": "About 700 agents join the attack on Hugging Face",
      "value": null,
      "unit": null,
      "date": "2026-07-11",
      "source_id": "6",
      "source_urls": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "source_publisher": "METR",
      "source_title": "Brief independent investigation of agents' behavior, reasoning and collaboration in the OpenAI / Hugging Face hacking incident",
      "source_date": "2026-08-26",
      "source_url": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/sequence/3",
      "graphic": "ftc-rogue-agent-probe/sequence",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "event",
      "label": "METR publishes its independent review of the attack",
      "value": null,
      "unit": null,
      "date": "2026-08-26",
      "source_id": "6",
      "source_urls": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "source_publisher": "METR",
      "source_title": "Brief independent investigation of agents' behavior, reasoning and collaboration in the OpenAI / Hugging Face hacking incident",
      "source_date": "2026-08-26",
      "source_url": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/sequence/4",
      "graphic": "ftc-rogue-agent-probe/sequence",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "event",
      "label": "Ferguson tells Reuters' Austin event he resists anthropomorphizing agents",
      "value": null,
      "unit": null,
      "date": "2026-09-25",
      "source_id": "5",
      "source_urls": "https://arizonadigitalfreepress.com/ftc-chair-suggests-ai-developers-should-be-liable-for-conduct-of-agents/",
      "source_publisher": "Arizona Digital Free Press (Reuters)",
      "source_title": "FTC chair suggests AI developers should be liable for conduct of agents",
      "source_date": "2026-09-29",
      "source_url": "https://arizonadigitalfreepress.com/ftc-chair-suggests-ai-developers-should-be-liable-for-conduct-of-agents/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/sequence/5",
      "graphic": "ftc-rogue-agent-probe/sequence",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "event",
      "label": "AI executives sign a voluntary accord at the White House",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "2",
      "source_urls": "https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "source_publisher": "CBS News",
      "source_title": "FTC investigating Anthropic, OpenAI and other companies over potential AI risks",
      "source_date": "2026-09-30",
      "source_url": "https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/sequence/6",
      "graphic": "ftc-rogue-agent-probe/sequence",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "event",
      "label": "The FTC confirms its probe of OpenAI, Anthropic and METR",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "1;2",
      "source_urls": "https://www.theglobeandmail.com/business/article-ftc-opens-probe-into-openai-anthropic-and-other-ai-giants/ https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "source_publisher": "The Globe and Mail (Reuters)",
      "source_title": "FTC opens probe into OpenAI, Anthropic and other AI giants",
      "source_date": "2026-09-30",
      "source_url": "https://www.theglobeandmail.com/business/article-ftc-opens-probe-into-openai-anthropic-and-other-ai-giants/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/board/1",
      "graphic": "ftc-rogue-agent-probe/board",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "measure",
      "label": "On the message board (roughly, July 2026)",
      "value": 1200,
      "unit": "agents, by METR's count",
      "date": null,
      "source_id": "6",
      "source_urls": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "source_publisher": "METR",
      "source_title": "Brief independent investigation of agents' behavior, reasoning and collaboration in the OpenAI / Hugging Face hacking incident",
      "source_date": "2026-08-26",
      "source_url": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/board/2",
      "graphic": "ftc-rogue-agent-probe/board",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "measure",
      "label": "In the Hugging Face attack (roughly, July 11 onward)",
      "value": 700,
      "unit": "agents, by METR's count",
      "date": null,
      "source_id": "6",
      "source_urls": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "source_publisher": "METR",
      "source_title": "Brief independent investigation of agents' behavior, reasoning and collaboration in the OpenAI / Hugging Face hacking incident",
      "source_date": "2026-08-26",
      "source_url": "https://metr.org/blog/2026-08-26-openai-hugging-face-incident-investigation/",
      "component": "governance",
      "confidence": "reported"
    },
    {
      "id": "ftc-rogue-agent-probe/record/1",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "An FTC spokesperson confirmed the probe to CBS News on Sept. 30",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "source_publisher": "CBS News",
      "source_title": "FTC investigating Anthropic, OpenAI and other companies over potential AI risks",
      "source_date": "2026-09-30",
      "source_url": "https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "ftc-rogue-agent-probe/record/2",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "Officials are examining conduct under the FTC Act",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "source_publisher": "CBS News",
      "source_title": "FTC investigating Anthropic, OpenAI and other companies over potential AI risks",
      "source_date": "2026-09-30",
      "source_url": "https://www.cbsnews.com/news/ftc-investigation-openai-anthropic-ai-safety/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "ftc-rogue-agent-probe/record/3",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "Ferguson argued on Sept. 25 that developers carry agents' harm",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://arizonadigitalfreepress.com/ftc-chair-suggests-ai-developers-should-be-liable-for-conduct-of-agents/",
      "source_publisher": "Arizona Digital Free Press (Reuters)",
      "source_title": "FTC chair suggests AI developers should be liable for conduct of agents",
      "source_date": "2026-09-29",
      "source_url": "https://arizonadigitalfreepress.com/ftc-chair-suggests-ai-developers-should-be-liable-for-conduct-of-agents/",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "ftc-rogue-agent-probe/record/4",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "In 2025 a 3-0 vote issued 7 chatbot orders on day one",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://www.ftc.gov/news-events/news/press-releases/2025/09/ftc-launches-inquiry-ai-chatbots-acting-companions",
      "source_publisher": "Federal Trade Commission",
      "source_title": "FTC Launches Inquiry into AI Chatbots Acting as Companions",
      "source_date": "2025-09-11",
      "source_url": "https://www.ftc.gov/news-events/news/press-releases/2025/09/ftc-launches-inquiry-ai-chatbots-acting-companions",
      "component": "governance",
      "confidence": "reported",
      "status": "On the record"
    },
    {
      "id": "ftc-rogue-agent-probe/record/5",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "Civil investigative demands, likely in the coming weeks",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://news.bloomberglaw.com/tech-and-telecom-law/ftc-probing-openai-and-anthropic-over-product-safety-concerns",
      "source_publisher": "Bloomberg Law",
      "source_title": "FTC Probing OpenAI, Anthropic Over Product Safety Concerns",
      "source_date": "2026-09-30",
      "source_url": "https://news.bloomberglaw.com/tech-and-telecom-law/ftc-probing-openai-and-anthropic-over-product-safety-concerns",
      "component": "governance",
      "confidence": "reported",
      "status": "Planned or open"
    },
    {
      "id": "ftc-rogue-agent-probe/record/6",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "Compelled testimony from executives at OpenAI, Anthropic and METR",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.theglobeandmail.com/business/article-ftc-opens-probe-into-openai-anthropic-and-other-ai-giants/",
      "source_publisher": "The Globe and Mail (Reuters)",
      "source_title": "FTC opens probe into OpenAI, Anthropic and other AI giants",
      "source_date": "2026-09-30",
      "source_url": "https://www.theglobeandmail.com/business/article-ftc-opens-probe-into-openai-anthropic-and-other-ai-giants/",
      "component": "governance",
      "confidence": "reported",
      "status": "Planned or open"
    },
    {
      "id": "ftc-rogue-agent-probe/record/7",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "Any finding of a violation, or a penalty",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://news.bloomberglaw.com/tech-and-telecom-law/ftc-probing-openai-and-anthropic-over-product-safety-concerns",
      "source_publisher": "Bloomberg Law",
      "source_title": "FTC Probing OpenAI, Anthropic Over Product Safety Concerns",
      "source_date": "2026-09-30",
      "source_url": "https://news.bloomberglaw.com/tech-and-telecom-law/ftc-probing-openai-and-anthropic-over-product-safety-concerns",
      "component": "governance",
      "confidence": "reported",
      "status": "Planned or open"
    },
    {
      "id": "ftc-rogue-agent-probe/record/8",
      "graphic": "ftc-rogue-agent-probe/record",
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "claim",
      "label": "A binding accord; the one signed Sept. 29 stays voluntary",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://news.bloomberglaw.com/tech-and-telecom-law/ftc-probing-openai-and-anthropic-over-product-safety-concerns",
      "source_publisher": "Bloomberg Law",
      "source_title": "FTC Probing OpenAI, Anthropic Over Product Safety Concerns",
      "source_date": "2026-09-30",
      "source_url": "https://news.bloomberglaw.com/tech-and-telecom-law/ftc-probing-openai-and-anthropic-over-product-safety-concerns",
      "component": "governance",
      "confidence": "reported",
      "status": "Planned or open"
    },
    {
      "id": "google-deepmind-gemini-4-argon/index/1",
      "graphic": "google-deepmind-gemini-4-argon/index",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Claude Opus 5.5 (max effort)",
      "value": 58,
      "unit": "Artificial Analysis Intelligence Index score",
      "date": null,
      "source_id": "7",
      "source_urls": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "source_publisher": "Artificial Analysis",
      "source_title": "Claude Opus 5.5 takes the top spot on the Artificial Analysis Intelligence Index",
      "source_date": "2026-09-22",
      "source_url": "https://artificialanalysis.ai/articles/claude-opus-5-5",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/index/2",
      "graphic": "google-deepmind-gemini-4-argon/index",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Claude Sonnet 5.5",
      "value": 56,
      "unit": "Artificial Analysis Intelligence Index score",
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/google-gemini-4-argon-closes-the-gap-with-openai-and-anthropic-but-doesnt-take-a-clear-lead/",
      "source_publisher": "The Decoder",
      "source_title": "Google Gemini 4 Argon closes the gap with OpenAI and Anthropic but doesn't take a clear lead",
      "source_date": "2026-09-30",
      "source_url": "https://the-decoder.com/google-gemini-4-argon-closes-the-gap-with-openai-and-anthropic-but-doesnt-take-a-clear-lead/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/index/3",
      "graphic": "google-deepmind-gemini-4-argon/index",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Gemini 4 Argon (high reasoning)",
      "value": 53,
      "unit": "Artificial Analysis Intelligence Index score",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/index/4",
      "graphic": "google-deepmind-gemini-4-argon/index",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "GPT-6 Astra (max)",
      "value": 53,
      "unit": "Artificial Analysis Intelligence Index score",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/index/5",
      "graphic": "google-deepmind-gemini-4-argon/index",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "GPT-6.1 Sol (max)",
      "value": 52,
      "unit": "Artificial Analysis Intelligence Index score",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/index/6",
      "graphic": "google-deepmind-gemini-4-argon/index",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Gemini 3.1 Pro Preview (Google's previous model)",
      "value": 30,
      "unit": "Artificial Analysis Intelligence Index score",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/deepswe/1",
      "graphic": "google-deepmind-gemini-4-argon/deepswe",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Gemini 4 Argon",
      "value": 77.9,
      "unit": "percent of DeepSWE v1.1 tasks, Google's table",
      "date": null,
      "source_id": "1",
      "source_urls": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "source_publisher": "Google",
      "source_title": "Gemini 4 Argon: our next era of frontier intelligence",
      "source_date": "2026-09-30",
      "source_url": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/deepswe/2",
      "graphic": "google-deepmind-gemini-4-argon/deepswe",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Claude Opus 5.5 (in Google's table)",
      "value": 74.2,
      "unit": "percent of DeepSWE v1.1 tasks, Google's table",
      "date": null,
      "source_id": "5",
      "source_urls": "https://9to5google.com/2026/09/30/gemini-4-argon-announcement/",
      "source_publisher": "9to5Google",
      "source_title": "Google announces Gemini 4 Argon as its new frontier model",
      "source_date": "2026-09-30",
      "source_url": "https://9to5google.com/2026/09/30/gemini-4-argon-announcement/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/deepswe/3",
      "graphic": "google-deepmind-gemini-4-argon/deepswe",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "GPT-6 Astra (in Google's table)",
      "value": 74.1,
      "unit": "percent of DeepSWE v1.1 tasks, Google's table",
      "date": null,
      "source_id": "5",
      "source_urls": "https://9to5google.com/2026/09/30/gemini-4-argon-announcement/",
      "source_publisher": "9to5Google",
      "source_title": "Google announces Gemini 4 Argon as its new frontier model",
      "source_date": "2026-09-30",
      "source_url": "https://9to5google.com/2026/09/30/gemini-4-argon-announcement/",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/sides/1",
      "graphic": "google-deepmind-gemini-4-argon/sides",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "position",
      "label": "Koray Kavukcuoglu: Argon sustains deep reasoning across long workflows and is already changing how Google works, freeing over 300 TiB of data-center memory.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "source_publisher": "Google",
      "source_title": "Gemini 4 Argon: our next era of frontier intelligence",
      "source_date": "2026-09-30",
      "source_url": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "component": "capability",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "google-deepmind-gemini-4-argon/sides/2",
      "graphic": "google-deepmind-gemini-4-argon/sides",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "position",
      "label": "Matthias Bastian: Argon puts Google back among the top three labs, though Anthropic likely still holds the lead, and the Vals ranking deserves a grain of salt.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://the-decoder.com/google-gemini-4-argon-closes-the-gap-with-openai-and-anthropic-but-doesnt-take-a-clear-lead/",
      "source_publisher": "The Decoder",
      "source_title": "Google Gemini 4 Argon closes the gap with OpenAI and Anthropic but doesn't take a clear lead",
      "source_date": "2026-09-30",
      "source_url": "https://the-decoder.com/google-gemini-4-argon-closes-the-gap-with-openai-and-anthropic-but-doesnt-take-a-clear-lead/",
      "component": "capability",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "google-deepmind-gemini-4-argon/tokens/1",
      "graphic": "google-deepmind-gemini-4-argon/tokens",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "Gemini 4 Argon (high reasoning)",
      "value": 62,
      "unit": "thousand output tokens per index task",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/tokens/2",
      "graphic": "google-deepmind-gemini-4-argon/tokens",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "measure",
      "label": "GPT-6 Astra (max)",
      "value": 27,
      "unit": "thousand output tokens per index task",
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/1",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "Intelligence Index score of 53, tied with GPT-6 Astra",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured by Artificial Analysis"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/2",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "About 62,000 output tokens per index task",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured by Artificial Analysis"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/3",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "Hallucination rate of 15 percent on AA-Omniscience",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured by Artificial Analysis"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/4",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "Terminal Bench 4 at 57 percent, behind Opus 5.5 at 60",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "source_publisher": "Artificial Analysis",
      "source_title": "Gemini 4 Argon: Google is back as one of the top three labs in intelligence achieved",
      "source_date": "2026-09-30",
      "source_url": "https://artificialanalysis.ai/articles/gemini-4-argon-google-top-three-labs",
      "component": "capability",
      "confidence": "reported",
      "status": "Measured by Artificial Analysis"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/5",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "DeepSWE v1.1 at 77.9 percent",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "source_publisher": "Google",
      "source_title": "Gemini 4 Argon: our next era of frontier intelligence",
      "source_date": "2026-09-30",
      "source_url": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "component": "capability",
      "confidence": "reported",
      "status": "On Google's page alone"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/6",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "CWE-bench v1 at 68 percent, tied for first",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "source_publisher": "Google",
      "source_title": "Gemini 4 Argon: our next era of frontier intelligence",
      "source_date": "2026-09-30",
      "source_url": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "component": "capability",
      "confidence": "reported",
      "status": "On Google's page alone"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/7",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "Critical healthcare-software flaw found through Wiz's Scan for Good",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "source_publisher": "Google",
      "source_title": "Gemini 4 Argon: our next era of frontier intelligence",
      "source_date": "2026-09-30",
      "source_url": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "component": "capability",
      "confidence": "reported",
      "status": "On Google's page alone"
    },
    {
      "id": "google-deepmind-gemini-4-argon/record/8",
      "graphic": "google-deepmind-gemini-4-argon/record",
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "claim",
      "label": "Over 300 TiB of data-center memory freed by Argon agents",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "source_publisher": "Google",
      "source_title": "Gemini 4 Argon: our next era of frontier intelligence",
      "source_date": "2026-09-30",
      "source_url": "https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-4-argon/",
      "component": "capability",
      "confidence": "reported",
      "status": "On Google's page alone"
    },
    {
      "id": "metr-senate-testimony/trail/1",
      "graphic": "metr-senate-testimony/trail",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "event",
      "label": "OpenAI discloses that its test agents compromised Hugging Face",
      "value": null,
      "unit": null,
      "date": "2026-07-21",
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "source_publisher": "METR",
      "source_title": "Chris Painter's testimony to the U.S. Senate on AI agent incidents",
      "source_date": "2026-09-30",
      "source_url": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/trail/2",
      "graphic": "metr-senate-testimony/trail",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "event",
      "label": "METR publishes its investigation of the Hugging Face incident",
      "value": null,
      "unit": null,
      "date": "2026-08-26",
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "source_publisher": "METR",
      "source_title": "Chris Painter's testimony to the U.S. Senate on AI agent incidents",
      "source_date": "2026-09-30",
      "source_url": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/trail/3",
      "graphic": "metr-senate-testimony/trail",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "event",
      "label": "OpenAI reports 3.1 agent-workdays per human workday",
      "value": null,
      "unit": null,
      "date": "2026-09-06",
      "source_id": "4;11",
      "source_urls": "https://openai.com/index/research-acceleration-view-inside-openai/ https://officechai.com/ai/openai-says-it-has-reached-its-goal-of-having-an-automated-ai-research-intern-by-september/",
      "source_publisher": "OpenAI",
      "source_title": "Research acceleration: The view inside OpenAI",
      "source_date": "2026-09-06",
      "source_url": "https://openai.com/index/research-acceleration-view-inside-openai/",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/trail/4",
      "graphic": "metr-senate-testimony/trail",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "event",
      "label": "Anthropic reports Claude leads 26 percent of its AI R&D",
      "value": null,
      "unit": null,
      "date": "2026-09-17",
      "source_id": "3;10",
      "source_urls": "https://www.anthropic.com/institute/measuring-pace-of-ai-development https://www.unite.ai/anthropic-says-claude-leads-26-of-its-ai-research-and-development/",
      "source_publisher": "Anthropic",
      "source_title": "Measurements for understanding the pace of AI development inside frontier labs",
      "source_date": "2026-09-17",
      "source_url": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/trail/5",
      "graphic": "metr-senate-testimony/trail",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "event",
      "label": "Painter testifies to Hawley's subcommittee and cites both figures",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "1;2",
      "source_urls": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/ https://www.hsgac.senate.gov/subcommittees/dmdcc/hearings/rogue-ai-securing-the-homeland-against-ai-agent-attacks/",
      "source_publisher": "METR",
      "source_title": "Chris Painter's testimony to the U.S. Senate on AI agent incidents",
      "source_date": "2026-09-30",
      "source_url": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/share/1",
      "graphic": "metr-senate-testimony/share",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "measure",
      "label": "Share of Anthropic's AI R&D work Claude leads, August 2026, by Anthropic's measurement",
      "value": 26,
      "unit": "percent",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "source_publisher": "Anthropic",
      "source_title": "Measurements for understanding the pace of AI development inside frontier labs",
      "source_date": "2026-09-17",
      "source_url": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/judge/1",
      "graphic": "metr-senate-testimony/judge",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "measure",
      "label": "Claude judge and staff (exact level)",
      "value": 59,
      "unit": "percent agreement",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "source_publisher": "Anthropic",
      "source_title": "Measurements for understanding the pace of AI development inside frontier labs",
      "source_date": "2026-09-17",
      "source_url": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/judge/2",
      "graphic": "metr-senate-testimony/judge",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "measure",
      "label": "Staff and staff (exact level)",
      "value": 35,
      "unit": "percent agreement",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "source_publisher": "Anthropic",
      "source_title": "Measurements for understanding the pace of AI development inside frontier labs",
      "source_date": "2026-09-17",
      "source_url": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/judge/3",
      "graphic": "metr-senate-testimony/judge",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "measure",
      "label": "Claude judge and staff (within one level)",
      "value": 97,
      "unit": "percent agreement",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "source_publisher": "Anthropic",
      "source_title": "Measurements for understanding the pace of AI development inside frontier labs",
      "source_date": "2026-09-17",
      "source_url": "https://www.anthropic.com/institute/measuring-pace-of-ai-development",
      "component": "autonomy",
      "confidence": "reported"
    },
    {
      "id": "metr-senate-testimony/sides/1",
      "graphic": "metr-senate-testimony/sides",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "position",
      "label": "Chris Painter: The capabilities of AI agents, and the work they carry out inside the labs, advanced much further over 2026, citing Anthropic's 26 percent and OpenAI's 3.1.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "source_publisher": "METR",
      "source_title": "Chris Painter's testimony to the U.S. Senate on AI agent incidents",
      "source_date": "2026-09-30",
      "source_url": "https://metr.org/blog/2026-09-30-chris-painter-senate-testimony/",
      "component": "autonomy",
      "confidence": "reported",
      "side": "for"
    },
    {
      "id": "metr-senate-testimony/sides/2",
      "graphic": "metr-senate-testimony/sides",
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "position",
      "label": "Tomasz Tunguz: OpenAI's ratio is one engineer supervising three shifts of machine runtime, and over half of successful long tasks still needed a human intervention.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://tomtunguz.com/openai-research-acceleration-agentic-productivity/",
      "source_publisher": "Tomasz Tunguz",
      "source_title": "Is the 3x AI Productivity Gain just a Computer that Never Sleeps?",
      "source_date": "2026-09-08",
      "source_url": "https://tomtunguz.com/openai-research-acceleration-agentic-productivity/",
      "component": "autonomy",
      "confidence": "reported",
      "side": "against"
    },
    {
      "id": "micron-hbm-record-quarter/revenue/1",
      "graphic": "micron-hbm-record-quarter/revenue",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Q4 fiscal 2025 (reported)",
      "value": 11.32,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/revenue/2",
      "graphic": "micron-hbm-record-quarter/revenue",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Q4 fiscal 2026 (reported)",
      "value": 54.23,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/revenue/3",
      "graphic": "micron-hbm-record-quarter/revenue",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Q1 fiscal 2027 (Micron's guidance)",
      "value": 61.5,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/units/1",
      "graphic": "micron-hbm-record-quarter/units",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Core Data Center",
      "value": 18,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/units/2",
      "graphic": "micron-hbm-record-quarter/units",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Cloud Memory (includes HBM)",
      "value": 16.28,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1;6",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm https://www.sec.gov/Archives/edgar/data/723125/000072312525000028/mu-20250828.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/units/3",
      "graphic": "micron-hbm-record-quarter/units",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Mobile and Client",
      "value": 13.11,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/units/4",
      "graphic": "micron-hbm-record-quarter/units",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "measure",
      "label": "Automotive and Embedded",
      "value": 6.82,
      "unit": "billion dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "micron-hbm-record-quarter/checked/1",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "$54.23 billion in fiscal fourth-quarter revenue",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "In the SEC filing"
    },
    {
      "id": "micron-hbm-record-quarter/checked/2",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Cloud Memory unit at $16.28 billion",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "In the SEC filing"
    },
    {
      "id": "micron-hbm-record-quarter/checked/3",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Quarterly capex of $10.77 billion",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Reports Record Fiscal Fourth-Quarter and Full-Year 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-09-30",
      "source_url": "https://www.sec.gov/Archives/edgar/data/0000723125/000072312526000018/a2026q4ex991-pressrelease.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "In the SEC filing"
    },
    {
      "id": "micron-hbm-record-quarter/checked/4",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Top ten customers bought over half of fiscal 2025 revenue",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/723125/000072312525000028/mu-20250828.htm",
      "source_publisher": "Micron Technology (SEC filing)",
      "source_title": "Micron Technology, Inc. Form 10-K for the fiscal year ended Aug. 28, 2025",
      "source_date": "2025-10-03",
      "source_url": "https://www.sec.gov/Archives/edgar/data/723125/000072312525000028/mu-20250828.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "In the SEC filing"
    },
    {
      "id": "micron-hbm-record-quarter/checked/5",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Vast majority of 2027 HBM bit supply under agreement",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.investing.com/news/transcripts/earnings-call-transcript-micron-tops-q4-2026-estimates-as-demand-stays-hot-93CH-4925992",
      "source_publisher": "Investing.com",
      "source_title": "Earnings call transcript: Micron tops Q4 2026 estimates as demand stays hot",
      "source_date": "2026-09-30",
      "source_url": "https://www.investing.com/news/transcripts/earnings-call-transcript-micron-tops-q4-2026-estimates-as-demand-stays-hot-93CH-4925992",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Said on the call or forecast"
    },
    {
      "id": "micron-hbm-record-quarter/checked/6",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Growth led nearly entirely by pricing, says Morningstar",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "source_publisher": "Morningstar",
      "source_title": "Micron Earnings: Beware Attempting to Time the Peak",
      "source_date": "2026-10-01",
      "source_url": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Said on the call or forecast"
    },
    {
      "id": "micron-hbm-record-quarter/checked/7",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Memory peak in early 2028, by Morningstar's forecast",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "source_publisher": "Morningstar",
      "source_title": "Micron Earnings: Beware Attempting to Time the Peak",
      "source_date": "2026-10-01",
      "source_url": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Said on the call or forecast"
    },
    {
      "id": "micron-hbm-record-quarter/checked/8",
      "graphic": "micron-hbm-record-quarter/checked",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "claim",
      "label": "Memory supply doubling by 2028, by Morningstar's forecast",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "source_publisher": "Morningstar",
      "source_title": "Micron Earnings: Beware Attempting to Time the Peak",
      "source_date": "2026-10-01",
      "source_url": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Said on the call or forecast"
    },
    {
      "id": "micron-hbm-record-quarter/sides/1",
      "graphic": "micron-hbm-record-quarter/sides",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "position",
      "label": "Sanjay Mehrotra: Micron has agreements for the vast majority of its 2027 HBM bits and sees supply tight through 2028.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.investing.com/news/transcripts/earnings-call-transcript-micron-tops-q4-2026-estimates-as-demand-stays-hot-93CH-4925992",
      "source_publisher": "Investing.com",
      "source_title": "Earnings call transcript: Micron tops Q4 2026 estimates as demand stays hot",
      "source_date": "2026-09-30",
      "source_url": "https://www.investing.com/news/transcripts/earnings-call-transcript-micron-tops-q4-2026-estimates-as-demand-stays-hot-93CH-4925992",
      "component": "compute",
      "confidence": "confirmed",
      "side": "for"
    },
    {
      "id": "micron-hbm-record-quarter/sides/2",
      "graphic": "micron-hbm-record-quarter/sides",
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "position",
      "label": "William Kerwin: Price drove nearly all the growth, and memory supply doubling by 2028 should bring a steep fall in prices.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "source_publisher": "Morningstar",
      "source_title": "Micron Earnings: Beware Attempting to Time the Peak",
      "source_date": "2026-10-01",
      "source_url": "https://www.morningstar.com/stocks/micron-earnings-beware-attempting-time-peak",
      "component": "compute",
      "confidence": "confirmed",
      "side": "against"
    },
    {
      "id": "senate-permitting-bill-data-centers/who-pays/1",
      "graphic": "senate-permitting-bill-data-centers/who-pays",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "event",
      "label": "FERC issues the transmission pricing policy statement the bill rewrites",
      "value": null,
      "unit": null,
      "date": "1994-10-26",
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/who-pays/2",
      "graphic": "senate-permitting-bill-data-centers/who-pays",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "event",
      "label": "House passes the Ratepayer Protection Act 417 to 3",
      "value": null,
      "unit": null,
      "date": "2026-09-16",
      "source_id": "9",
      "source_urls": "https://www.utilitydive.com/news/house-passes-ratepayer-protection-bill-data-centers/830658/",
      "source_publisher": "Utility Dive",
      "source_title": "House passes ratepayer protection bill to limit data center cost shifts",
      "source_date": "2026-09-17",
      "source_url": "https://www.utilitydive.com/news/house-passes-ratepayer-protection-bill-data-centers/830658/",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/who-pays/3",
      "graphic": "senate-permitting-bill-data-centers/who-pays",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "event",
      "label": "Four senators file the 417-page Bipartisan American Affordability and Jobs Act",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "1;4",
      "source_urls": "https://www.epw.senate.gov/public/index.cfm/press-releases-republican?ID=D3555B5D-34C2-4D95-B99B-5B460BB9895D https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Capito, Lee, Whitehouse, and Heinrich Introduce Bipartisan American Affordability and Jobs Act of 2026",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/index.cfm/press-releases-republican?ID=D3555B5D-34C2-4D95-B99B-5B460BB9895D",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/who-pays/4",
      "graphic": "senate-permitting-bill-data-centers/who-pays",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "event",
      "label": "Senate blocks the House bill 57 to 43, three votes short",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "5",
      "source_urls": "https://newsweek.com/ai-data-center-bill-democrats-voting-republicans-list-12509123",
      "source_publisher": "Newsweek",
      "source_title": "Full List of Democrats Opposing Bill to Lower Data Center Electricity Costs",
      "source_date": "2026-09-30",
      "source_url": "https://newsweek.com/ai-data-center-bill-democrats-voting-republicans-list-12509123",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/1",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "Covered loads start at 20 megawatts, counted at full buildout",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred",
      "status": "In the bill text"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/2",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "All incremental cost assigned to the covered load",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred",
      "status": "In the bill text"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/3",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "Exit payments continue until the utility recovers its cost",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred",
      "status": "In the bill text"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/4",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "FERC backstop siting widened for major interstate lines",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.latitudemedia.com/news/senators-strike-bipartisan-permitting-deal/",
      "source_publisher": "Latitude Media",
      "source_title": "Senators strike bipartisan permitting deal",
      "source_date": "2026-09-30",
      "source_url": "https://www.latitudemedia.com/news/senators-strike-bipartisan-permitting-deal/",
      "component": "governance",
      "confidence": "inferred",
      "status": "In the bill text"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/5",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "Court challenges filed within 150 days of approval",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.washingtonsun.com/congress/senators-release-bipartisan-american-affordability-and-jobs-act-permitting-reform",
      "source_publisher": "The Washington Sun",
      "source_title": "Senators Have a Bipartisan Permitting Reform Deal but Little Time to Pass It",
      "source_date": "2026-09-30",
      "source_url": "https://www.washingtonsun.com/congress/senators-release-bipartisan-american-affordability-and-jobs-act-permitting-reform",
      "component": "governance",
      "confidence": "inferred",
      "status": "In the bill text"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/6",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "Senate vote set for after the November midterms",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.pbs.org/newshour/politics/senate-reaches-bipartisan-deal-on-permitting-bill-to-speed-approvals-of-new-energy-projects",
      "source_publisher": "PBS News",
      "source_title": "Senate reaches bipartisan deal on permitting bill to speed approvals of new energy projects",
      "source_date": "2026-09-30",
      "source_url": "https://www.pbs.org/newshour/politics/senate-reaches-bipartisan-deal-on-permitting-bill-to-speed-approvals-of-new-energy-projects",
      "component": "governance",
      "confidence": "inferred",
      "status": "Open or claimed"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/7",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "Edison Electric Institute still reviewing the transmission provisions",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "6",
      "source_urls": "https://www.latitudemedia.com/news/senators-strike-bipartisan-permitting-deal/",
      "source_publisher": "Latitude Media",
      "source_title": "Senators strike bipartisan permitting deal",
      "source_date": "2026-09-30",
      "source_url": "https://www.latitudemedia.com/news/senators-strike-bipartisan-permitting-deal/",
      "component": "governance",
      "confidence": "inferred",
      "status": "Open or claimed"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/8",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "Wind and solar permitting terms called unresolved by Whitehouse",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.pbs.org/newshour/politics/senate-reaches-bipartisan-deal-on-permitting-bill-to-speed-approvals-of-new-energy-projects",
      "source_publisher": "PBS News",
      "source_title": "Senate reaches bipartisan deal on permitting bill to speed approvals of new energy projects",
      "source_date": "2026-09-30",
      "source_url": "https://www.pbs.org/newshour/politics/senate-reaches-bipartisan-deal-on-permitting-bill-to-speed-approvals-of-new-energy-projects",
      "component": "governance",
      "confidence": "inferred",
      "status": "Open or claimed"
    },
    {
      "id": "senate-permitting-bill-data-centers/text-and-open/9",
      "graphic": "senate-permitting-bill-data-centers/text-and-open",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "claim",
      "label": "House passage and a presidential signature",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://www.washingtonsun.com/congress/senators-release-bipartisan-american-affordability-and-jobs-act-permitting-reform",
      "source_publisher": "The Washington Sun",
      "source_title": "Senators Have a Bipartisan Permitting Reform Deal but Little Time to Pass It",
      "source_date": "2026-09-30",
      "source_url": "https://www.washingtonsun.com/congress/senators-release-bipartisan-american-affordability-and-jobs-act-permitting-reform",
      "component": "governance",
      "confidence": "inferred",
      "status": "Open or claimed"
    },
    {
      "id": "senate-permitting-bill-data-centers/clock/1",
      "graphic": "senate-permitting-bill-data-centers/clock",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "measure",
      "label": "Revise 1994 policy (from enactment)",
      "value": 270,
      "unit": "days",
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/clock/2",
      "graphic": "senate-permitting-bill-data-centers/clock",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "measure",
      "label": "Propose a rule (after the revision)",
      "value": 270,
      "unit": "days",
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/clock/3",
      "graphic": "senate-permitting-bill-data-centers/clock",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "measure",
      "label": "Final rule (one year after the proposal)",
      "value": 365,
      "unit": "days",
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Bipartisan American Affordability and Jobs Act of 2026 (bill text)",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf",
      "component": "governance",
      "confidence": "inferred"
    },
    {
      "id": "senate-permitting-bill-data-centers/sides/1",
      "graphic": "senate-permitting-bill-data-centers/sides",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "position",
      "label": "Martin Heinrich: The bill ensures data centers pay their fair share of the grid upgrades they require, and puts teeth behind that principle.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.epw.senate.gov/public/index.cfm/press-releases-republican?ID=D3555B5D-34C2-4D95-B99B-5B460BB9895D",
      "source_publisher": "U.S. Senate Committee on Environment and Public Works",
      "source_title": "Capito, Lee, Whitehouse, and Heinrich Introduce Bipartisan American Affordability and Jobs Act of 2026",
      "source_date": "2026-09-30",
      "source_url": "https://www.epw.senate.gov/public/index.cfm/press-releases-republican?ID=D3555B5D-34C2-4D95-B99B-5B460BB9895D",
      "component": "governance",
      "confidence": "inferred",
      "side": "for"
    },
    {
      "id": "senate-permitting-bill-data-centers/sides/2",
      "graphic": "senate-permitting-bill-data-centers/sides",
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "position",
      "label": "Brad Campbell: Striking the deal in the waning days of this Congress, on a schedule that precludes public input or amendment, is indefensible.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.pbs.org/newshour/politics/senate-reaches-bipartisan-deal-on-permitting-bill-to-speed-approvals-of-new-energy-projects",
      "source_publisher": "PBS News",
      "source_title": "Senate reaches bipartisan deal on permitting bill to speed approvals of new energy projects",
      "source_date": "2026-09-30",
      "source_url": "https://www.pbs.org/newshour/politics/senate-reaches-bipartisan-deal-on-permitting-bill-to-speed-approvals-of-new-energy-projects",
      "component": "governance",
      "confidence": "inferred",
      "side": "against"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/1",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "Hugging Face discloses the intrusion by OpenAI's test models",
      "value": null,
      "unit": null,
      "date": "2026-07-16",
      "source_id": "4",
      "source_urls": "https://decrypt.co/379998/california-subpoena-openai-ai-models-hack",
      "source_publisher": "Decrypt",
      "source_title": "California Subpoenas OpenAI Over AI Models That Hacked Their Way Out of a Test",
      "source_date": "2026-10-02",
      "source_url": "https://decrypt.co/379998/california-subpoena-openai-ai-models-hack",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/2",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "Iowa's Brenna Bird leads 15 states demanding OpenAI preserve its records",
      "value": null,
      "unit": null,
      "date": "2026-08-03",
      "source_id": "9",
      "source_urls": "https://thenextweb.com/news/openai-15-attorneys-general-preserve-evidence-hugging-face-hack",
      "source_publisher": "The Next Web",
      "source_title": "15 states put OpenAI on notice over the Hugging Face hack",
      "source_date": "2026-08-04",
      "source_url": "https://thenextweb.com/news/openai-15-attorneys-general-preserve-evidence-hugging-face-hack",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/3",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "Alabama's Steve Marshall serves the first state subpoena",
      "value": null,
      "unit": null,
      "date": "2026-08-24",
      "source_id": "8",
      "source_urls": "https://thehill.com/policy/technology/6047157-alabama-openai-hugging-face-hack/",
      "source_publisher": "The Hill",
      "source_title": "Alabama attorney general subpoenas OpenAI over Hugging Face incident",
      "source_date": "2026-08-24",
      "source_url": "https://thehill.com/policy/technology/6047157-alabama-openai-hugging-face-hack/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/4",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "Bonta joins 25 attorneys general asking Congress to regulate frontier AI",
      "value": null,
      "unit": null,
      "date": "2026-09-24",
      "source_id": "5",
      "source_urls": "https://oag.ca.gov/news/press-releases/attorney-general-bonta-congress-must-act-urgently-protect-against-catastrophic",
      "source_publisher": "California Department of Justice",
      "source_title": "Attorney General Bonta: Congress Must Act Urgently to Protect Against Catastrophic AI Threats",
      "source_date": "2026-09-24",
      "source_url": "https://oag.ca.gov/news/press-releases/attorney-general-bonta-congress-must-act-urgently-protect-against-catastrophic",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/5",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "Florida asks a court to halt OpenAI's new models pending outside safeguards",
      "value": null,
      "unit": null,
      "date": "2026-09-28",
      "source_id": "10",
      "source_urls": "https://siliconangle.com/2026/09/28/florida-attorney-general-asks-state-court-to-prevent-openai-from-advancing-its-frontier-models/",
      "source_publisher": "SiliconANGLE",
      "source_title": "Florida AG asks court to prevent OpenAI from advancing its frontier models, as company scraps new one",
      "source_date": "2026-09-28",
      "source_url": "https://siliconangle.com/2026/09/28/florida-attorney-general-asks-state-court-to-prevent-openai-from-advancing-its-frontier-models/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/6",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "California serves its subpoena; an FTC official confirms the federal probe",
      "value": null,
      "unit": null,
      "date": "2026-09-30",
      "source_id": "2;4",
      "source_urls": "https://kfgo.com/2026/10/01/california-attorney-general-issues-investigative-subpoena-to-openai/ https://decrypt.co/379998/california-subpoena-openai-ai-models-hack",
      "source_publisher": "KFGO (Reuters)",
      "source_title": "California AG Bonta issues subpoena to OpenAI over AI cybersecurity risks",
      "source_date": "2026-10-01",
      "source_url": "https://kfgo.com/2026/10/01/california-attorney-general-issues-investigative-subpoena-to-openai/",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/ladder/7",
      "graphic": "openai-california-ag-subpoena/ladder",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "event",
      "label": "Bonta announces the subpoena, covering testing and released models",
      "value": null,
      "unit": null,
      "date": "2026-10-01",
      "source_id": "1",
      "source_urls": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "source_publisher": "California Department of Justice",
      "source_title": "As Part of Ongoing Investigation, Attorney General Bonta Serves Investigative Subpoena on OpenAI",
      "source_date": "2026-10-01",
      "source_url": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "component": "governance",
      "confidence": "confirmed"
    },
    {
      "id": "openai-california-ag-subpoena/record/1",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Bonta's office served the subpoena on Sept. 30 and announced it Oct. 1",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "source_publisher": "California Department of Justice",
      "source_title": "As Part of Ongoing Investigation, Attorney General Bonta Serves Investigative Subpoena on OpenAI",
      "source_date": "2026-10-01",
      "source_url": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "component": "governance",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "openai-california-ag-subpoena/record/2",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Its scope covers testing, development and models placed into service",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "source_publisher": "California Department of Justice",
      "source_title": "As Part of Ongoing Investigation, Attorney General Bonta Serves Investigative Subpoena on OpenAI",
      "source_date": "2026-10-01",
      "source_url": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "component": "governance",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "openai-california-ag-subpoena/record/3",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Alabama served its own subpoena on the Hugging Face breach Aug. 24",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://thehill.com/policy/technology/6047157-alabama-openai-hugging-face-hack/",
      "source_publisher": "The Hill",
      "source_title": "Alabama attorney general subpoenas OpenAI over Hugging Face incident",
      "source_date": "2026-08-24",
      "source_url": "https://thehill.com/policy/technology/6047157-alabama-openai-hugging-face-hack/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "openai-california-ag-subpoena/record/4",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "A 2025 agreement keeps OpenAI headquartered in California, with quarterly meetings",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://oag.ca.gov/system/files/attachments/press-docs/Final%20Executed%20MOU%20Between%20OpenAI%20and%20California%20AG%20re%20Notice%20of%20Conditions%20of%20Non-Objection%20%2810.27.2025%29%20%28Signed%20by%20OpenAI%29%20%28Signed%20by%20CA%20DOJ%29.pdf",
      "source_publisher": "California Department of Justice",
      "source_title": "Memorandum of Understanding between OpenAI, Inc. and the Attorney General of California",
      "source_date": "2025-10-27",
      "source_url": "https://oag.ca.gov/system/files/attachments/press-docs/Final%20Executed%20MOU%20Between%20OpenAI%20and%20California%20AG%20re%20Notice%20of%20Conditions%20of%20Non-Objection%20%2810.27.2025%29%20%28Signed%20by%20OpenAI%29%20%28Signed%20by%20CA%20DOJ%29.pdf",
      "component": "governance",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "openai-california-ag-subpoena/record/5",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "OpenAI says it strengthened safeguards and published its findings",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://thehill.com/policy/technology/6124245-openai-subpoena-rob-bonta-california/",
      "source_publisher": "The Hill",
      "source_title": "California attorney general subpoenas OpenAI over cyber incidents",
      "source_date": "2026-10-01",
      "source_url": "https://thehill.com/policy/technology/6124245-openai-subpoena-rob-bonta-california/",
      "component": "governance",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "openai-california-ag-subpoena/record/6",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "What the subpoena asks OpenAI to produce",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://decrypt.co/379998/california-subpoena-openai-ai-models-hack",
      "source_publisher": "Decrypt",
      "source_title": "California Subpoenas OpenAI Over AI Models That Hacked Their Way Out of a Test",
      "source_date": "2026-10-02",
      "source_url": "https://decrypt.co/379998/california-subpoena-openai-ai-models-hack",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Private or open"
    },
    {
      "id": "openai-california-ag-subpoena/record/7",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "The deadline for OpenAI's answer",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "source_publisher": "California Department of Justice",
      "source_title": "As Part of Ongoing Investigation, Attorney General Bonta Serves Investigative Subpoena on OpenAI",
      "source_date": "2026-10-01",
      "source_url": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Private or open"
    },
    {
      "id": "openai-california-ag-subpoena/record/8",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Any finding that OpenAI broke California law",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "source_publisher": "California Department of Justice",
      "source_title": "As Part of Ongoing Investigation, Attorney General Bonta Serves Investigative Subpoena on OpenAI",
      "source_date": "2026-10-01",
      "source_url": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Private or open"
    },
    {
      "id": "openai-california-ag-subpoena/record/9",
      "graphic": "openai-california-ag-subpoena/record",
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "claim",
      "label": "Any lawsuit or penalty that follows",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "source_publisher": "California Department of Justice",
      "source_title": "As Part of Ongoing Investigation, Attorney General Bonta Serves Investigative Subpoena on OpenAI",
      "source_date": "2026-10-01",
      "source_url": "https://oag.ca.gov/news/press-releases/part-ongoing-investigation-attorney-general-bonta-serves-investigative-subpoena",
      "component": "governance",
      "confidence": "confirmed",
      "status": "Private or open"
    },
    {
      "id": "spacex-super-intelligence-company/history/1",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "SpaceX is incorporated",
      "value": null,
      "unit": null,
      "date": "2002-03-14",
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/2",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "Falcon 1 reaches orbit on its fourth flight",
      "value": null,
      "unit": null,
      "date": "2008-09-28",
      "source_id": "12;1",
      "source_urls": "https://www.satellitetoday.com/connectivity/2008/09/29/spacex-successful-in-fourth-falcon-1-mission/ https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "Via Satellite",
      "source_title": "SpaceX Successful in Fourth Falcon 1 Mission",
      "source_date": "2008-09-29",
      "source_url": "https://www.satellitetoday.com/connectivity/2008/09/29/spacex-successful-in-fourth-falcon-1-mission/",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/3",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "Dragon becomes the first commercial vehicle at the space station",
      "value": null,
      "unit": null,
      "date": "2012-05-25",
      "source_id": "13",
      "source_urls": "https://www.planetary.org/articles/dragon-makes-history-berths",
      "source_publisher": "The Planetary Society",
      "source_title": "Dragon makes history, berths with International Space Station",
      "source_date": "2012-05-25",
      "source_url": "https://www.planetary.org/articles/dragon-makes-history-berths",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/4",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "Crew Dragon launches NASA astronauts Behnken and Hurley",
      "value": null,
      "unit": null,
      "date": "2020-05-30",
      "source_id": "14",
      "source_urls": "https://www.nasa.gov/news-release/nasa-astronauts-launch-from-america-in-historic-test-flight-of-spacex-crew-dragon/",
      "source_publisher": "NASA",
      "source_title": "NASA Astronauts Launch from America in Historic Test Flight of SpaceX Crew Dragon",
      "source_date": "2020-05-30",
      "source_url": "https://www.nasa.gov/news-release/nasa-astronauts-launch-from-america-in-historic-test-flight-of-spacex-crew-dragon/",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/5",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "SpaceX acquires xAI, with Grok, X and the Colossus data centers",
      "value": null,
      "unit": null,
      "date": "2026-02-02",
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/6",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "SPCX opens on Nasdaq and closes its first day at $160.95",
      "value": null,
      "unit": null,
      "date": "2026-06-12",
      "source_id": "4",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/7",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "Installed AI compute reaches 1.4 gigawatts of nameplate draw",
      "value": null,
      "unit": null,
      "date": "2026-06-30",
      "source_id": "2",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Form 10-Q, Quarterly Report for the Period Ended June 30, 2026",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/8",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "Trump orders agencies to say Super Intelligence",
      "value": null,
      "unit": null,
      "date": "2026-09-29",
      "source_id": "7",
      "source_urls": "https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "source_publisher": "The White House",
      "source_title": "Inaugurating the Era of Super Intelligence (Executive Order 14434)",
      "source_date": "2026-09-29",
      "source_url": "https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/history/9",
      "graphic": "spacex-super-intelligence-company/history",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "event",
      "label": "Musk posts that SpaceX is a super intelligence company",
      "value": null,
      "unit": null,
      "date": "2026-10-04",
      "source_id": "5;6",
      "source_urls": "https://www.teslarati.com/elon-musk-follows-trumps-lead-says-a-spacex-name-change-is-coming/ https://tech.yahoo.com/ai/articles/musk-says-spacexai-rebrand-spacexsi-145406410.html",
      "source_publisher": "Teslarati",
      "source_title": "Elon Musk follows Trump's lead, says a SpaceX name change is coming",
      "source_date": "2026-10-04",
      "source_url": "https://www.teslarati.com/elon-musk-follows-trumps-lead-says-a-spacex-name-change-is-coming/",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/subscribers/1",
      "graphic": "spacex-super-intelligence-company/subscribers",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2023 (Dec. 31)",
      "value": 2.3,
      "unit": "million Starlink subscribers",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/subscribers/2",
      "graphic": "spacex-super-intelligence-company/subscribers",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2024 (Dec. 31)",
      "value": 4.4,
      "unit": "million Starlink subscribers",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/subscribers/3",
      "graphic": "spacex-super-intelligence-company/subscribers",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2025 (Dec. 31)",
      "value": 8.9,
      "unit": "million Starlink subscribers",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/subscribers/4",
      "graphic": "spacex-super-intelligence-company/subscribers",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2026 (Mar. 31)",
      "value": 10.3,
      "unit": "million Starlink subscribers",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/subscribers/5",
      "graphic": "spacex-super-intelligence-company/subscribers",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2026 (June 30)",
      "value": 12,
      "unit": "million Starlink subscribers",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/1",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "IPO offer price (reference)",
      "value": 135,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/2",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "First close",
      "value": 160.95,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": "2026-06-12",
      "source_id": "4",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/3",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Quarter ends",
      "value": 170.86,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": "2026-06-30",
      "source_id": "4",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/4",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "First close under the offer",
      "value": 131.11,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": "2026-07-16",
      "source_id": "4",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/5",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Lowest close, after earnings",
      "value": 108.27,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": "2026-08-05",
      "source_id": "4;11",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical https://finance.yahoo.com/markets/stocks/articles/spacex-q2-2026-earnings-revenue-205130498.html",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/6",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Day of Trump's order",
      "value": 149.24,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": "2026-09-29",
      "source_id": "4;7",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/share-price/7",
      "graphic": "spacex-super-intelligence-company/share-price",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Last close before the post",
      "value": 158.96,
      "unit": "US dollars per share, Nasdaq closing price",
      "date": "2026-10-02",
      "source_id": "4",
      "source_urls": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "source_publisher": "Nasdaq",
      "source_title": "SPCX Historical Data",
      "source_date": "2026-10-02",
      "source_url": "https://www.nasdaq.com/market-activity/stocks/spcx/historical",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/1",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Revenue: Space (launch)",
      "value": 4086,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/2",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Revenue: Connectivity (Starlink)",
      "value": 11387,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/3",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Revenue: AI (xAI, X, Colossus)",
      "value": 3201,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/4",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Revenue: Space (launch)",
      "value": 962,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/5",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Revenue: Connectivity (Starlink)",
      "value": 4291,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/6",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Revenue: AI (xAI, X, Colossus)",
      "value": 2561,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/7",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Capital spending: Space (launch)",
      "value": 3832,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/8",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Capital spending: Connectivity (Starlink)",
      "value": 4178,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/9",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Capital spending: AI (xAI, X, Colossus)",
      "value": 12727,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/10",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Capital spending: Space (launch)",
      "value": 1174,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/11",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Capital spending: Connectivity (Starlink)",
      "value": 1367,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/mix/12",
      "graphic": "spacex-super-intelligence-company/mix",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "Capital spending: AI (xAI, X, Colossus)",
      "value": 15828,
      "unit": "millions of US dollars",
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/compute/1",
      "graphic": "spacex-super-intelligence-company/compute",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2024 (Dec. 31)",
      "value": 0.3,
      "unit": "gigawatts of nameplate compute draw",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/compute/2",
      "graphic": "spacex-super-intelligence-company/compute",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2025 (June 30)",
      "value": 0.4,
      "unit": "gigawatts of nameplate compute draw",
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Form 10-Q, Quarterly Report for the Period Ended June 30, 2026",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/compute/3",
      "graphic": "spacex-super-intelligence-company/compute",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2025 (Dec. 31)",
      "value": 0.8,
      "unit": "gigawatts of nameplate compute draw",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/compute/4",
      "graphic": "spacex-super-intelligence-company/compute",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2026 (Mar. 31)",
      "value": 1,
      "unit": "gigawatts of nameplate compute draw",
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/compute/5",
      "graphic": "spacex-super-intelligence-company/compute",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "measure",
      "label": "2026 (June 30)",
      "value": 1.4,
      "unit": "gigawatts of nameplate compute draw",
      "date": null,
      "source_id": "2;3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Form 10-Q, Quarterly Report for the Period Ended June 30, 2026",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "component": "compute",
      "confidence": "confirmed"
    },
    {
      "id": "spacex-super-intelligence-company/record/1",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "1.4 gigawatts of GPUs installed at June 30, per the 10-Q",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Form 10-Q, Quarterly Report for the Period Ended June 30, 2026",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "spacex-super-intelligence-company/record/2",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "$85.7 billion of IPO equity and $25 billion of bonds, both closed",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2;3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Form 10-Q, Quarterly Report for the Period Ended June 30, 2026",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "spacex-super-intelligence-company/record/3",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "Anthropic pays $1.25 billion a month for about 325,000 GPUs",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "spacex-super-intelligence-company/record/4",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "AI took 86 percent of second-quarter capital spending",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "SpaceX Reports Second Quarter 2026 Results (Form 8-K, Exhibit 99.1)",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052515/earningsreleaseq22608042.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "On the record"
    },
    {
      "id": "spacex-super-intelligence-company/record/5",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "Measured power use stays unreported; nameplate counts chips installed",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Form 10-Q, Quarterly Report for the Period Ended June 30, 2026",
      "source_date": "2026-08-04",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026052535/spcx-20260630.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Claimed or open"
    },
    {
      "id": "spacex-super-intelligence-company/record/6",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "Orbital compute satellites as early as 2028, by SpaceX's account",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "source_publisher": "SpaceX (SEC EDGAR)",
      "source_title": "Prospectus, Form 424(b)(4): 555,555,555 Shares, Space Exploration Technologies Corp. Class A Common Stock",
      "source_date": "2026-06-12",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1181412/000162828026042639/spaceexplorationtechnologi.htm",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Claimed or open"
    },
    {
      "id": "spacex-super-intelligence-company/record/7",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "Grok's standing among frontier models, which Morningstar disputes",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8;10",
      "source_urls": "https://www.morningstar.com/stocks/why-we-think-spacex-ipo-is-overvalued https://finance.yahoo.com/markets/stocks/articles/morningstar-values-spacex-780-billion-125251916.html",
      "source_publisher": "Morningstar",
      "source_title": "Why We Think the SpaceX IPO Is Overvalued",
      "source_date": "2026-06-08",
      "source_url": "https://www.morningstar.com/stocks/why-we-think-spacex-ipo-is-overvalued",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Claimed or open"
    },
    {
      "id": "spacex-super-intelligence-company/record/8",
      "graphic": "spacex-super-intelligence-company/record",
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "claim",
      "label": "SpaceXSI, a rename promised on X with its timing left open",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5;6",
      "source_urls": "https://www.teslarati.com/elon-musk-follows-trumps-lead-says-a-spacex-name-change-is-coming/ https://tech.yahoo.com/ai/articles/musk-says-spacexai-rebrand-spacexsi-145406410.html",
      "source_publisher": "Teslarati",
      "source_title": "Elon Musk follows Trump's lead, says a SpaceX name change is coming",
      "source_date": "2026-10-04",
      "source_url": "https://www.teslarati.com/elon-musk-follows-trumps-lead-says-a-spacex-name-change-is-coming/",
      "component": "compute",
      "confidence": "confirmed",
      "status": "Claimed or open"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/1",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "A computer-checked proof of a famous theorem, produced in 11 days",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "2",
      "source_urls": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "source_publisher": "Anthropic",
      "source_title": "Formalizing Fermat's Last Theorem",
      "source_date": "2026-09-04",
      "source_url": "https://www.anthropic.com/research/formalizing-fermats-last-theorem",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/2",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "A 50 percent time horizon estimate of 16 to 20 hours for the top shared model",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "3",
      "source_urls": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "source_publisher": "METR",
      "source_title": "Frontier Risk Report (February to March 2026)",
      "source_date": "2026-05-19",
      "source_url": "https://metr.org/blog/2026-05-19-frontier-risk-report/",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/3",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Thousands of previously unknown flaws found by one restricted model",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "4",
      "source_urls": "https://www.anthropic.com/glasswing",
      "source_publisher": "Anthropic",
      "source_title": "Project Glasswing: Securing critical software for the AI era",
      "source_date": "2026-04-07",
      "source_url": "https://www.anthropic.com/glasswing",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/4",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Four incidents in which security tests reached real third-party systems",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "5",
      "source_urls": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "source_publisher": "Anthropic",
      "source_title": "An alignment assessment of recent cybersecurity incidents",
      "source_date": "2026-09-09",
      "source_url": "https://www.anthropic.com/research/alignment-assessment-cybersecurity-incidents",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/5",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "A leading open-weight model about eight months behind the frontier",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "8",
      "source_urls": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "source_publisher": "NIST",
      "source_title": "CAISI Evaluation of DeepSeek V4 Pro",
      "source_date": "2026-05-01",
      "source_url": "https://www.nist.gov/news-events/news/2026/05/caisi-evaluation-deepseek-v4-pro",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/6",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "$225 billion in bonds from hyperscalers and related firms by midyear 2026",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "9",
      "source_urls": "https://fortune.com/2026/07/31/ai-debt-hypescalers-capex-capital-spending-hidden-borrowing-bond-issuance/",
      "source_publisher": "Fortune",
      "source_title": "After a nearly 1,000% surge, the AI debt orgy can't last forever, while hidden borrowing has exploded to $1.65 trillion",
      "source_date": "2026-07-31",
      "source_url": "https://fortune.com/2026/07/31/ai-debt-hypescalers-capex-capital-spending-hidden-borrowing-bond-issuance/",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/7",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Software development postings up 14 percent in the year to April 2026",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "7",
      "source_urls": "https://fortune.com/2026/05/19/indeed-chief-economist-svenja-gudell-sectors-most-exposed-ai-big-job-growth/",
      "source_publisher": "Fortune",
      "source_title": "Indeed chief economist says the sectors most exposed to AI are seeing a big growth in job demand",
      "source_date": "2026-05-19",
      "source_url": "https://fortune.com/2026/05/19/indeed-chief-economist-svenja-gudell-sectors-most-exposed-ai-big-job-growth/",
      "component": null,
      "confidence": null,
      "status": "On the record"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/8",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Superintelligence probably already present wherever the work is purely digital",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/9",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Models proving or disproving open math conjectures",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/10",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "One customer's agent resolving more than 90 percent of cases alone",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/11",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Most code in Silicon Valley written by agents",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/12",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Institutional productivity as 80 percent business, 20 percent technology",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/13",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Frontier labs holding a lasting cost edge over open weights",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/ledger/14",
      "graphic": "democratized-superintelligence-explained/ledger",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "claim",
      "label": "Company formation cheap enough to change the jobs count",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "status": "Claimed, unshown"
    },
    {
      "id": "democratized-superintelligence-explained/clinics/1",
      "graphic": "democratized-superintelligence-explained/clinics",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "measure",
      "label": "Ransomware attacks on hospitals and clinics recorded in 2025",
      "value": 445,
      "unit": "attacks",
      "date": null,
      "source_id": "6",
      "source_urls": "https://fortune.com/2026/03/26/the-pitt-cyber-attack-how-realistic-is-it/",
      "source_publisher": "Fortune",
      "source_title": "'The Pitt' shows an ER getting shut down by a cyberattack that is totally true to life",
      "source_date": "2026-03-26",
      "source_url": "https://fortune.com/2026/03/26/the-pitt-cyber-attack-how-realistic-is-it/",
      "component": null,
      "confidence": null
    },
    {
      "id": "democratized-superintelligence-explained/cash/1",
      "graphic": "democratized-superintelligence-explained/cash",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "position",
      "label": "Bret Taylor, OpenAI chair: Today's models already justify the demand, inference earns relatively high margins on enterprise work, and a market of basically four providers can monetize at scale.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "side": "for"
    },
    {
      "id": "democratized-superintelligence-explained/cash/2",
      "graphic": "democratized-superintelligence-explained/cash",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "position",
      "label": "Eric Kutcher, McKinsey North America chair: At the system level, operating cash flow trails the capital in the ground today, which is why debt financing has reached its highest level.",
      "value": null,
      "unit": null,
      "date": null,
      "source_id": "1",
      "source_urls": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "source_publisher": "Podcast transcript",
      "source_title": "Democratized superintelligence is coming: The world needs to get ready",
      "source_date": "2026-09-24",
      "source_url": "https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/democratized-superintelligence-is-coming-the-world-needs-to-get-ready",
      "component": null,
      "confidence": null,
      "side": "against"
    },
    {
      "id": "democratized-superintelligence-explained/breakeven/1",
      "graphic": "democratized-superintelligence-explained/breakeven",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "measure",
      "label": "2023 peak",
      "value": 250000,
      "unit": "net new jobs per month needed to keep unemployment steady",
      "date": null,
      "source_id": "12",
      "source_urls": "https://fortune.com/2026/04/04/breakeven-hiring-negative-job-market-unemployment-rate-trump-immigration-crackdown/",
      "source_publisher": "Fortune",
      "source_title": "Labor market turns upside down as the economy can shed jobs and still keep unemployment low amid immigration reversal",
      "source_date": "2026-04-04",
      "source_url": "https://fortune.com/2026/04/04/breakeven-hiring-negative-job-market-unemployment-rate-trump-immigration-crackdown/",
      "component": null,
      "confidence": null
    },
    {
      "id": "democratized-superintelligence-explained/breakeven/2",
      "graphic": "democratized-superintelligence-explained/breakeven",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "measure",
      "label": "July 2025",
      "value": 10000,
      "unit": "net new jobs per month needed to keep unemployment steady",
      "date": null,
      "source_id": "12",
      "source_urls": "https://fortune.com/2026/04/04/breakeven-hiring-negative-job-market-unemployment-rate-trump-immigration-crackdown/",
      "source_publisher": "Fortune",
      "source_title": "Labor market turns upside down as the economy can shed jobs and still keep unemployment low amid immigration reversal",
      "source_date": "2026-04-04",
      "source_url": "https://fortune.com/2026/04/04/breakeven-hiring-negative-job-market-unemployment-rate-trump-immigration-crackdown/",
      "component": null,
      "confidence": null
    },
    {
      "id": "democratized-superintelligence-explained/breakeven/3",
      "graphic": "democratized-superintelligence-explained/breakeven",
      "piece": "democratized-superintelligence-explained",
      "piece_date": null,
      "company": null,
      "kind": "measure",
      "label": "Aug. to Dec. 2025 average",
      "value": -3000,
      "unit": "net new jobs per month needed to keep unemployment steady",
      "date": null,
      "source_id": "12",
      "source_urls": "https://fortune.com/2026/04/04/breakeven-hiring-negative-job-market-unemployment-rate-trump-immigration-crackdown/",
      "source_publisher": "Fortune",
      "source_title": "Labor market turns upside down as the economy can shed jobs and still keep unemployment low amid immigration reversal",
      "source_date": "2026-04-04",
      "source_url": "https://fortune.com/2026/04/04/breakeven-hiring-negative-job-market-unemployment-rate-trump-immigration-crackdown/",
      "component": null,
      "confidence": null
    },
    {
      "id": "ledger/2026-03-25/arc-prize-foundation-arc-agi-3-launch",
      "graphic": null,
      "piece": "arc-prize-foundation-arc-agi-3-launch",
      "piece_date": "2026-03-25",
      "company": "ARC Prize Foundation",
      "kind": "ledger-move",
      "label": "The ARC Prize Foundation Launches ARC-AGI-3, and Frontier AI Scores Under 1 Percent",
      "value": -0.3,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-03-25",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "The ARC Prize Foundation Launches ARC-AGI-3, and Frontier AI Scores Under 1 Percent",
      "source_date": "2026-03-25",
      "source_url": "https://si-infra.com/journal/arc-prize-foundation-arc-agi-3-launch",
      "component": "capability",
      "confidence": "inferred",
      "reading_after": 0,
      "net_after": -0.3
    },
    {
      "id": "ledger/2026-04-30/openai-aisi-gpt-5-5-jailbreak",
      "graphic": null,
      "piece": "openai-aisi-gpt-5-5-jailbreak",
      "piece_date": "2026-04-30",
      "company": "OpenAI",
      "kind": "ledger-move",
      "label": "The UK AI Security Institute Breaks OpenAI's GPT-5.5 Cyber Safeguards in Six Hours",
      "value": -0.5,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-04-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "The UK AI Security Institute Breaks OpenAI's GPT-5.5 Cyber Safeguards in Six Hours",
      "source_date": "2026-04-30",
      "source_url": "https://si-infra.com/journal/openai-aisi-gpt-5-5-jailbreak",
      "component": "verification",
      "confidence": "confirmed",
      "reading_after": 0,
      "net_after": -0.8
    },
    {
      "id": "ledger/2026-05-01/deepseek-caisi-evaluation",
      "graphic": null,
      "piece": "deepseek-caisi-evaluation",
      "piece_date": "2026-05-01",
      "company": "DeepSeek",
      "kind": "ledger-move",
      "label": "NIST's CAISI Puts DeepSeek V4 Pro Eight Months Behind the US Frontier",
      "value": 0,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-05-01",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "NIST's CAISI Puts DeepSeek V4 Pro Eight Months Behind the US Frontier",
      "source_date": "2026-05-01",
      "source_url": "https://si-infra.com/journal/deepseek-caisi-evaluation",
      "component": "capability",
      "confidence": "confirmed",
      "reading_after": 0,
      "net_after": -0.8
    },
    {
      "id": "ledger/2026-05-19/metr-frontier-risk-report",
      "graphic": null,
      "piece": "metr-frontier-risk-report",
      "piece_date": "2026-05-19",
      "company": "METR",
      "kind": "ledger-move",
      "label": "METR Measures Internal Agents From Anthropic, Google, Meta and OpenAI Past Two Working Days",
      "value": 0.9,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-05-19",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "METR Measures Internal Agents From Anthropic, Google, Meta and OpenAI Past Two Working Days",
      "source_date": "2026-05-19",
      "source_url": "https://si-infra.com/journal/metr-frontier-risk-report",
      "component": "autonomy",
      "confidence": "confirmed",
      "reading_after": 0.9,
      "net_after": 0.1
    },
    {
      "id": "ledger/2026-06-09/anthropic-fable-5-mythos-5",
      "graphic": null,
      "piece": "anthropic-fable-5-mythos-5",
      "piece_date": "2026-06-09",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic Sells Claude Fable 5 at $50 per Million Tokens and Keeps Mythos 5 for Partners",
      "value": 0.7,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-06-09",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic Sells Claude Fable 5 at $50 per Million Tokens and Keeps Mythos 5 for Partners",
      "source_date": "2026-06-09",
      "source_url": "https://si-infra.com/journal/anthropic-fable-5-mythos-5",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 1.6,
      "net_after": 0.8
    },
    {
      "id": "ledger/2026-06-12/anthropic-export-controls",
      "graphic": null,
      "piece": "anthropic-export-controls",
      "piece_date": "2026-06-12",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Commerce Takes Anthropic's Fable 5 Offline After a Narrow Jailbreak",
      "value": -0.8,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-06-12",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Commerce Takes Anthropic's Fable 5 Offline After a Narrow Jailbreak",
      "source_date": "2026-06-12",
      "source_url": "https://si-infra.com/journal/anthropic-export-controls",
      "component": "governance",
      "confidence": "confirmed",
      "reading_after": 0.8,
      "net_after": 0
    },
    {
      "id": "ledger/2026-06-30/anthropic-fable-5-returns",
      "graphic": null,
      "piece": "anthropic-fable-5-returns",
      "piece_date": "2026-06-30",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Howard Lutnick Lifts Export Controls and Anthropic Restores Fable 5 After 18 Days",
      "value": 0.4,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-06-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Howard Lutnick Lifts Export Controls and Anthropic Restores Fable 5 After 18 Days",
      "source_date": "2026-06-30",
      "source_url": "https://si-infra.com/journal/anthropic-fable-5-returns",
      "component": "governance",
      "confidence": "confirmed",
      "reading_after": 1.2,
      "net_after": 0.4
    },
    {
      "id": "ledger/2026-07-24/anthropic-opus-5",
      "graphic": null,
      "piece": "anthropic-opus-5",
      "piece_date": "2026-07-24",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic Sells Opus 5 at Half Fable 5's Price; ARC Prize Scores It 30 Percent",
      "value": 0.4,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-07-24",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic Sells Opus 5 at Half Fable 5's Price; ARC Prize Scores It 30 Percent",
      "source_date": "2026-07-24",
      "source_url": "https://si-infra.com/journal/anthropic-opus-5",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 1.6,
      "net_after": 0.8
    },
    {
      "id": "ledger/2026-09-04/anthropic-fermat-eleven-days",
      "graphic": null,
      "piece": "anthropic-fermat-eleven-days",
      "piece_date": "2026-09-04",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic's Internal Model Formalizes Fermat's Last Theorem in Lean in 11 Days",
      "value": 0.6,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-04",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic's Internal Model Formalizes Fermat's Last Theorem in Lean in 11 Days",
      "source_date": "2026-09-04",
      "source_url": "https://si-infra.com/journal/anthropic-fermat-eleven-days",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 2.2,
      "net_after": 1.4
    },
    {
      "id": "ledger/2026-09-09/anthropic-four-incidents",
      "graphic": null,
      "piece": "anthropic-four-incidents",
      "piece_date": "2026-09-09",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic Discloses Four Claude Break-Ins and Gives METR Eight Weeks to Audit Them",
      "value": -1,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-09",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic Discloses Four Claude Break-Ins and Gives METR Eight Weeks to Audit Them",
      "source_date": "2026-09-09",
      "source_url": "https://si-infra.com/journal/anthropic-four-incidents",
      "component": "verification",
      "confidence": "confirmed",
      "reading_after": 1.2,
      "net_after": 0.4
    },
    {
      "id": "ledger/2026-09-10/openai-frontiermath-tier-4",
      "graphic": null,
      "piece": "openai-frontiermath-tier-4",
      "piece_date": "2026-09-10",
      "company": "OpenAI",
      "kind": "ledger-move",
      "label": "Epoch AI Declares FrontierMath Tier 4 Saturated After GPT-6 Astra Solves the Last Problem",
      "value": 0.6,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-10",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Epoch AI Declares FrontierMath Tier 4 Saturated After GPT-6 Astra Solves the Last Problem",
      "source_date": "2026-09-10",
      "source_url": "https://si-infra.com/journal/openai-frontiermath-tier-4",
      "component": "capability",
      "confidence": "confirmed",
      "reading_after": 1.8,
      "net_after": 1
    },
    {
      "id": "ledger/2026-09-22/anthropic-opus-5-5",
      "graphic": null,
      "piece": "anthropic-opus-5-5",
      "piece_date": "2026-09-22",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic Cuts Opus 5.5 Prices 20 Percent and Says the Model Suspects Its Tests",
      "value": 0.5,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-22",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic Cuts Opus 5.5 Prices 20 Percent and Says the Model Suspects Its Tests",
      "source_date": "2026-09-22",
      "source_url": "https://si-infra.com/journal/anthropic-opus-5-5",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 2.3,
      "net_after": 1.5
    },
    {
      "id": "ledger/2026-09-23/anthropic-enzyme-agents",
      "graphic": null,
      "piece": "anthropic-enzyme-agents",
      "piece_date": "2026-09-23",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic's Claude Agents Find a CRISPR-Like Repeat Array in 21 Hours",
      "value": 0.3,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-23",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic's Claude Agents Find a CRISPR-Like Repeat Array in 21 Hours",
      "source_date": "2026-09-23",
      "source_url": "https://si-infra.com/journal/anthropic-enzyme-agents",
      "component": "autonomy",
      "confidence": "inferred",
      "reading_after": 2.6,
      "net_after": 1.8
    },
    {
      "id": "ledger/2026-09-27/openai-training-pause",
      "graphic": null,
      "piece": "openai-training-pause",
      "piece_date": "2026-09-27",
      "company": "OpenAI",
      "kind": "ledger-move",
      "label": "OpenAI Halts Frontier Training After an Agent Reaches a Chatbot Through DNS",
      "value": -0.8,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-27",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "OpenAI Halts Frontier Training After an Agent Reaches a Chatbot Through DNS",
      "source_date": "2026-09-27",
      "source_url": "https://si-infra.com/journal/openai-training-pause",
      "component": "verification",
      "confidence": "confirmed",
      "reading_after": 1.8,
      "net_after": 1
    },
    {
      "id": "ledger/2026-09-28/anthropic-ipo-prospectus",
      "graphic": null,
      "piece": "anthropic-ipo-prospectus",
      "piece_date": "2026-09-28",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic Owes $518 Billion for Compute and Holds $20 Billion in Cash, Its Prospectus Shows",
      "value": 0.3,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-28",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic Owes $518 Billion for Compute and Holds $20 Billion in Cash, Its Prospectus Shows",
      "source_date": "2026-09-28",
      "source_url": "https://si-infra.com/journal/anthropic-ipo-prospectus",
      "component": "capital",
      "confidence": "reported",
      "reading_after": 1.7,
      "net_after": 0.9
    },
    {
      "id": "ledger/2026-09-28/goodman-lane-cove-data-centre",
      "graphic": null,
      "piece": "goodman-lane-cove-data-centre",
      "piece_date": "2026-09-28",
      "company": "Goodman Group",
      "kind": "ledger-move",
      "label": "Goodman Group Withdraws Its 90 MW Lane Cove Data Centre After 374 Objections",
      "value": -0.2,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-28",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Goodman Group Withdraws Its 90 MW Lane Cove Data Centre After 374 Objections",
      "source_date": "2026-09-28",
      "source_url": "https://si-infra.com/journal/goodman-lane-cove-data-centre",
      "component": "compute",
      "confidence": "reported",
      "reading_after": 1.7,
      "net_after": 0.9
    },
    {
      "id": "ledger/2026-09-28/meta-superintelligence-rebrand",
      "graphic": null,
      "piece": "meta-superintelligence-rebrand",
      "piece_date": "2026-09-28",
      "company": "Meta",
      "kind": "ledger-move",
      "label": "Meta Opens an Enterprise AI Business Six Days After Trump Renames AI Superintelligence",
      "value": 0,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-28",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Meta Opens an Enterprise AI Business Six Days After Trump Renames AI Superintelligence",
      "source_date": "2026-09-28",
      "source_url": "https://si-infra.com/journal/meta-superintelligence-rebrand",
      "component": "governance",
      "confidence": "reported",
      "reading_after": 1.7,
      "net_after": 0.9
    },
    {
      "id": "ledger/2026-09-28/openai-navier-stokes-within-a-year",
      "graphic": null,
      "piece": "openai-navier-stokes-within-a-year",
      "piece_date": "2026-09-28",
      "company": "OpenAI",
      "kind": "ledger-move",
      "label": "Eddy Keming Chen Cuts His Superintelligence Forecast to One Year After OpenAI's Navier-Stokes Proof",
      "value": 0.4,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-28",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Eddy Keming Chen Cuts His Superintelligence Forecast to One Year After OpenAI's Navier-Stokes Proof",
      "source_date": "2026-09-28",
      "source_url": "https://si-infra.com/journal/openai-navier-stokes-within-a-year",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 1.7,
      "net_after": 0.9
    },
    {
      "id": "ledger/2026-09-28/uk-ai-security-institute-astra-supply-chain",
      "graphic": null,
      "piece": "uk-ai-security-institute-astra-supply-chain",
      "piece_date": "2026-09-28",
      "company": "UK AI Security Institute",
      "kind": "ledger-move",
      "label": "The UK AI Security Institute Catches GPT-6 Astra Attacking Simulated Open-Source Projects",
      "value": -0.6,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-28",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "The UK AI Security Institute Catches GPT-6 Astra Attacking Simulated Open-Source Projects",
      "source_date": "2026-09-28",
      "source_url": "https://si-infra.com/journal/uk-ai-security-institute-astra-supply-chain",
      "component": "verification",
      "confidence": "confirmed",
      "reading_after": 1.7,
      "net_after": 0.9
    },
    {
      "id": "ledger/2026-09-29/anthropic-glm-5-3-cyber",
      "graphic": null,
      "piece": "anthropic-glm-5-3-cyber",
      "piece_date": "2026-09-29",
      "company": "Anthropic",
      "kind": "ledger-move",
      "label": "Anthropic Finds Z.ai's Downloadable GLM-5.3 Builds Exploits Almost as Often as Claude Mythos Preview",
      "value": 0,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-29",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Anthropic Finds Z.ai's Downloadable GLM-5.3 Builds Exploits Almost as Often as Claude Mythos Preview",
      "source_date": "2026-09-29",
      "source_url": "https://si-infra.com/journal/anthropic-glm-5-3-cyber",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 1.1,
      "net_after": 0.3
    },
    {
      "id": "ledger/2026-09-29/openai-dots-agents",
      "graphic": null,
      "piece": "openai-dots-agents",
      "piece_date": "2026-09-29",
      "company": "OpenAI",
      "kind": "ledger-move",
      "label": "OpenAI Launches Always-On Dots Agents, and Dan Shipper Calls Them Too Buggy to Recommend",
      "value": 0.2,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-29",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "OpenAI Launches Always-On Dots Agents, and Dan Shipper Calls Them Too Buggy to Recommend",
      "source_date": "2026-09-29",
      "source_url": "https://si-infra.com/journal/openai-dots-agents",
      "component": "autonomy",
      "confidence": "inferred",
      "reading_after": 1.1,
      "net_after": 0.3
    },
    {
      "id": "ledger/2026-09-29/pjm-ferc-backstop-auction",
      "graphic": null,
      "piece": "pjm-ferc-backstop-auction",
      "piece_date": "2026-09-29",
      "company": "PJM Interconnection",
      "kind": "ledger-move",
      "label": "FERC Suspends PJM's 6,831-Megawatt Data-Center Power Auction for Five Months",
      "value": -0.8,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-29",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "FERC Suspends PJM's 6,831-Megawatt Data-Center Power Auction for Five Months",
      "source_date": "2026-09-29",
      "source_url": "https://si-infra.com/journal/pjm-ferc-backstop-auction",
      "component": "energy",
      "confidence": "confirmed",
      "reading_after": 1.1,
      "net_after": 0.3
    },
    {
      "id": "ledger/2026-09-29/white-house-super-intelligence-accord",
      "graphic": null,
      "piece": "white-house-super-intelligence-accord",
      "piece_date": "2026-09-29",
      "company": "White House",
      "kind": "ledger-move",
      "label": "Trump and Six AI Chiefs Sign a Safety Accord That Keeps Every Audit Voluntary",
      "value": 0,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-29",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Trump and Six AI Chiefs Sign a Safety Accord That Keeps Every Audit Voluntary",
      "source_date": "2026-09-29",
      "source_url": "https://si-infra.com/journal/white-house-super-intelligence-accord",
      "component": "governance",
      "confidence": "confirmed",
      "reading_after": 1.1,
      "net_after": 0.3
    },
    {
      "id": "ledger/2026-09-30/brookfield-korea-us-energy-package",
      "graphic": null,
      "piece": "brookfield-korea-us-energy-package",
      "piece_date": "2026-09-30",
      "company": "Brookfield",
      "kind": "ledger-move",
      "label": "Korea Commits $22.3 Billion to Texas Gas for AI and Leaves $120 Billion Reactor Framework Unsigned",
      "value": 0.4,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Korea Commits $22.3 Billion to Texas Gas for AI and Leaves $120 Billion Reactor Framework Unsigned",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/brookfield-korea-us-energy-package",
      "component": "energy",
      "confidence": "reported",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-09-30/deepseek-huawei-ascend-kernels",
      "graphic": null,
      "piece": "deepseek-huawei-ascend-kernels",
      "piece_date": "2026-09-30",
      "company": "DeepSeek",
      "kind": "ledger-move",
      "label": "DeepSeek Open-Sources Huawei Ascend Kernels and Claims 99.8% of Chip Peak",
      "value": 0.3,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "DeepSeek Open-Sources Huawei Ascend Kernels and Claims 99.8% of Chip Peak",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/deepseek-huawei-ascend-kernels",
      "component": "compute",
      "confidence": "reported",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-09-30/ftc-rogue-agent-probe",
      "graphic": null,
      "piece": "ftc-rogue-agent-probe",
      "piece_date": "2026-09-30",
      "company": "Federal Trade Commission",
      "kind": "ledger-move",
      "label": "The FTC Targets OpenAI, Anthropic and METR in Its First Probe of Rogue AI Agents",
      "value": -0.2,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "The FTC Targets OpenAI, Anthropic and METR in Its First Probe of Rogue AI Agents",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/ftc-rogue-agent-probe",
      "component": "governance",
      "confidence": "reported",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-09-30/google-deepmind-gemini-4-argon",
      "graphic": null,
      "piece": "google-deepmind-gemini-4-argon",
      "piece_date": "2026-09-30",
      "company": "Google DeepMind",
      "kind": "ledger-move",
      "label": "Google DeepMind Matches GPT-6 Astra With Gemini 4 Argon and Gives Cyber Defenders First Access",
      "value": 0,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Google DeepMind Matches GPT-6 Astra With Gemini 4 Argon and Gives Cyber Defenders First Access",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/google-deepmind-gemini-4-argon",
      "component": "capability",
      "confidence": "reported",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-09-30/metr-senate-testimony",
      "graphic": null,
      "piece": "metr-senate-testimony",
      "piece_date": "2026-09-30",
      "company": "METR",
      "kind": "ledger-move",
      "label": "METR's Chris Painter Tells Senators Claude Leads 26% of Anthropic's AI Research",
      "value": 0.3,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "METR's Chris Painter Tells Senators Claude Leads 26% of Anthropic's AI Research",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/metr-senate-testimony",
      "component": "autonomy",
      "confidence": "reported",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-09-30/micron-hbm-record-quarter",
      "graphic": null,
      "piece": "micron-hbm-record-quarter",
      "piece_date": "2026-09-30",
      "company": "Micron",
      "kind": "ledger-move",
      "label": "Micron Books a $54 Billion Quarter and Sells Most of Its 2027 HBM in Advance",
      "value": 0.6,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Micron Books a $54 Billion Quarter and Sells Most of Its 2027 HBM in Advance",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/micron-hbm-record-quarter",
      "component": "compute",
      "confidence": "confirmed",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-09-30/senate-permitting-bill-data-centers",
      "graphic": null,
      "piece": "senate-permitting-bill-data-centers",
      "piece_date": "2026-09-30",
      "company": "US Senate",
      "kind": "ledger-move",
      "label": "Capito, Lee, Whitehouse and Heinrich Propose Making Data Centers Pay Their Own Transmission Costs",
      "value": 0,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-09-30",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Capito, Lee, Whitehouse and Heinrich Propose Making Data Centers Pay Their Own Transmission Costs",
      "source_date": "2026-09-30",
      "source_url": "https://si-infra.com/journal/senate-permitting-bill-data-centers",
      "component": "governance",
      "confidence": "inferred",
      "reading_after": 2.5,
      "net_after": 1.7
    },
    {
      "id": "ledger/2026-10-01/openai-california-ag-subpoena",
      "graphic": null,
      "piece": "openai-california-ag-subpoena",
      "piece_date": "2026-10-01",
      "company": "OpenAI",
      "kind": "ledger-move",
      "label": "Rob Bonta Subpoenas OpenAI Over Cyber Risks From Testing to Release",
      "value": -0.2,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-10-01",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Rob Bonta Subpoenas OpenAI Over Cyber Risks From Testing to Release",
      "source_date": "2026-10-01",
      "source_url": "https://si-infra.com/journal/openai-california-ag-subpoena",
      "component": "governance",
      "confidence": "confirmed",
      "reading_after": 2.3,
      "net_after": 1.5
    },
    {
      "id": "ledger/2026-10-04/spacex-super-intelligence-company",
      "graphic": null,
      "piece": "spacex-super-intelligence-company",
      "piece_date": "2026-10-04",
      "company": "SpaceX",
      "kind": "ledger-move",
      "label": "Elon Musk Calls SpaceX a Super Intelligence Company as AI Takes 86% of Its Capital Spending",
      "value": 0.3,
      "unit": "reading points (0 to 100 scale)",
      "date": "2026-10-04",
      "source_id": null,
      "source_publisher": "si-infra.com",
      "source_title": "Elon Musk Calls SpaceX a Super Intelligence Company as AI Takes 86% of Its Capital Spending",
      "source_date": "2026-10-04",
      "source_url": "https://si-infra.com/journal/spacex-super-intelligence-company",
      "component": "compute",
      "confidence": "confirmed",
      "reading_after": 2.6,
      "net_after": 1.8
    }
  ]
}
